EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Proyek-S2 MMT
Posted by anisw@its.ac.id at 11/05/2016 13:22:42  •  658 Views


FAKTOR FAKTOR YANG BERKONTRIBUSI TERHADAP KETERLAMBATAN PROYEK KONSTRUKSI DI PT.NEWMONT NUSA TENGGARA

ANALYSIS OF CONTRIBUTING FACTORS TO CONSTRUCTION PROJECT DELAYS AT PT.NEWMONT NUSA TENGGARA

Author :
ADI, NUGROHO  ( 9111202806 )




ABSTRAK

Keterlambatan di dalam proyek adalah situasi di mana proyek tidak dapat diselesaikan dalam waktu yang direncanakan. Keterlambatan proyek konstruksi dan pemeliharaan merupakan salah satu masalah besar di PT. Newmont Nusa Tenggara PTNNT. Lebih dari 67 proyek konstruksi yang dikerjakan oleh kontraktor di PTNNT mengalami keterlambatan. Tujuan dari penelitian ini adalah mengidentifikasi dan menganalisis faktor-faktor utama yang berkontribusi terhadap keterlambatan proyek konstruksi di PTNNT dari persepsi klien dan kontraktor serta memberikan saran untuk mengatasinya. Metode yang dipakai dalam penelitian ini adalah pendekatan kuantitatif yang dilakukan dalam empat tahapan yaitu studi literatur pengumpulan data melalui survey analisis data dan kesimpulan. Kuesioner survey di desain berdasarkan faktor-faktor yang teridentifikasi dari penelitian-penelitian sebelumnya dengan menetapkan sebanyak 6 aspek kajian dengan 45 jenis penyebab atau faktor yang berkontribusi terhadap keterlambatan proyek. Analisis data dilakukan secara kuantitatif terhadap variabel faktor keterlambatan dari hasil kuesioner. Data tersebut diolah dengan menghitung Frequency Index dan Relative Importance Index dan selanjutnya dilakukan analisis dengan menggunakan Uji-t paired samples dan pemetaan ke dalam diagram Kartesius untuk menentukan faktor-faktor utama yang berkontribusi terhadap keterlambatan proyek. Hasil dari survey dan analisis data dari penelitian ini menyimpulkan bahwa aspek perencanaan dan penjadwalan adalah aspek yang paling berpengaruh terhadap keterlambatan proyek konstruksi dan enam faktor utama yang paling berkontribusi terhadap keterlambatan proyek konstruksi di PTNNT adalah adanya banyak pekerjaan tambahan kelambatan penyediaan alat dan bahan oleh pemilik rencana kerja pemilik yang sering berubah-ubah mobilisasi sumber daya yang lambat kualifikasi teknis dan manajerial yang tidak memadahi dari kontraktor dan penetapan jadwal proyek yang amat ketat oleh pemilik


ABSTRACT

Delay in a project is a condition when a project could not be accomplished within the targeted time as planned. Construction project delay is one of critical issues in PT. Newmont Nusa Tenggara PTNNT. Over than 67 of construction project performed by contractors at PTNNT were delayed. The objective of this study is to identify analyze and determine the main contributing factors to construction projects delays at PTNNT from client and contractors perspective and provide some advices to minimize the construction project delays issue. The methodology used in this study is a quantitative approach conducted in four stages which are study literature data collecting through a survey questionnaire data analysis and conclusion. Survey questionnaire is designed based on delay factors that were identified from previous studies by setting six aspects of the study with forty five types of causes factors contribute to the projects delay. The data analysis is conducted quantitatively to the questionnaire response score by calculating the Frequency Index and Relative Importance Index number and using paired samples t-Test and mapping through Cartesius Diagram to determine the main contributing factors to contruction project delays. The result of the survey and data analysis of this study indicate that planning and scheduling is the most contributed aspects to the construction project delays and six main factors most contributed to construction project delays in PTNNT are frequent additional works delay of equipment and material delivery provided by owner changes of work plan by owner late resources mobilization inadequate technical and managerial qualification of the contractors and tight project schedule set by project owner.



KeywordsFAKTOR; KETERLAMBATAN; PT. NEWMONT NUSA TENGGARA; PROYEK KONSTRUKSI
 
Subject:  NONE
Contributor
  1. Prof. Dr. Ir. NADJADJI ANWAR, MSc
  2. Ir. ADITYA SUTANTYO
Date Create: 16/01/2015
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Master-91103160001639
Collection ID: 91103160001639
Call Number: RTMT 658.404 Adi f


Source
Master Theses of Magister Management Techonology, RTMT 658.404 Adi f, 2014

Coverage
ITS Community

Rights
Copyright @2015 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Master-41477-9111202806-Abstract_id.pdf - 239 KB
  2.  ITS-Master-41477-9111202806-Abstract_en.pdf - 179 KB
  3.  ITS-Master-41477-9111202806-Conclusion.pdf - 176 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.225.16.10
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan