EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Dewi Eka Agustina


Ansi Aflacha Putri


Tondo Indra Nyata


Aprillia Tri Wulansari


Moh. Fandika Aqsa




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Non Degree » TEKNIK SIPIL - D3
Posted by dee@its.ac.id at 28/12/2011 14:41:16  •  3441 Views


METODE PELAKSANAAN PEKERJAAN JEMBATAN DAN UNDERPASS SUNGAI WARUTURI STA 34+386.399 JALAN TOL RUAS KERTOSONO-MOJOKERTO

THE WORKING IMPLEMENT METHOD OF BRIDGE AND UNDERPASS ON WARUTURI RIVER STA 34+386.399 KERTOSONO-MOJOKERTO TOLL ROAD

Created by :
CHRISTANTI, ESTERISKA HARI  ( 3108030006 )
SARITA, SESTI



SubjectJembatan
Alt. Subject Bridges--estimates Bridges--design and construction
KeywordMetode pelaksanaan
Launcher girder

Description:

Pada pelaksanaan pekerjaan Jembatan Struktur atas dan Underpass Sungai Waruturi dengan panjang jembatan 34,5 m, lebar arah Mojokerto 16,3 m, lebar arah Kertosono 16,3 m. Dan pekerjaan box tunnel dengan panjang 34,1 m, lebar 5 m, dan tinggi 3,75 m, diperlukan perencanaan metode pelaksanaan yang tepat. Pada pengerjaan proyek akhir ini, kami menghitung ulang waktu dan biaya yang dibutuhkan oleh proyek. Pekerjaan underpass yang membangun box tunnel dengan metode pengecoran di lokasi proyek. Sedangkan pekerjaan jembatan struktur atas, erection girder menggunakan launcher girder. Launcher girder dipilih karena lebih efisien dan sesuai dengan keadaan lokasi proyek. Berdasarkan dari hasil analisa proyek akhir ini, pembangunan struktur atas jembatan dan underpass Sungai Waruturi dapat diselesaikan selama 135 hari atau 6 bulan.


Alt. Description

The working implementation of upper bridge structure underpass on Waruturi river bridge with a length of 34.5 meters,widht 16.3 meters (direction to Mojokerto), and width 16.3 meters (direction to Kertosono). And box tunnel with a length of 34.1 m, wide 5 m and 3.75 m hight, need good planning implementation methods. In doing this research, we recalculate the time and cost required by this project. In accomplishing underpass which is to build box tunnel with foundry method in project area.The work of building a box tunnel underpass by the method of casting on the project site using girder launcher. While work on the upper bridge structure, erection girder using girder launcher. Girder launcher was chosen because it is more efficient and applicable in project area. Based on the final project analysis, the working implementation of upper bridges structure and underpass on Waruturi river can be finished for 135 days or 6 months and spend cost of Rp. 5.418.516.858,76.

Contributor:
  1. Ir. Chomaedhi,CES.Geo
Date Create:20/07/2011
Type:Text
Format:pdf
Language:Indonesian
Identifier:ITS-NonDegree-3100011044317
Collection ID:3100011044317
Call Number:RSS 624.2 Chr m


Source :
Non Degree of Civil Engineering, RSS 624.2 Chr m, 2011

Coverage :
ITS Community

Rights :
Copyright @2011 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/metode-pelaksanaan-pekerjaan-jembatan-dan-underpass-sungai-waruturi-sta-34386399-jalan-tol-ruas-kertosonomojokerto-16930.html




[ Free Download - Free for All ]

  1.  ITS-NonDegree-16930-metode-pelaksanaan-pekerjaan-jembatan-dan-underpass-sungai-waruturi-sta-34-386399-jalan-tol-ruas-ker.pdf - 209 KB
  2.  ITS-NonDegree-16930-the-working-implement-method-of-bridge-and-underpass-on-waruturi-river-sta-34-386399-kertosono-mojok.pdf - 210 KB
  3.  ITS-NonDegree-16930-Approval_Sheet.pdf - 641 KB
  4.  ITS-NonDegree-16930-Abstract_id.pdf - 206 KB
  5.  ITS-NonDegree-16930-Abstract_en.pdf - 209 KB
  6.  ITS-NonDegree-16930-Preface.pdf - 193 KB
  7.  ITS-NonDegree-16930-Table_of_Content.pdf - 226 KB
  8.  ITS-NonDegree-16930-Tables.pdf - 199 KB
  9.  ITS-NonDegree-16930-Bibliography.pdf - 363 KB
  10.  ITS-NonDegree-16930-Biography.pdf - 225 KB
  11.  ITS-NonDegree-16930-Biography.pdf - 470 KB
  12.  ITS-NonDegree-16930-Chapter1-1260296.pdf - 1231 KB
  13.  ITS-NonDegree-16930-Conclusion-201439.pdf - 197 KB
  14.  ITS-NonDegree-16930-Presentation-423660.pdf - 414 KB
  15.  ITS-NonDegree-16930-Presentation-732952.pdf - 716 KB
  16.  ITS-NonDegree-16930-Presentation-1880976.pdf - 1837 KB
  17.  ITS-NonDegree-16930-Presentation-703296.pdf - 687 KB

[ FullText Content - Please, register first ]

  1. ITS-NonDegree-16930-Chapter2-400132.pdf - 391 KB
  2. ITS-NonDegree-16930-Chapter3-1983449.pdf - 1937 KB
  3. ITS-NonDegree-16930-Chapter4-952091.pdf - 930 KB
  4. ITS-NonDegree-16930-Chapter5-1002321.pdf - 979 KB
  5. ITS-NonDegree-16930-Chapter6-486494.pdf - 475 KB
  6. ITS-NonDegree-16930-Chapter7-245410.pdf - 240 KB
  7. ITS-NonDegree-16930-Enclosure-1132282.pdf - 1106 KB
  8. ITS-NonDegree-16930-Enclosure-1143632.pdf - 1117 KB



Give your Comment here...


 10 Similar Document...



 10 Related Document...






HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

Launcher , Launcher girder , Metode , Metode pelaksanaan , girder , pelaksanaan



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




49348847


Visitors Today : 1
Total Visitor : 2515711

Hits Today : 34181
Total Hits : 49348846

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 10.199.13.5
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2014 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan