EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Dewi Eka Agustina


Ansi Aflacha Putri


Tondo Indra Nyata


Aprillia Tri Wulansari


Moh. Fandika Aqsa




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Master Theses » Manajemen Industri-S2 MMT
Posted by aguss at 11/01/2007 11:11:35  •  19948 Views


PERENCANAAN SISTEM TENAGA LISTRIK DI JAWA - MADURA - BALI

ELECTRIC POWER SYSTEM PLANNING IN JAWA - MADURA - BALI

Created by :
Priambodo, Agoes 



SubjectTenaga listrik
Keywordelectric power installation

Description:

Sistem ketenagalistrikan Jawa - Madura - Bali (JAMALI) adalah suatu jaringan sistem tenaga listrik yang terhubung satu dengan yang lain melalui transmisi 500 KV dan 150 KV. Realisasi pembebanan sistem JAMALI dari tahun 1999 sampai dengan tahun 2003 mengalami kenaikan, rata-rata 5,54 % per tahun. Seiring dengan kenaikan beban, maka kapasitas instalasi ketenagalistrikan yang terpasang dalam kurun waktu tertentu akan tidak mencukupi, sehingga perlu dibangun instalasi baru. Dalam merencanakan pembangunan instalasi ketenagalistrikan yang baru perlu memperbitungkan besar uang yang diinvestasi serta biaya operasi yang rendah. Salah satu metode perencanan pembangunan instalasi ketenagalistrikan yang memperhitungkan biaya investasi dan operasi adalah Southern African Power Pool (SAPP). Model SAPP ini menggunakan metoda mixed integer programming, dan merupakan metode optimasi yang digunakan untuk merencanaan instalasi tenaga listrik untuk jangka panjang, dengan meminimasi biaya pembangkitan dan transmisi tenaga listrik. kurun waktu perencanaan pembangunan instalasi ketenagalistrikan 5 tahunan yang teVdiri periode 5 tahun pertama mulai 2004 - 2008 dan periode 5 tahun kedua mulai 2009 - 2013. Data yang digunakan adalah hasil evaluasi PLN dari tahun 1999 sampai dengan 2003 sistem JAMALI. Selanjutnya model dan data yang ada dijalankan dengan program komputer GAMS. Keluaran (output) program GAMS menunjukkan bahwa kebutuhan daya JAMALI periode 5 tahun pertama sebesar 18.633 MW dan periode 5 tahun kedua sebesar 25.060 MW. Kapasitas akhir pembangkit atau setelah periode 5 tahun kedua untuk Jabar a^alah sebesar 17.093,22 MW, Jateng sebesar 4.684,39 MW, Jatim sebesar 7.185,19 MW dan Bali sebesar 335 MW. Hasil perencanaannya menunjukkan bahwa tidak ada instalasi penyaluran yang dibangun, biaya pengembangan pembangkit baru sebesar Rp 67,551 T, dan biaya operasi pembangkit sebesar Rp 37,821 T.


Alt. Description

Jawa - Madura - Bali (JAMALI) electric power system is an electric power network interconnected through 500 kV and 150 kV transmission line. The realization of JAMALI load system from the year 1999 to 2003 increased, average 5,54 % per year. Together with load increase, so the electric power plan capacity installed in the certain time span will be overload, so it's necessary to build a new installation. In planning a new electric power plant construction needs to count how much money invested and operating cost. One of the electric power plant contruction planning methods which calculated the investment and operating cost is Southern African Power Pool (SAPP). This SAPP model uses the mbced integer programming method, and the form of optimism method used to plan a long term electric power installation by minimizing the generation and electric power transmissiori cost. In the five year electric power plant construction planning consist of the first 5 year period from 2004 to 2008 and the second 5 year period from 2009 to 2013. The used data is the PLN evaluation result from the year 1999 to JAMALI system in the year 2003. Futhermore, the model and data operated with software GAMS. The output of GAMS program shows that the demand of JAMALI power in the first 5 year is 18,633 MW and the second 5 year is 25.060 MW, the last generating capacity or after second 5 year period is West Jawa 17.093,22 MW, Central Jawa 4.684,39 MW, East Jawa 7.185,19 MW, and Bali 335 MW. There is no transmission installation built, the new power plant construction cost is Rp 67.551 T, the cost of generating operation is Rp 37.821 T.

Contributor:
  1. Ir. Bobby Oedy P. Soepangkat MSc, PhD
    Nurhadi Siswanto ST., MSIE.
Date Create:11/01/2007
Type:Text
Format:pdf
Language:Indonesian
Identifier:ITS-Master-31000005022873
Collection ID:31000005022873
Call Number:621.31 Pri p


Source :
Theses Industrial Management RTMM 621.31 Pri p, 2005

Coverage :
ITS Community

Rights :
Copyright @2005 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/perencanaan-sistem-tenaga-listrik-di-jawa--madura--bali-1185.html




[ Free Download - Free for All ]

...No Files...

[ FullText Content - Please, register first ]

  1. ITS-Master-1185-9101201408-its-judul.pdf - 343 KB
  2. ITS-Master-1185-9101201408-its-bab1.pdf - 250 KB
  3. ITS-Master-1185-9101201408-its-bab2.pdf - 209 KB
  4. ITS-Master-1185-9101201408-its-bab3.pdf - 224 KB
  5. ITS-Master-1185-9101201408-its-bab4.pdf - 571 KB
  6. ITS-Master-1185-9101201408-its-bab5.pdf - 308 KB
  7. ITS-Master-1185-9101201408-its-babkesimp.pdf - 91 KB
  8. ITS-Master-1185-9101201408-its-lampiran.pdf - 1486 KB



Give your Comment here...


 10 Similar Document...



 10 Related Document...






HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

electric , electric power installation , installation , power



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




52189889


Visitors Today : 1
Total Visitor : 2515766

Hits Today : 39392
Total Hits : 52189889

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 10.199.13.5
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2014 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan