EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » MMT - Pasca Sarjana ITS
Posted by tondoindra@gmail.com at 18/03/2016 15:41:11  •  635 Views


ANALISA RISIKO UNTUK MENENTUKAN BIAYA KONTINJENSI PADA PELAKSANAAN KONSTRUKSI PROYEK JALAN TOL SURABAYA-MOJOKERTO SEKSI IB

RISK ANALYSIS TO DETERMINE THE CONTINGENCY COST ON THE CONSTRUCTION PROJECT OF SURABAYA-MOJOKERTO TOLL ROAD SECTION IB

Author :
WARDHANA, WIRA ( 9110202405 )




ABSTRAK

Risiko adalah suatu kejadian atau kondisi yang tidak pasti dimana apabila terjadi akan memberikan dampak setidaknya pada satu tujuan proyek termasuk dapat memberikan dampak kerugian pada proyek. Pada proyek konstruksi khususnya pada tahap pelaksanaan sangat berpotensi tinggi terjadinya risiko karena merupakan tahap yang paling banyak menyita tenaga biaya dan waktu serta melibatkan berbagai pihak dengan sumber daya. Kondisi ini rentan berpotensi terjadinya risiko yang pada akhirnya dapat menyebabkan kegagalan proyek. Sehingga upaya penanganan risiko pelaksanaan konstruksi dilakukan dengan suatu manajemen risiko dengan merepresentasikan besarnya dampak resiko dalam satuan biaya dan memasukkannya dalam komponen biaya yang biasa disebut sebagai biaya kontinjensi. Estimasi Biaya Kontinjensi yang terlalu besar akan menyebabkan pembengkakan biaya proyek dan estimasi yang terlalu kecil akan menyebabkan kerugian proyek. Seperti halnya pada salah satu proyek konstruksi yaitu proyek pelaksanaan konstruksi Tol Surabaya-MojokertoSumo seksi IB. Sebuah proyek yang dilakukan PT. Marga Nujyasumo Agung sebagai pemegang hak penyelenggaraan jalan tol Sumo dan PT. Wijaya Karya sebagai pelaksana. Besaran kontinjensi yang ditentukan estimator pelaksana adalah sekitar 2 dari total biaya proyek. Sementara pada beberapa penelitian kisaran biaya kontinjensi adalah sebesar 5-25. Berdasarkan hal tersebut penelitian ini akan meneliti mengenai besaran biaya kontinjensi dan identifikasi risiko-risiko pelaksanaan konstruksi pada proyek Tol Sumo Seksi IB. Penelitian dilakukan dengan membentuk suatu tim manajemen risiko yang terdiri dari pihak-pihak yang terlibat langsung dalam proyek Tol Sumo Seksi IB. Metode penelitian yang dilakukan diantaranya melakukan identifikasi risiko dengan menggunakan teknik Delphi untuk memperoleh variabel risiko yang relevan kemudian untuk memperoleh variabel risiko yang berpengaruh signifikan terhadap biaya proyek dilakukan analisa kualitatif berdasar risiko-risiko yang sudah teridentifikasi dengan QRA Sheet dan mengkategorikan tingkatan signifikannya menggunakan PC Matrix. Dan untuk memperoleh besaran biaya kontinjensi analisa kuantitatif menggunakan Expected Monetary Value dengan melibatkan tim manajemen risiko untuk menentukan persentase probabilitas risiko secara expert judgement. Hasil akhir penelitian diperoleh besaran biaya kontinjensi sebesar 5 dari total biaya proyek


ABSTRACT

Risk is an event or condition that uncertain which if it occur will make an impact at least one of project goal. including giving loss to the project. On the construction project especially on the construction stage there are high potensial risks because the stage is the most consuming energy cost and time and involves various party with a some resources. that condition potentially vulnerable to risks that can ultimately lead to failure project. So the efforts of risks handling are going to do with risk management. By representation of amount to risk impact on the unit costs and submit it on the cost component that commonly said as contingency cost. Large Estimation of contingency cost will cause swelling of the project budget and small estimation will cause the loss of the project. Such as in one of construction project Construction Project of Surabaya-Mojokerto Sumo Section IB. A project that undertaken by PT. Marga Nujyasumo Agung as a right holder of Toll Sumo operation and PT. Wijaya Karya as a main contractor. The Amount of contingency cost determined by estimator approximately 2 of the total project cost. While in some studies the range of contingency fee is 5 -25. Accordingly this study will examine the amount of the contingency cost and the identification of risks in the construction of the project Sumo Toll Section IB. Research carried out by forming a risk management team consisting of the parties directly involved in the Toll project Sumo Section IB. Research methodology including perform risk identification using the Delphi technique to obtain the relevant risk variable then to obtain the risk variables that significantly influence the cost of the project performed a qualitative analysis based on the risks that have been identified by the QRA Sheet and categorize the level of significance using PC Matrix. And to obtain a contingent fee scale quantitative analysis using Expected Monetary Value involving risk management team to determine the percentage of probability of risk expert judgment. The final results obtained by the amount of the contingency fee of 5 of the total cost of the project.



KeywordsRisiko, Pelaksanaan Konstruksi, Kontinjensi
 
Subject:  Manajemen Resiko
Contributor
  1. I PUTU ARTAMA WIGUNA, Ir., MT., PhD.
Date Create: 18/03/2016
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-Master-91103150001445
Collection ID: 91103150001445
Call Number: RTMT 658.155 War a


Source
Master Theses Of Magister Management Technology RTMT 658.155 War a, 2016

Coverage
ITS Community

Rights
Copyright @2016 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Master-40895-9110202405-abstract_id.pdf - 182 KB
  2.  ITS-Master-40895-9110202405-abstract_en.pdf - 181 KB
  3.  ITS-Master-40895-9110202405-conclusion.pdf - 178 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.161.3.96
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan