EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Proyek-S2 MMT
Posted by tondoindra@gmail.com at 10/05/2016 09:46:24  •  643 Views


UJI PENGARUH INPUT COMPETENCY PROJECT LEADER TERHADAP PROJECT DELAY DI PT. XYZ

INFLUENCE OF PROJECT LEADERS INPUT COMPETENCY TO PROJECT DELAYS IN PT.XYZ

Author :
WIDIARTI, NENI TRI  ( 9113202306 )




ABSTRAK

Manajemen proyek adalah aplikasi dari pengetahuan knowledge keahlian skill tool dan teknik yang diaplikasikan pada aktivitas proyek untuk mencapai tujuan dan persyaratan proyek. Keterlambatan penyelesaian satu proyek akan merubah seluruh penjadwalan proyek di PT. XYZ . Hal ini dikarenakan lokasi kerja berada di Offshore tingkat bahaya dalam suatu fasilitas dan keterbatasan akomodasi transportasi dan peralatan emergency di lokasi kerja. Penelitian ini bertujuan untuk mengetahui ada tidaknya pengaruh input competency terhadap keterlambatan pelaksanaan proyek di PT. XYZ dan menilai tingkat kinerja dan tingkat kepentingan input competency Project Leader terhadap tool technique yang digunakan selama pelaksanaan proyek. Metode yang digunakan adalah regresi logistik untuk mengidentifikasikan input competency yang memiliki pengaruh terhadap keterlambatan proyek. Indikator yang didapatkan dari regresi logistik akan dianalisa dengan kajian teori yang ada dan akan dilakukan survey terhadap pihak operation dan bagian pengendalian proyek di PT. XYZ dengan menggunakan Importance Performance Analysis. Hasil analisis digunakan untuk menentukan langkah perbaikan pelaksanaan proyek di PT. XYZ. Indikator corrective action dan resource management plan terbukti tidak mempengaruhi keterlambatan proyek project delays. Hal ini dibuktikan melalui regresi logistik bahwa proyek yang sedang berjalan tetap akan mengalami keterlambatan tanpa ada peningkatan input competency dari Project Leader.


ABSTRACT

Project management is the application of knowledge skill tools and techniques are applied to the project activity to achieve the objectives and requirements of the project. Delay in completion of the project will change the whole scheduling project in PT . XYZ. This is because the work site is located at Offshore the level of danger in a facility and limited accommodation transportation and emergency equipment at the job site . This study aimed to determine whether there is the effect of input competency to delays in project implementation in PT . XYZ and assess the level of performance and level of importace Project Leaders input competence by the tool and technique used during project implementation. The method used is logistic regression to identify competency inputs that have an influence on project delays . Indicators obtained from logistic regression will be analyzed by the study of the existing theories and will be a survey of the operation and project control section in PT . XYZ by using Importance Performance Analysis . The results of the analysis are used to determine the steps to improve the implementation of the project in the PT . XYZ Indicators corrective action and resource management plan does not proved affect project delays . Through logistic regression proved projects will delay without increment input competency of the Project Leader.



KeywordsInput Competency; Project Delay; Project Leader; Project Management
 
Subject:  Manajemen Proyek
Contributor
  1. INDUNG SUDARSO
Date Create: 29/12/2014
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-Master-91103150001618
Collection ID: 91103150001618
Call Number: RTMT 658.404 Wid u


Source
Master Theses Of Magister Management Technology RTMT 658.404 Wid u, 2016

Coverage
ITS Community

Rights
Copyright @2014 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Master-41463-9113202306-Abstract_id.pdf - 179 KB
  2.  ITS-Master-41463-9113202306-Abstract_en.pdf - 179 KB
  3.  ITS-Master-41463-9113202306-Conclusion.pdf - 163 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.80.26.116
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan