EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Non Degree » TEKNIK SIPIL - D3
Posted by dee@its.ac.id at 28/12/2011 14:41:16  •  4609 Views


METODE PELAKSANAAN PEKERJAAN JEMBATAN DAN UNDERPASS SUNGAI WARUTURI STA 34386.399 JALAN TOL RUAS KERTOSONO-MOJOKERTO

THE WORKING IMPLEMENT METHOD OF BRIDGE AND UNDERPASS ON WARUTURI RIVER STA 34386.399 KERTOSONO-MOJOKERTO TOLL ROAD

Author :
CHRISTANTI, ESTERISKA HARI  ( 3108030006 )
SARITA, SESTI




ABSTRAK

Pada pelaksanaan pekerjaan Jembatan Struktur atas dan Underpass Sungai Waruturi dengan panjang jembatan 345 m lebar arah Mojokerto 163 m lebar arah Kertosono 163 m. Dan pekerjaan box tunnel dengan panjang 341 m lebar 5 m dan tinggi 375 m diperlukan perencanaan metode pelaksanaan yang tepat. Pada pengerjaan proyek akhir ini kami menghitung ulang waktu dan biaya yang dibutuhkan oleh proyek. Pekerjaan underpass yang membangun box tunnel dengan metode pengecoran di lokasi proyek. Sedangkan pekerjaan jembatan struktur atas erection girder menggunakan launcher girder. Launcher girder dipilih karena lebih efisien dan sesuai dengan keadaan lokasi proyek. Berdasarkan dari hasil analisa proyek akhir ini pembangunan struktur atas jembatan dan underpass Sungai Waruturi dapat diselesaikan selama 135 hari atau 6 bulan.


ABSTRACT

The working implementation of upper bridge structure underpass on Waruturi river bridge with a length of 34.5 meterswidht 16.3 meters direction to Mojokerto and width 16.3 meters direction to Kertosono. And box tunnel with a length of 34.1 m wide 5 m and 3.75 m hight need good planning implementation methods. In doing this research we recalculate the time and cost required by this project. In accomplishing underpass which is to build box tunnel with foundry method in project area.The work of building a box tunnel underpass by the method of casting on the project site using girder launcher. While work on the upper bridge structure erection girder using girder launcher. Girder launcher was chosen because it is more efficient and applicable in project area. Based on the final project analysis the working implementation of upper bridges structure and underpass on Waruturi river can be finished for 135 days or 6 months and spend cost of Rp. 5.418.516.85876.



KeywordsMetode pelaksanaan; Launcher girder
 
Subject:  Jembatan
Contributor
  1. Ir. Chomaedhi,CES.Geo
Date Create: 20/07/2011
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-NonDegree-3100011044317
Collection ID: 3100011044317
Call Number: RSS 624.2 Chr m


Source
Non Degree of Civil Engineering, RSS 624.2 Chr m, 2011

Coverage
ITS Community

Rights
Copyright @2011 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-NonDegree-16930-Abstract_id.pdf - 206 KB
  2.  ITS-NonDegree-16930-Abstract_en.pdf - 209 KB
  3.  ITS-NonDegree-16930-Conclusion-201439.pdf - 197 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.162.100.129
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2016 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan