EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Moh. Fandika Aqsa


Tondo Indra Nyata


Ansi Aflacha Putri


Aprillia Tri Wulansari


Dewi Eka Agustina




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Master Theses » Manajemen Proyek & Konstruksi S2
Posted by tjuk at 26/12/2006 14:46:38  •  18669 Views


ANALISA INVESTASI ASPHALT MIXING PLANT (STUDI KASUS : AMP. PT. KARYA MAJU UTAMA BARABAI HST)

INVESTMENT ANALYSIS ON ASPHALT MIXING PLANT (Case Study: AMP. PT. Karya Maju Utama Barabai HST)

Created by :
Latief, Abdul 



SubjectInvestasi
KeywordInvestasi
AMP
analisis finansial
NPV
IRR
BCR.

Description:

Pertumbuhan pembangunan sarana dan prasarana yang pesat membuat kebutuhan hotmix semakin meningkat sehingga meningkatkan minat investor-investor yang ingin menanamkan modalnya pada usaha jasa Asphalt Mixing Plant. Berdasarkan data kapasitas produksi AMP yang sudah ada, kebutuhan akan aspal, schedule proyek setiap tahunnya, dan data proyek 5 (lima) tahun terakhir serta proyeksi proyek 5 (lima) tahun kedepan, maka akan dilakukan studi analisa apakah dengan penambahan 1 (satu) buah AMP masih layak dibangun bila ditinjau dari segi finansial. Tujuan dari penelitian ini adalah menentukan kebutuhan produksi aspal yang diperlukan untuk memenuhi kebutuhan kabupaten-kabupaten disekitar lokasi AMP dan pesaingnya, serta untuk menentukan kebutuhan produksi aspal yang diperlukan untuk memenuhi kebutuhan kabupaten-kabupaten disekitar lokasi AMP dan pesaingnya. Metode yang digunakan untuk perhitungan kebutuhan Aspal tersebut adalah analisa statistik dengan metode regresi sedangkan untuk analisa kelayakan investasi digunakan analisa NPV, IRR dan BCR. Sedangkan hasil analisa investasi diperoleh untuk investasi AMP PT. Karya Maju Utama di Barabai sebesar Rp 5.009.000.000,- adalah NPV = Rp 1.003.587.047,-, IRR = 27,49% , dan BCR = 1,20 dengan discount rate 17%. Jika produksi aspal menurun sampai 10% maka break event point harga aspal adalah Rp. 366.734,00. Kebutuhan aspal yang masih harus dipenuhi rata-rata per tahun adalah 49.349 ton. Angka tersebut menunjukkan bahwa investasi AMP layak dilaksanakan baik dari aspek finansial dan aspek teknis serta berdasarkan kebutuhan aspal.


Alt. Description

The vast improvement of the development of the infrastructure makes the need of hotmix increased too; there fore the investors are interested in investing their capital in the business of Asphalt Mixing Plant. According to the existing AMP production capacity data, the need of asphalt, annual project schedule, and the last five years project data and the projection of the next five years project, so the analysis study about the reasonability of the addition of one AMP to be built if it was looked from the financial. The objective of the research is to determine the need of asphalt production to fulfill the need of the regions around the AMP location and also the competitors, and also to determine the need of asphalt production to fulfill the need of the regions around the AMP location and also the competitors. The method that going to be used to calculate the need of asphalt is the statistics analysis with the regression method, and to the proper investment analysis, the NPV, IRR and BCR analysis are going to be used. And the investment analysis result for AMP. PT. Karya Maju Utama in Barabai around Rp. 5.009.000.000,- is NPV = Rp. 1.003.587.047,-, IRR = 27,49% and BCR = 1,20 with the discount rate around 17%. If the asphalt production decreased until 10% so the break event point of the asphalt price is Rp. 366.734,00. the rate of the need of asphalt to be fulfilled in a year is 49.349 tons. The number above shows that the AMP investment is still reasonable to be applied not only from the technical and financial aspect but also based on the need of asphalt.

Contributor:
  1. Ir. R. Sutjipto, MSc.
    Supani, ST, MT.
    Ir. Retna Hapsari K, MT.
Date Create:26/12/2006
Type:Text
Format:pdf, 60 pages
Language:Indonesian
Identifier:ITS-Master-3100003018397
Collection ID:3100006026075
Call Number:332.6 Lat a


Source :
Thesis Project and Construction Management RTS 332.6 Lat a, 2005

Coverage :
ITS Community only

Rights :
Copyright @2005 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/analisa-investasi-asphalt-mixing-plant-studi-kasus--amp-pt-karya-maju-utama-barabai-hst-273.html




[ Free Download - Free for All ]

...No Files...

[ FullText Content - Please, register first ]

...No Files...



Give your Comment here...


 10 Similar Document...



 10 Related Document...






HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

AMP , BCR. , IRR , Investasi , NPV , analisis , analisis finansial , finansial



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




55791527


Visitors Today : 1
Total Visitor : 2515856

Hits Today : 9879
Total Hits : 55791527

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 10.199.13.5
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2014 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan