 |
UPT. PERPUSTAKAAN Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
|
Phone |
: |
031-5921733 , 5923623 |
|
Fax |
: |
031-5937774 |
|
E-mail |
: |
libits@its.ac.id |
|
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
|
timit_perpus@its.ac.id |
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT 08.30 s/d 15.30 WIB
 Taufik
 Dewi
 Ansi
 Tondo
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to 3 x 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?

    
Pengunjung hari ini : 404
Total pengunjung : 6537
Hits hari ini : 20437
Total Hits : 86330
Pengunjung Online: 33
• You are connected from 38.107.179.212 |
Detail Collection
ITS » Non Degree » T.Sipil Konsentrasi Bang.Gedung D3 Posted by dee@its.ac.id at 29/12/2011 13:06:19 • 93 Views
PENGARUH PERCEPATAN WAKTU TERHADAP BIAYA PROYEK RUMAH SAKIT PURA RAHARJA SURABAYA
THE EFFECT OF ACCELERATION TIME ON COSTS PROJECT PURA RAHARJA HOSPITAL SURABAYA
Created by :
LEANITA, SESA KARNESA ( 3108030143 ) FAYUMI, RHEZY ASTRID
| Subject: | Manajemen proyek | | Alt. Subject : | Project management | | Keyword: | Percepatan waktu Biaya Rumah sakit |
[ Description ]
Pada pelaksanaan proyek Rumah Sakit Pura Raharja Surabaya dilakukan percepatan waktu untuk mendapatkan biaya ekonomis dengan waktu penyelesaian yang singkat. Akan dilakukan dua alternatif, yang pertama penambahan jam kerja dan yang kedua penambahan tenaga kerja. Adapun caranya dengan memampatkan waktu pada setiap pekerjaan di lintasan kritis. Pekerjaan pada lintasan kritis merupakan pekerjaan yang berkaitan waktu penyelesaiannya satu sama lain. Pemampatan dilakukan pada semua durasi aktivitas yang perlu dibulatkan. Hal ini dilakukan terus menerus sampai kondisi lintasan kritis jenuh atau tidak mungkin lagi dilakukan pemampatan waktu penyelesaian. Dari pembahasan didapatkan hasil, alternatif 1 dengan metode penambahan jam kerja (lembur) pada struktur bangunan, didapatkan hasil waktu pelaksanaan berkurang 8 hari dari waktu normal yakni 136 hari menjadi 128 hari setelah pembulatan. Ini berakibat biaya tidak langsung berkurang dari Rp.192.240.390,00 menjadi Rp. 180.225.366,00. Sedangkan biaya langsung bertambah daris Rp. 1.230.226.000,00 menjadi Rp. 1.243.853.802,00, sehingga biaya total berubah dari Rp.1.422.466.000,00 menjadi Rp. 1.424.785.934,00. Alternatif 2 dengan metode penambahan jumlah tenaga kerja pada struktur bangunan, didapatkan hasil waktu pelaksanaan berkurang 8 hari dari waktu normal yakni 136 hari menjadi 128 hari setelah pembulatan. Ini berakibat biaya tidak langsung berkurang dari Rp.192.240.390,00 menjadi Rp. 180.225.366,00. Sedangkan biaya langsung bertambah dari Rp. 1.230.226.000,00 menjadi Rp. 1.233.205.147,00, sehingga biaya total berubah dari Rp.1.422.466.000,00 menjadi Rp. 1.414.137.278,00. Dari kedua alternatif dapat disimpulkan bahwa alternatif 2 lebih menguntungkan secara ekonomis.
Alt. Description
In execution of Pura Raharja Hospital project take effect acceleration time to get economic cost with a short time settlement. There will be two alternatives, the first with addition of working hours and the second with an addition of labour. As for how with compression time in every work on critical path. Work on critical path has a related settlement of work time to another one. Compression performed on all duration of the activity that needs to be rounded. This is done continously until the condition of saturated critical path or not possible to compress settlement time. From the discussion of the results obtained, alternative 1 with the addition method of working hours (overtime) in the structure of the building, showed reduced execution time of 8 days from the time of the normal 136 days to 128 days after compression. This may lead to indirect costs was reduced from Rp.192.240.390,00 Rp. 180.225.366,00. While the direct costs increased from Rp. 1.230.226.000,00 to Rp. 1.243.853.802,00, so the total cost of changing from Rp.1.422.466.000,00 to Rp.1.424.785.934,00. Alternative 2 with the addition method the amount of labor on the building structure, showed reduced implementation time 7 days from the time of the normal 140 days to 133 days after compression. This may lead to indirect costs was reduced from Rp.192.240.390,00 to Rp. 180.225.366,00. While the direct costs increased from Rp. 1.230.226.000,00 to Rp. 1.233.205.147,00, so the total cost of changing from Rp.1.422.466.000,00 to Rp.1.414.137.278,00. Of the two alternatives, can be concluded that alternative 2 is more advantageous economically.
| Contributor | : |
- Ir. Sukobar, MT
- Ir. Endang Sri S, MT
| | Date Create | : | 26/07/2011 | | Type | : | Text | | Format | : | pdf | | Language | : | Indonesian | | Identifier | : | ITS-NonDegree-3100011044358 | | Collection ID | : | 3100011044358 | | Call Number | : | RSS 658.404 Lea p |
Source : Non Degree of Civil Engineering, RSS 658.404 Lea p, 2011
Coverage : ITS Community
Rights : Copyright @2011 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library
Share this information to :
Google Bookmarks | Technorati | Del.icio.us | Digg
[ Free Download - Free for All ]
- ITS-NonDegree-16989-pengaruh-percepatan-waktu-terhadap-biaya-proyek-rumah-sakit-pura-raharja-surabaya.pdf - 18 KB
 - ITS-NonDegree-16989-the-effect-of-acceleration-time-on-costs-project-pura-raharja-hospital-surabaya.pdf - 16 KB
 - ITS-NonDegree-16989-Approval_Sheet.pdf - 306 KB
 - ITS-NonDegree-16989-Abstract_id.pdf - 718 KB
 - ITS-NonDegree-16989-Abstract_en.pdf - 716 KB
 - ITS-NonDegree-16989-Preface.pdf - 84 KB
 - ITS-NonDegree-16989-Table_of_Content.pdf - 549 KB
 - ITS-NonDegree-16989-Tables.pdf - 186 KB
 - ITS-NonDegree-16989-Illustrations.pdf - 186 KB
 - ITS-NonDegree-16989-Bibliography.pdf - 182 KB
 - ITS-NonDegree-16989-Biography.pdf - 369 KB
 - ITS-NonDegree-16989-Chapter1-1408638.pdf - 1376 KB
 - ITS-NonDegree-16989-Conclusion-711751.pdf - 695 KB
 - ITS-NonDegree-16989-Presentation-800118.pdf - 781 KB
 - ITS-NonDegree-16989-Enclosure_List.pdf - 181 KB

[ FullText Content - Please, register first ]
1. ITS-NonDegree-16989-Chapter2-151168.pdf - 148 KB  2. ITS-NonDegree-16989-Chapter3-110661.pdf - 108 KB  3. ITS-NonDegree-16989-Chapter4-205086.pdf - 200 KB  4. ITS-NonDegree-16989-Chapter5-278301.pdf - 272 KB  5. ITS-NonDegree-16989-Chapter6-213498.pdf - 208 KB  6. ITS-NonDegree-16989-Enclosure-240906.pdf - 235 KB 
[ Link of Contents]
10 Similar Document...
10 Related Document...
|