EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Proyek & Konstruksi S2
Posted by anis at 22/12/2006 16:36:47  •  8660 Views


INVESTMENT STUDY OF AN ASPHALT MIXING PLANT AMP OWNED BY PT. DUTASATRYA ADHIPERSADA IN BANJARBARU

Author :
WENAS, HERMANUS H. 




ABSTRAK

Untuk mendukung pembangunan di Propinsi Kalimantan Selatan diperlukan penyediaan infrastruktur jalan yang baik diantaranya untuk memacu pertumbuhan perkebunan kelapa sawit dan pertambangan Batubara yang ada saat ini. Penyediaan jalan yang baik dimaksudkan yaitu dengan meningkatkan mutu jalan dari aspal penetrasi Mac Adam menjadi aspal beton yang lebarnya 45 meter menjadi 6 meter. Untuk mencapai tujuan tersebut maka diperlukan pembangunan Asphalt Mixing Plant AMP yang memadai. Sampai saat ini sudah ada 12 AMP yang beroperasi di Kalimantan Selatan. Tetapi kebutuhan akan campuran aspal panas dan tuntutan proyek semakin tinggi sehingga perlu untuk membangun satu AMP lagi. Yang menjadi permasalahan adalah kelayakan pembangunan AMP tersebut sistem operasinya dan lokasi AMP tersebut agar dapat berfungsi secara optimal. Dari hasil analisis kelayakan proyek pembangunan AMP dengan total Investasi sebesar Rp.4.096.100.00000 dan menggunakan analisis finansial dan ekonomi diperoleh nilai BCR 1.078 sedikit diatas 100 NPV Rp 320.448.14600 IRR 1812 lebih dari MARR sebesar 15 dan payback periode selama 5 tahun sehingga investasi ini rentan terhadap perubahan harga material dan atau apabila produksi turun maka investasi akan mengalami kerugian.


ABSTRACT

To support the development in South Kalimantan Province including to enhance the growth of oil palm trees and coal mining available now it is required to provide with proper infrastructure. Providing proper roads is meant to improve the quality of roads from 4.5 meters width of Mac Adam penetration asphalt into 6 meter concrete asphalt. To accomplish such purpose it is required to develop an Asphalt Mixing Plant AMP properly. Up to present there are 12 AMPs operating in South Kalimantan. However due to high need of asphalt mixing and higher project ad demand it is necessary to build another AMP. The problem is the feasibility of such AMP construction its operation system and its location selection so as have maximal result. From the project feasibility analysis of the proposed AMP a total investment Rp.4.096.100.00000- is needed and applying financial and economic analysis it is found out that BCR 1078 value is a little above 1.00 NPV Rp 320.448.14600 IRR 1812 which is higher than MARR 15 and the payback period is 5 years therefore such investment is vulnerable to risk of material prices changing andor production decreasing which will cause damage loss.



KeywordsAMP; analis finansial; analis ekonomi; pemilihan lokasi ; AMP; financial analysis; economic analysis ; site selection.
 
Subject:  Aspal
Contributor
  1. Ir.Rianto B. Adihardjo,MSC.PhD
    DR.Ir.Rusdi HA, MSc
Date Create: 22/12/2006
Type: Text
Format: pdf; 64 pages
Language: Indonesian
Identifier: ITS-Master-3100003018397
Collection ID: 3100003019005
Call Number: 332.6 Wen s


Source
Theses Civil Engineering RTS 332.6 Wen s, 2003

Coverage
ITS Community

Rights
Copyright @2003 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Master-3100003019005-145.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan