EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Proyek & Konstruksi S2
Posted by anis at 04/01/2007 08:21:39  •  21045 Views


PENGARUH NILAI PENAWARAN KONTRAKTOR TERHADAP PENYELESAIAN PROYEK STUDI KASUS PROYEK P3KT-BUIP SECTOR JALAN KOTA DENPASAR

THE INFLUENCE OF THE CONTRACTORS BIDDING OFFER TOWARDS THE COMPLETION OF A PROJECT A CASE STUDY OF P3KT-BUIP PROJECT DENPASAR CITY ROAD SECTOR

Author :
DIPUTRA, I MADE KUSUMA 




ABSTRAK

Untuk menunjang perkembangan Industri Pariwisata di Pulau Bali khususnya di Kota Denpasar Pemerintah Kota Denpasar mengikuti Program Proyek Pembangunan Prasarana Kota Terpadu atau Bali Urban Infrastructure Project P3KT - BUIP yang menangani 11 sebelas sektor Pembangunan Tesis ini membahas permasalahan pelelangan dan hasil penyelesaian proyek pada proyek-proyek disektor Jalan Kota yang meliputi 17 tujuh belas paket proyek Peningkatan Jalan yang ditangani oleh Dinas Pekerjaan Umum Kota Denpasar Seksi Bina Marga yang dilaksanakan tahun 1999 sampai tahun 2001. Dari data pelelangan paket-paket proyek tersebut diperoleh besarnya nilai penawaran Kontraktor pemenang tender adalah mulai dari 072 sampai dengan 2782 dibawah nilai Owner Estimate OE. Hasil penelitian besarnya perbedaan penawaran Kontraktor terhadap OE tidak berpengaruh terhadap waktu penyelesaian proyek. Demikian pula selisih penawaran terendah I pemenang tender dengan penawaran terendah II pemenang cadangan dan besarnya prosentase nilai penawaran tertinggi terhadap OE tidak berpengaruh terhadap waktu penyelesaian pekerjaan proyek sedangkan besarnya perbedaan penawaran kontraktor dari OE ada pengaruhnya terhadap kualitas hasil pekerjaan proyek. Sebanyak 6470 atau 11 sebelas dari 17 tujuh belas paket proyek mengalami keterlambatan penyelesaian pekerjaan proyek disebabkan karena kapasitas produksi Aspalt Mixing Plan AMP tidak mampu mencukupi kebutuhan Aspal Hotmix yang diperlukan untuk menyelesaikan proyek pengaspalan jalan tepat pada waktunya. Biaya keterlambatan proyek dihitung dari biaya pemakaian jalan road user cost terayata 2 dua kali lebih besar daripada denda yang dikenakan kepada Kontraktor.


ABSTRACT

To support the tourism industry in Bali particularly in Denpasar City the Provincial Government of Denpasar adheres to the Bali Urban Infrastructure Project P3KT-BUIP covering 11 eleven development sectors. This thesis analyses the interaction of bidding project completion time and quality for city road sector projects covering 17 seventeen packages of road developments handled by the Public Work Service of Denpasar City Bina Marga section executed between 199 to 2001. The data of these projects indicates that the winning bids submitted by the contractors varies between 0.72 to 27.82 below the amount of the Owner Estimate OE. The result of this research shows that the magnitude of the differences of the contractors bid from the OE has no effect on the project completion time. Also the difference between the lowest bid winner and the next higher one substitute winner nor the percentage of the highest bidder compared to the OE do not effect the completion time. However the difference between the contractors bid and the OE effects the quality of the project. About 64.7 or 11 eleven of the packages were not finished on time. This was due to the incapability of the Asphalt Mixing Plan AMP to produce the required asphalt. The cost of project delays as calculated from the road users costs is twice the penalties levied to the contractors.



KeywordsPelelangan ; penawaran terendah ; keterlambatan ; biaya pemakaian jalan.
 
Subject:  Manajemen proyek
Contributor
  1. Ir. Rianto B. Adiharjo, MSc.Ph.D.
    Ir. I Dewa Ketut Sudarsana, MT
Date Create: 04/01/2007
Type: Text
Format: pdf; 95 pages
Language: Indonesian
Identifier: ITS-Master-3100002017144
Collection ID: 3100002017144
Call Number: 658.404 Dip p


Source
Theses Civil Engineering RT 658.404 Dip p, 2002

Coverage
ITS Community

Rights
Copyright @2002 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Master-3100002017144-595.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 3.210.201.170
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2020 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan