 |
UPT. PERPUSTAKAAN Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
|
Phone |
: |
031-5921733 , 5923623 |
|
Fax |
: |
031-5937774 |
|
E-mail |
: |
libits@its.ac.id |
|
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
|
timit_perpus@its.ac.id |
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT 08.30 s/d 15.30 WIB
 Taufik
 Dewi
 Ansi
 Tondo
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to 3 x 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?

    
Pengunjung hari ini : 406
Total pengunjung : 6539
Hits hari ini : 20808
Total Hits : 86701
Pengunjung Online: 31
• You are connected from 38.107.179.211 |
Detail Collection
ITS » Non Degree » T.Sipil Konsentrasi Bang.Transp. Posted by dee@its.ac.id at 29/12/2011 10:02:48 • 100 Views
ESTIMASI BIAYA DAN WAKTU PENINGKATAN JALAN PERKERASAN LENTUR SURABAYA - GRESIK STA 0+000 - STA 3+450
THE ESTIMATION OF COST AND TIME ON OVERLAY RIGID ROAD IN SURABAYA-GRESIK STA 0+000 – STA 3+450
Created by :
GUNTUR IMAM SAPUTRO ( 3107030028 )
| Subject: | Jalan raya Jalan aspal | | Alt. Subject : | Pavements--roads Roads--estimates | | Keyword: | Esimasi |
[ Description ]
Di dalam pembangunan suatu proyek, khususnya proyek peningkatan jalan perkerasan lentur Jalan Surabaya Gresik STA 0+000 – STA 0+350 diperlukan, perencanaan strategi pengendalian waktu dan biaya. Proyek Akhir ini membahas tentang Estimasi Biaya dan Waktu yang diperlukan untuk peningkatan suatu jalan dengan perkerasan lentur. Analisa yang dilakukan dalam proyek akhir ini adalah perhitungan volume pada tiap-tiap jenis pekerjaan, pehitungan kapasitas, biaya sewa peralatan, analisa harga satuan, dan kurva S, lintasan kritis dari program Ms. Project. Hasil yang diperoleh dari penelitian ini sebagai berikut : penjadwalan proyek; material yang dibutuhkan; tenaga kerja yang dibutuhkan; waktu yang dibutuhkan; dan kurva S serta jumlah yang diperlukan dalam pelaksanaan proyek adalah sebesar Rp. 22.989.167.332, 42, serta membutuhkan waktu untuk menyelesaikan pekerjaan selama 84 hari.
Alt. Description
In a project, especially in overlay rigid road Surabaya-Gresik STA 0+000 – STA 3+450 project, the precise planning of cost and strategy is very important to avoid unpredictable matters. Here in this final project will discuss the estimation of cost and time on overlay rigid road. The analyzing done in this final project is the calculation of volume in every kind activities, the calculation of capacity, the rent cost of some hard tools, the single calculation in every kind activities and the calculation of S curve criticals link from Ms. Project.
The result of the calculation is a project schedule, the need material, worker need, the right time need and S curve plus the cost of the project. It is about Rp. 22.989.167.332, 42. In addition it also needs 84 days to finish this project. To get this project done base on schedule in this project planning, all project executor and people involved be serious an focus on this project.
| Contributor | : |
- Machsus, ST., MT.
| | Date Create | : | 22/07/2011 | | Type | : | Text | | Format | : | pdf | | Language | : | Indonesian | | Identifier | : | ITS-NonDegree-3100011044582 | | Collection ID | : | 3100011044582 | | Call Number | : | RSS 625.8 Gun e |
Source : Non Degree of Civil Engineering, RSS 625.8 Gun e, 2011
Coverage : ITS Community
Rights : Copyright @2011 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library
Share this information to :
Google Bookmarks | Technorati | Del.icio.us | Digg
[ Free Download - Free for All ]
- ITS-NonDegree-16966-3107030028-Cover_id.pdf - 36 KB
 - ITS-NonDegree-16966-3107030028-Cover_en.pdf - 10 KB
 - ITS-NonDegree-16966-3107030028-Approval_Sheet.pdf - 115 KB
 - ITS-NonDegree-16966-3107030028-Abstract_id.pdf - 78 KB
 - ITS-NonDegree-16966-3107030028-Abstract_en.pdf - 78 KB
 - ITS-NonDegree-16966-3107030028-Preface.pdf - 78 KB
 - ITS-NonDegree-16966-3107030028-Table_of_Content.pdf - 86 KB
 - ITS-NonDegree-16966-3107030028-Illustrations.pdf - 81 KB
 - ITS-NonDegree-16966-3107030028-Tables.pdf - 78 KB
 - ITS-NonDegree-16966-3107030028-Enclosure_List.pdf - 78 KB
 - ITS-NonDegree-16966-3107030028-Chapter1.pdf - 545 KB
 - ITS-NonDegree-16966-3107030028-Conclusion.pdf - 85 KB
 - ITS-NonDegree-16966-3107030028-Bibliography.pdf - 77 KB
 - ITS-NonDegree-16966-3107030028-Biography.pdf - 363 KB
 - ITS-NonDegree-16966-3107030028-Presentation1.pdf - 1493 KB
 - ITS-NonDegree-16966-3107030028-Presentation2.pdf - 1501 KB
 - ITS-NonDegree-16966-3107030028-Presentation3.pdf - 1456 KB

[ FullText Content - Please, register first ]
1. ITS-NonDegree-16966-3107030028-Chapter2.pdf - 258 KB  2. ITS-NonDegree-16966-3107030028-Chapter3.pdf - 356 KB  3. ITS-NonDegree-16966-3107030028-Chapter4.pdf - 845 KB  4. ITS-NonDegree-16966-3107030028-Chapter5.pdf - 342 KB  5. ITS-NonDegree-16966-3107030028-Chapter6.pdf - 84 KB  6. ITS-NonDegree-16966-3107030028-Enclosure1.pdf - 1357 KB  7. ITS-NonDegree-16966-3107030028-Enclosure2.pdf - 612 KB  8. ITS-NonDegree-16966-3107030028-Enclosure3.pdf - 1393 KB  9. ITS-NonDegree-16966-3107030028-Enclosure4.pdf - 1390 KB  10. ITS-NonDegree-16966-3107030028-Enclosure5.pdf - 278 KB 
[ Link of Contents]
10 Similar Document...
No similar subject found !
10 Related Document...
|