EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Non Degree » Kimpraswil Kons.Bang. Gedung D3
Posted by aseri at 19/01/2010 11:02:35  •  5056 Views


PERBANDINGAN ANTARA METODE PELAKSANAAN PLAT PLAT KONVENSIONAL DENGAN PLAT PRECAST TERHADAP WAKTU DAN BIAYA PADA GEDUNG SD MUHAMMADIYAH 26 SURABAYA

COMPARATION BETWEEN EXECUTION METHOD CONVENSIONAL PLATE WITH PRECAST PLATE TO TIME AND COST AT BUILDING SD MUHAMMADIYAH 26 SURABAYA

Author :
Suwito, Hadi 




ABSTRAK

Penyusunan proyek akhir ini mengambil obyek Gedung SD Muhammadiyah 26 Surabaya terletak di Jln. Ahmad Dahlan No.2 Keputih Sukolilo Surabaya. Pada Proyek pembangunan gedung SD Muhammadiyah 26 Surabaya ini muncul suatu ide pemikiran untuk melakukan perubahan sistem konstruksi yang sudah ada yaitu dengan mengganti penggunaan plat konvensional cor setempat dengan plat precast pracetak. Dari perhitungan yang dilakukan diwujudkan dalam bentuk laporan perhitungan rencana anggaran biaya daftar harga satuan pekerja Kota Surabaya pembuatan jaringan kerja network planningdan pembuatan rencana kerja time schedule sehingga akan didapat kurva S yang dapat dijadikan acuan dalam pelaksanaan pembangunan.Percepatan waktu dengan mengubah plat konvensional menjadi plat precast menyebabkan waktu pelaksanaan menjadi 182 hari dari waktu normalnya 196 hari. Namun terjadi selisih penambahan biaya sebesar Rp 219.563.00000 dari biaya normalnya Rp. 1.590.805.00000 menjadi Rp. 1.810.563.00000. Penggunaan plat precast ini dikarenakan pemakaian memiliki keuntungan yaitu waktu pelaksanaanya relatif lebih cepat metode pelaksanaan yang lebih sederhana dan kualitas mutu lebih terjamin.


ABSTRACT

Compilation of this final project take Building obyek of SD Muhammadiyah 26 Surabaya located in Jln. Ahmad Dahlan No.2 Keputih Sukolilo Surabaya. Building Construction project of SD Muhammadiyah 26 of Surabaya this emerge idea to make a change construction system which have there that is by changing usage of conventional plate with plate of precast. From calculation which is to be realized in the form of report calculation of cost estimate is expense of price list set of worker of Town of Surabaya making of network planningdan plan schedule time so that will be got curve of S able to be made by reference in execution of development. Acceleration of time by altering conventional plate become plate of precast cause execution time become 182 day of normal time of it 196 day. But happened difference addition ofexpense equal to Rp 219.563.00000 from normal expense of it Rp. 1.590.805.00000 becoming Rp. 1.810.563.00000. Usage of plate of precast this because of usage have advantage that is its time of quicker relative more simple execution method and quality more well guaranted.



KeywordsPlat precast ; rencana kerja
 
Subject:  Obyek gedung
Contributor
  1. Ir. SUKOBAR, MT
Date Create: 19/01/2010
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-NonDegree-3100009036325
Collection ID: 3100009036325
Call Number: RSS 692.5 Suw p


Source
Non Degree, Civil Engineering, RSS 692.5 Suw p, 2009

Coverage
ITS Community Only

Rights
Copyright @2009 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-NonDegree-8247-3106030058-kesimpulan.pdf - 47 KB




 Similar Document...

     No similar subject found !


! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.225.57.120
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan