EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Industri-S2 MMT
Posted by fandikaaqsa@its.ac.id at 17/05/2016 14:13:08  •  1282 Views


PEMERATAAN BEBAN KERJA INSPEKSI PERALATAN DENGAN METODE WORK LOAD ANALYSIS

WORK LOAD LEVELLING OF EQUIPMENT INSPECTION BY WORK LOAD ANALYSIS METHOD

Author :
JURINDAR, MUHAMMAD DHENY MUIN ( 9111201810 )




ABSTRAK

Untuk menjamin proses produksi di industri migas berjalan secara berkesinambungan maka diperlukan peralatan yang handal agar tidak terjadi kerusakan peralatan secara tiba-tiba. Salah satu yang dilakukan untuk meminimalisasi terjadinya kerusakan pada peralatan adalah dengan membuat sistem inspeksi yang terencana. Total EP Indonesie telah membuat sistem database untuk membantu dalam penanganan pekerjaan inspeksi akan tetapi dalam pelaksanaannya setiap tahunnya banyak sekali pekerjaan inspeksi yang tidak bisa dilakukan sesuai dengan perencanaan awal hal ini tentunya mengurangi keandalan dari sistem yang ada yang pada akhirnya akan membahayakan sistem keamanan dan proses produksi yang sedang berjalan. Penambahan tim sudah dilakukan oleh manajemen perusahaan namun sampai saat ini masih banyak pekerjaan inspeksi yang tidak bisa diselesaikan sesuai perencanaan awal sehingga mengakibatkan terjadinya penumpukan pekerjaan yang semakin bertambah dari hari ke hari. Berdasarkan permasalahan di atas maka perlu dilakukan penelitian lebih lanjut untuk mengetahui apakah alokasi tenaga kerja yang dilakukan manajemen perusahaan saat ini sudah optimum atau belum yaitu dengan cara pemerataan beban kerja menggunakan metode analisa beban kerja work load analysis. Dari hasil penelitian akan dapat diketahui alokasi penempatan karyawan yang optimum sehingga di akhir penelitian bisa ditentukan rekomendasi untuk perencanaan pekerjaan inspeksi peralatan berikutnya.


ABSTRACT

In order to to ensure the production process in oil and gas industry runs continuously it requires reliable equipments to prevent unplanned equipment breakdown. As a solution to minimize the damage to the equipment is to create a well-planned system of inspection. Total EP Indonesie has established a good system to manage the inspection activities however during implementation the outstanding inspections job is always increasing from year to year. This condition will bring the existing equipments into downgraded situation and consequently will jeopardize the security of the ongoing production process. Additional teams has been mobilized to solve this issue however the same problems is still appear. Based on the above problems it is necessary to conduct further research to determine whether the allocation of manpower has been optimized or not through work leveling process by using work load analysis method. The objective of this research is to obtain the manpower optimization through work allocation in inspection activities as a reference to determine the future inspection work planning



KeywordsInspeksi; Tenaga kerja; Analisa beban kerja
 
Subject:  Efisiensi produksi; Manajemen perindustrian
Contributor
  1. Prof. Dr. Ir. Budi Santosa, MSc
Date Create: 17/05/2016
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-Master-91003150001602
Collection ID: 91003150001602
Call Number: RTMT 658.542 Jur p


Source
Master Theses of Magister Management Technology, RTMT 658.542 Jur p, 2014

Coverage
ITS Community

Rights
Copyright @2016 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Master-41546-9111201810-abstract_id.pdf - 179 KB
  2.  ITS-Master-41546-9111201810-abstract_en.pdf - 177 KB
  3.  ITS-Master-41546-9111201810-conclusion.pdf - 251 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.162.250.227
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan