 |
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
|
Phone |
: |
031-5921733 , 5923623 |
|
Fax |
: |
031-5937774 |
|
E-mail |
: |
libits@its.ac.id |
|
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
|
timit_perpus@its.ac.id |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Taufik Rachmanu  Dewi Eka Agustina  Ansi Aflacha Putri  Tondo Indra Nyata  Aprillia Tri Wulansari
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
ITS » Master Theses » Manajemen Industri-S2 MMT Posted by anis at 09/01/2007 17:33:13 • 26589 Views
PENERAPAN SISTEM MRP PADA PEMBANGUNAN KAPAL (STUDI KASUS PROYEK TANKER 6500 DWT) DI GALANGAN KAPAL PT.DOK DAN PERKAPALAN SURABAYA (PERSERO)
CLARIFICATION OF MRP SYSTEM IN SHIP BUILDING (THE PROJECT STUDY CASE OF TANKER 6500 DWT CASE)
Created by :
JUNAEDY, I WAYAN YOGA
| Subject: | Galangan kapal | | Keyword: | Galangan kapal Material Requirement Planning(MRP) Full Outfitting Block System (FOBS)
|
Description:
Industri galangan kapal sudah mengalami kemajuan teknologi yang sangat cepat sekali terutama galangan kapal luar negeri seperti Jepang, Korea dan Cina dimana mereka selalu mengembangkan teknologi baik itu teknologi pembangunan kapal, fasilitas dan sarana pendukung maupun teknologi manajemen galangan. Salah satu metode yang sudah diterapkan adalah manajemen material yaitu dengan menerapkan system material requirement planning (MRP) yang berbasis pada full outfitting block system (FOBS) dimana proses pembangunan kapal terintegrasi mulai dari perencanaan design, perencanaan dan control material sampai proses produksi sehingga mempercepat schedule penyelesaian proyek, menghemat biaya material dan pemakaian jam orang dan pada akhirnya akan menguntungkan galangan dengan memperoleh margin keuntungan yang lebih tinggi. Seharusnya galangan kapal di dalam negeri sudah menerapkan metode ini jika ingin bersaing dengan galangan lain, demikian juga halnya galangan kapal PT. Dok dan Perkapalan Surabaya (Persero) telah berdiri sejak tahun 1910 dan sampai saat ini masih belum sepenuhnya menerapkan manajemen material dengan tepat.
Kami melakukan analisa antara penerapan sistem perencanaan material konvensional pada proyek pembangunan kapal Tanker 6500 LTDW dengan nomer pembangunan N.559 dan penerapan system perencanaan MRP berbasis FOBS pada proyek pembangunan kapal Tanker 6500 LTDW dengan nomer pembangunan N.570, dimana analisa meliputi perencanaan design, perencanaan material dan proses produksi.
Dapat disimpulkan bahwa banyak sekali keuntungan yang kita peroleh pada pembangunan kapal dengan menerapkan system MRP berbasis FOBS yaitu antara lain, penghematan komponen biaya bahan mentah yaitu sebesar Rp. 1,5 Milyar, penghematan pemakaian jam orang tenaga langsung proyek sebesar Rp. 3,8 Milyar dan waktu pembangunan kapal menjadi lebih cepat.
Alt. Description
The dockyard industry has experienced very fast technology growth especially foreign dockyards like Japan, Korea and China where they always develop good technology that is die ship building technology, facility and Supporting equipment as well as dockyard management technology. One of the method that is already done is materials management by doing Material Requirement Planning (MRP) based on Full Outfitting Block System (FOBS) where the ship building process integrates from design planning, planning and control material up to the production process so us to speed up the schedule to finish the project, be thrifty material costs and labor costs and in the end will benefit docking by receiving a higher profit margin. Actually domestic ship docking already does this method if wanting to compete with other docking, also the same thing with PT. Dock and Perkapalan Surabaya (persero) already established sincel910 until now still haven't completely done correct material management
The analysis of the conventional material planning application system in the tanker 6500 LTDW ship building project with building number N559 and tanker 6500 LTDW ship building project with building number N570 in the MRP based FOBS application planning system where analysis involves design planning, material and process production planning.
The conclusions that most of our profit in ship building with doing MRP systems based on FOBS, which conserve cost components of raw materials which Rp.l and Rp. 1,5 billion, cost serve labor cost as much Rp. 3,8 billion and quicker time in building ships.
| Contributor | : |
- Drs. Haryono, MSIE
| | Date Create | : | 09/01/2007 | | Type | : | Text | | Format | : | pdf ; 156 pages | | Language | : | Indonesian | | Identifier | : | ITS-Master-3100006026332 | | Collection ID | : | 3100006026332 | | Call Number | : | 623.83 Jun p |
Source : Theses Industry Management RTMT 623.83 Jun p, 2005
Coverage : ITS Community
Rights : Copyright @2005 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library
Publication URL : http://digilib.its.ac.id/penerapan-sistem-mrp-pada-pembangunan-kapal-studi-kasus-proyek-tanker-6500-dwt-di-galangan-kapal-ptdok-dan-perkapalan-surabaya-persero-1091.html
[ Free Download - Free for All ]
...No Files...
[ FullText Content - Please, register first ]
1. ITS-Master-1091-9100201412-its-judul.pdf - 2256 KB 2. ITS-Master-1091-9100201412-its-bab1.pdf - 142 KB 3. ITS-Master-1091-9100201412-its-bab2.pdf - 771 KB 4. ITS-Master-1091-9100201412-its-bab3.pdf - 44 KB 5. ITS-Master-1091-9100201412-its-bab4.pdf - 1305 KB 6. ITS-Master-1091-9100201412-its-bab5.pdf - 1632 KB 7. ITS-Master-1091-9100201412-its-babkesimp.pdf - 481 KB 8. ITS-Master-1091-9100201412-its-lampiran.pdf - 2950 KB
Give your Comment here...
10 Similar Document...
10 Related Document...
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?

      
Visitors Today : 1127
Total Visitor : 1528146
Hits Today : 20882
Total Hits : 25897740
Visitors Online: 53
Calculated since 16 May 2012
You are connected from 50.16.132.180 using CCBot/2.0
|