EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Master Theses » Manajemen Proyek-S2 MMT
Posted by anisw@its.ac.id at 19/05/2016 11:55:12  •  1039 Views


PERANCANGAN STRATEGI MITIGASI RESIKO SUPPLY CHAIN DI PT ATLAS COPCO NUSANTARA DENGAN METODA HOUSE OF RISK

DESIGNING SUPPLY CHAIN RISK MITIGATION STRATEGY AT PT ATLAS COPCO NUSANTARA USING HOUSE OF RISK METHOD

Author :
UTARI, RETNO  ( 9111202805 )




ABSTRAK

Penanganan resiko dalam supply chain adalah hal yang paling penting untuk menjaga keberlangsungan aktivitas supply chain dan aktifitas perusahaan pada umumnya. Banyaknya resiko yang potensial terjadi dalam aktivitas supply chain memerlukan penanganan yang lebih efektif dan efisien Resiko diidentifikasi dari bisnis proses berdasarkan Supply Chain Operation Reference SCOR. Resiko yang teridentifikasi ini kemudian dilakukan analisis dengan menggunakan House of Risk HOR dengan tujuan untuk mengidentifikasi resiko-resiko yang potensial untuk kemudian di identifikasi tindakan pencegahan resikonya. Penelitian ini bertujuan untuk dapat mengidentifikasi resiko potensial yang terjadi penyebab resiko yang menyebabkan resiko potensial tersebut terjadi serta memperoleh korelasi antara penyebab resiko dan kejadian resiko dalam perusahaan. Dari hasil yang diperoleh akan diidentifikasi tindakan pencegahan yang perlu dilakukan untuk meminimalisir penyebab resiko yang terjadi yang pada akhirnya merupakan strategi mitigasi yang dilakukan oleh perusahaan tersebut. Dari hasil analisis didapatkan 6 enam penyebab resiko yang potensial yaitu peningkatan permintaan yang signifikan kekurangan dalam kapasitas supply Purchase Requesition PR mendesak dari user ketergantungan pada satu supplier masalah custom clearance dan kedatangan kapal yang tidak tepat waktu. Berdasarkan penyebab tersebut diatas didapatkan 7 tujuh tindakan pencegahan yang signifikan diantaranya yaitu membangun distribution center yang menyetok barang-barang kritical strategis Standard Operating Procedure SOP dijalankan secara lebih baik dengan memberikan Reward and Punishment yang sesuai peramalan permintaan dan perencanaan inventory dilakukan secara bersama-sama kolaboratif integrasi antar fungsi-fungsi dalam perusahaan ditingkatkan pemenuhan stock yang dilakukan secara silang cross fulfillment dari warehouse lain pemberdayaan karyawan agar dapat mengerjakan pekerjaan multitasking pemenuhan barang di warehouse dilakukan secara dinamis mengikuti kondisi barang fast moving slow moving dan obsolete


ABSTRACT

Handling risks in the supply chain is the most important thing to maintain continuity of supply chain activities and the activities of the company in general. The number of potential risks that occur in the supply chain activities requiring more effective and efficient treatment. Risks are identified from the business processes based on SCOR. Identified risk analysis is then analyzed using the HOR method in order to identify high risks that occurs and later identifies the risk prevention measures. This study is intended to identify the potential risk events risk agents that cause the potential risk events and also to obtain the correlation between the potential risk events and risk agents that occurs in the company. The results will then be used with the preventive measures to minimize the risk agents where the strategy mitigation will be carried out by the company. From the analysis there are 6 six potential risk agents and they are significant increase in demand shortages in supply capacity Purchase Requesition PR urged from the user the dependence on a single supplier custom clearance problems and the non-timely arrival ships. Based on the above causes there were 7 seven significant preventive measures acquired among which to build a distribution center to stock critical strategic goods implementing a better Standard Operating Procedure SOP by providing appropriate Reward and Punishment demand forecasting and inventory planning done jointly collaborative the integration between the functions within the company improved cross-stock fulfillment conducted cross-fulfillment from another warehouse empowering employees to be able to do multitasking work the fulfillment of goods in the warehouse is done dynamically follow the condition of the items fast moving slow-moving and obsolete.



Keywordspenyebab resiko; kejadian resiko; strategi mitigasi resiko; resiko supply chain; HOR
 
Subject:  NONE
Contributor
  1. Dr. Imam Baihaqi, ST, M.Sc.
Date Create: 02/02/2015
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Master-91103160001645
Collection ID: 91103160001645
Call Number: RTMT 658.401 2 Uta p


Source
Master Theses of Magister Management Techonology, RTMT 658.401 2 Uta p, 2015

Coverage
ITS Community

Rights
Copyright @2015 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Master-41565-9111202805-Abstract_id.pdf - 191 KB
  2.  ITS-Master-41565-9111202805-Abstract_en.pdf - 192 KB
  3.  ITS-Master-41565-9111202805-Conclusion.pdf - 182 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.198.54.142
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan