EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Proyek & Konstruksi S2
Posted by yeni at 26/12/2006 09:42:08  •  24918 Views


PENILAIAN WASTE MATERIAL PADA PELAKSANAAN PROYEK PERUMAHAN STUDI KASUS PEMBANGUNAN RUMAH DI KAWASAN TANJUNG BUNGA MAKASSAR

WASTE MATERIAL EVALUATION AT HOUSING CONSTRUCTION PROJECT CASE STUDY OF HOUSE CONSTRUCTION IN TANJUNG BUNGA RESORT MAKASSAR

Author :
RAHIM , IRWAN RIDWAN  




ABSTRAK

Selama ini upaya penilaian terhadap waste material pada proyek perumahan jarang dilakukan di Indonesia. Hal ini disebabkan sebagian besar kontraktor menganggap besarnya waste material yang terjadi adalah konsekuensi dari proses pelaksanaan konstruksi. Padahal dengan mengetahui sumberpenyebab waste material dapat dilakukan upaya untuk mereduksi waste material yang terjadi sehingga biaya pelaksanaan dapat ditekan. Tesis ini mengambil studi kasus pelaksanaan pembangunan rumah tipe 36 tahap I di Kawasan Tanjung Bunga Makassar. Pada penelitian ini dilakukan penilaian terhadap waste material berdasarkan kriteria material-material penyebab waste sumber waste material dan pekerjaan-pekerjaan yang menyebabkan terjadihya waste material. Survey dan kuesioner dilakukan terhadap manajer dan tenaga lapangan dari kontraktor pelaksana kemudian hasilnya diolah menggunakan metode AHP Analytical Hierarchy Process dan uji ANOVA Analysis Of Variance. Hasil analisis menunjukkan bahwa material semen memiliki nilai waste terbesar sumber waste utamanya berasal dari sisa penggunaan material yang tidak terhindarkan pada material kayu waste terutama dari sisa pekerjaan bekisting pada material semen terutama dari sisa pekerjaan plasteran pada keramik terutama dari sisa pemasangan keramik ukuran 30X30 cm pada material batu bata terutama akibat kesalahan penanganan pada pembuatan dinding pada materia cat terutama akibat kesalahan penanganan pengecatan dasar meni pada material besi akibat kesalahan pengukuran. Penelitian ini juga memberikan solusi dalam upaya mereduksi waste serta rekomendasi koefisien waste yang dapat digunakan pada proyek tahap berikutnya. Kata kunci Waste material Proyek perumahan AHP.


ABSTRACT

Nowadays evaluation expedient of waste material at housing project seldom by performed in Indonesia. That caused by a lot of contractor opinion a large of waste material were consequence from construction process. Whereas known the source or caused of waste material can be reduced so that to decrease construction cost. This thesis take case study at housing construction project type 36 in the first stage in Tanjung Bunga Resort Makassar. The research evaluating the waste material that based on criteria materials that caused waste source of waste materials and activity that caused waste. Survey and questioner trough contractor manager and field supervisor then analyzed by prepare used AHP method Analytical Hierarchy Process and ANOVA test Analysis Of Variance. From result can be know that cement have the biggest waste material value mainly waste source of reminder material that hard to avoid at wood material of reminder material from form work at cement material of reminder mortar from wall plaster works at ceramic material of reminder material to tile 30x30 cm size at brick material of error handling from wall construction at cast iron material of measuring error. This research also give solution expedient for reducting the waste material and coefficient waste recommendation that can be used for the next stage project.



KeywordsWaste material; Proyek perumahan; AHP
 
Subject:  Manajemen Kualitas Total
Contributor
  1. Ir. R. SUTJIPTO, MSc
    TRIJOKO W.A., ST, MT.
Date Create: 26/12/2006
Type: Text
Format: pdf; 218 pages
Language: Indonesian
Identifier: ITS-Master-3100003018397
Collection ID: 3100002016909
Call Number: 519.538 rah p


Source
Teses Manajement Proyek dan Konstruksi RT 519.538 rah p, 2001

Coverage
ITS Community

Rights
Copyright @2001by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Master-3100002016909-255.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 34.204.171.108
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2019 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan