EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Industri-S2 MMT
Posted by hassane at 18/12/2008 07:21:18  •  13269 Views


PERENCANAAN PEMELIHARAAN JANGKA PANJANG BERDASARKAN ASSESMEN AVAILABILITAS DI PLTU PAITON UNIT 7 DAN 8

LONG TERM MAINTENANCE PLANNING USING AVAILABILITY ASSESMENT IN UNIT 78 PAITON COAL FIRED POWER PLANT

Author :
Ichwan, Amirul 




ABSTRAK

Dalam industri penyedia tenaga listrik availabilitas merupakan indikator utama dalam penilaian performa sebuah unit pembangkit. PLTU Paiton 78 sebagai sebuah perusahaan pembangkit listrik swasta Independent Power Producer menjual produk listriknya melalui sebuah mekanisme kontrak jual beli listrik dengan PT.PLN yang dituangkan dalam power purchasing agreement PPA. Dalam PPA availabilitas PLTU Paiton 78 telah ditetapkan minimum sebesar 85 untuk masa kontrak hingga tahun 2039. Pencapaian target availabilitas sebuah pembangkit tergantung pada kehandalan unit pembangkit serta sejauh mana efektifitas pemeliharaan yang telah dilakukan untuk meminimalkan plant down time karena kegiatan pemeliharaan yang terjadwal maupun kegiatan pemeliharaan yang tidak terjadwal. Pemeliharaan terjadwal untuk sebuah pembangkit listrik tenaga uap PLTU mencatat persentasi terbesar dalam perhitungan lost availability. Untuk merencanakan jadwal pemeliharaan yang optimal pemeliharaan terjadwal PLTU Paiton 78 disusun berdasarkan siklus pemeliharaan 8 tahunan. Selanjutnya dengan menggunakan jadwal pemeliharaan yang telah ditetapkan assesmen availabilitas dilakukan dengan metode simulasi melalui model availability block diagram ABD. Hasil assemen yang dilakukan menunjukan bahwa PLTU Paiton 78 akan mampu memenuhi target availabilitas dalam PPA Angka rata-rata availabilitas yang disepakati dalam PPA masih jauh dibawah nilai hasil assesmen yaitu 89.8 sehingga target availabilitas secara optimis dapat dicapai oleh pembangkit terpasang selama masa kontrak hingga 2039 simulasi diperoleh komponen-komponen kritis dalam sistem PLTU Paiton 78 yang memiliki kontribusi besar pada equivalent forced outage rate EFOR. Dengan mengetahui komponen kritis dalam sistem pembangkit maka strategi pemeliharaan yang tepat dapat dirancang. Selanjutnya dengan membandingkan hasil assesmen dan data historis pembangkit terpasang akan diperoleh gambaran tentang efektifitas pemeliharaan yang telah dilakukan.


ABSTRACT

In the business of electric power producer availability is a key plant performance indicator. As part of an independent power producer unit 78 Paiton coal fired power plant PLTU Paiton 78 sell their electric production to PT.PLN based on power purchasing agreement PPA. The 40 year average availability factor for PLTU Paiton 78 is 85 as covered under term of PPA. The PPA availability goal of 85 will be achievable if an effectiveness of maintenance actions can be performed which lead to reducing plant down time due to scheduled and unscheduled maintenance. In general scheduled planned maintenance for coal fired plants account for the greatest percentage of lost availability. A good planning is required to achieving shortest down time for scheduled maintenance actions. By using scheduled maintenance programs that have been determined availability assessment will be carried out to ensure that PLTU Paiton 78 can reach the target of availability. The assessment is performed through simulation method that modeled by an availability block diagram ABD. ABD will be built based on the plant process diagram reliability and maintainability data of PLTU Paiton 78. Result of simulation will also produce data of critical component in the existing unit of PLTU Paiton 78 system that have contribution to an equivalent forced outage rate EFOR. Maintenance strategic then can be established to minimize plant down time. A Comparison between assesment result and the historycal data from the existing plant can be used to analyze maintenance efectiveness that have been performed.



KeywordsAvailabilitas ; Pemeliharaan ; Assesmen
 
Subject:  Sistem Tenaga Listrik
Contributor
  1. Drs.Haryona,MSIE
Date Create: 18/12/2008
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Master-3100097008816
Collection ID: 3100097008816
Call Number: ind RSE 621.319 Ich s


Source
Master Theses, Program Magister Manajemen Teknologi, ind RSE 621.319 Ich s, 2007

Coverage
ITS Community

Rights
Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Master-3100097008816-3059.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 35.172.100.232
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2019 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan