EMAIL: PASSWORD:
Mohon Maaf, untuk sementara layanan upload mandiri mahasiswa tidak dapat dilakukan karena adanya perbaikan server.
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Dewi Eka Agustina


Ansi Aflacha Putri


Tondo Indra Nyata


Aprillia Tri Wulansari




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Non Degree » T.Sipil Konsentrasi Bang.Transp.
Posted by dee@its.ac.id at 09/01/2012 16:37:39  •  1095 Views


PERENCANAAN PENINGKATAN JALAN PERKERASAN LENTUR JALAN WIDANG GRESIK SURABAYA STA 22+400 STA 25+400 KABUPATEN LAMONGAN - PROVINSI JAWA TIMUR

REDESIGN OF BETTERMENT ROAD FLEXIBLE PAVEMENT WIDANG - GRESIK - SURABAYA STA 22 +400 - STA 25 +400 LAMONGAN REGENCY - EAST JAVA PROVINCE

Created by :
YULIATMOKO, RENDY  ( 3108030148 )
DWIJAYANTO, EGA



SubjectJalan raya
Jalan aspal
Alt. Subject Pavements--roads
KeywordWidang-Gresik-Surabaya
Pelebaran
Overlay
Saluran tepi jalan

Description:

Ruas jalan yang berada di Raya Lamongan - Widang ini memiliki kondisi lapangan dengan lebar perkerasan total 14 m (4 lajur 2 arah, tiap lajur 3,5 m) dimana permukaan/lapisan aspal yang didapati bergelombang dan retak pada beberapa titik, lebar median 1,5 m; lebar bahu jalan 1,5 m dengan tipe jalan 4/2 D dan pada beberapa ruas juga tidak terdapat saluran tepi jalan (drainase). Dengan kondisi demikian maka perlu dilakukan perencanaan pelebaran dan perbaikan (overlay) jalan raya Lamongan - Widang STA 22+400 STA 25+400 ini guna mengatasi permasalahan tersebut serta merupakan salah satu program penanganan optimalisasi fungsi prasarana transportasi antar daerah. Perencanaan peningkatan jalan ini meliputi perhitungan pelebaran pada samping eksisting jalan dengan menggunakan Perencanaan Tebal Perkerasan Lentur Jalan Raya Dengan Metode Analisa Komponen SNI 03-1732-1989 dan perhitungan tebal lapis tambahan (overlay) dengan Manual Pemeriksaan Perkerasan Jalan Dengan Alat Benkleman Beam dan menggunakan Petunjuk Perencanaan Tebal Perkerasan Lentur Jalan Raya dengan Metode Analisa Komponen, 1987. Analisa kapasitas jalan dengan menggunakan metode Manual Kapasitas Jalan Indonesia (MKJI) (jalan luar kota), 1997. Kontrol geometrik jalan dengan menggunakan Manual Kapasitas Jalan Indonesia (MKJI) (jalan luar kota), 1997 dan Dasar - Dasar Perencanaan Geometrik Jalan oleh Silvia Sukirman. Perencanaan drainase dengan menggunakan metode SNI-03-342-1994 ( Tata Cara Perencanaan Drainase Permukaan Jalan), Dan rencana anggaran biaya menggunakan HSPK (Harga Satuan Pokok Kegiatan). Hasil perencanaan peningkatan jalan raya Lamongan - Widang dengan umur rencana 10 tahun ini, diperoleh lapis permukaan menggunakan Laston (MS 744) dengan tebal 5 cm. Nilai DS (Degree of Saturation) < 0,75, tetapi diadakan pelebaran untuk memperkuat struktur jalan bagian samping yang kebanyakan rusak. Kontrol alinyemen horizontal yang menghasilkan alternative geometric lengkung horisontal. Perencanaan saluran tepi (drainase) berbentuk trapesium dengan bahan dari batu kali diperoleh dimensi saluran yang bervariasi. Rencana anggaran biaya untuk perencanaan peningkatan jalan Widang Gresik - Surabaya sejumlah Rp 4.400.000.000,00 ( Empat Milyar Empat Ratus Juta Rupiah). Dengan pembangunan jalan raya Lamongan Widang ini, diharapkan jalan ini dapat berfungsi dengan baik serta melayani beban lalu lintas yang cukup berat sesuai dengan umur yang direncanakan.


Alt. Description

Roads that are in Lamongan - Widang has field conditions with a total pavement width of 14 m (4-lane two-way, each lane 3.5 m) where the surface / layer of asphalt was found to wavy and cracked at some point, the median width 1.5 m, 1.5 m wide road shoulder with the type of road 4 / 2 D and in some sections there is also no channel side of the road (drainage). Under these conditions it is necessary to plan the widening and improvements (overlay) highway Lamongan - Widang STA 22 +400 - 25 +400 STA is to overcome these problems and is one of the treatment plan optimization function of inter-regional transportation infrastructure. Planning involves the calculation of road upgrading in addition to widening the existing road pavement thickness by using the Planning Highway With Bending Component Analysis method and calculation of SNI 03-1732-1989 thick additional layer (overlay) with Manual Examination Pavement Road With Tool Benkleman Beam and use the Planning Guide Highway Pavement thickness Bending with component Analysis Method, 1987. Analysis of road capacity by using the method of Road Capacity Manual Indonesia (MKJI) (the road out of town), 1997. Geometric control path by using the Indonesian Road Capacity Manual (MKJI) (the road out of town), 1997 and Basic - Basic Geometric Road Planning by Silvia Sukirman. Planning drainage using SNI-03-342-1994 (Procedures for Road Surface Drainage Plan), and the budget plan costs using HSPK (Unit Price Principal Activities). The results of the highway improvement planning Lamongan - Widang with this 10-year design life, the surface layer obtained using Laston (MS 744) with 5 cm thick. Value of DS (Degree of Saturation) <0.75, but was held to strengthen the structure of the road widening of the side most damaged. Controls the horizontal alignment that produces a horizontal arched geometric alternative. Planning edge channel (drainage) with a trapezoid-shaped stone materials obtained from various channel dimensions. Plan budget for the planning of road upgrading Widang - Gresik - Surabaya Rp 4,400,000,000.00 (Four Million Four Hundred Billion Rupiah). With the construction of highways Lamongan - Widang this, this road is expected to function properly and serve the traffic load is heavy enough age-appropriate planned.

Contributor:
  1. Ir. Imam Prayogo
Date Create:25/01/2011
Type:Text
Format:pdf
Language:Indonesian
Identifier:ITS-NonDegree-3100011044791
Collection ID:3100011044791
Call Number:RSS 625.8 Yul p


Source :
Non Degree of Civil Engineering, RSS 625.8 Yul p, 2011

Coverage :
ITS Community

Rights :
Copyright @2011 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/perencanaan-peningkatan-jalan-perkerasanlentur-jalan-widang--gresik--surabaya-sta22400--sta-25400-kabupaten-lamongan-provinsi-jawa-timur-17139.html




[ Free Download - Free for All ]

  1.  ITS-NonDegree-17139-3108030155-Cover_id.pdf - 31 KB
  2.  ITS-NonDegree-17139-3108030155-Cover_en.pdf - 14 KB
  3.  ITS-NonDegree-17139-3108030155-Approval_Sheet.pdf - 377 KB
  4.  ITS-NonDegree-17139-3108030155-Abstract_id.pdf - 251 KB
  5.  ITS-NonDegree-17139-3108030155-Abstract_en.pdf - 221 KB
  6.  ITS-NonDegree-17139-3108030155-Preface.pdf - 197 KB
  7.  ITS-NonDegree-17139-3108030155-Table_of_Content.pdf - 207 KB
  8.  ITS-NonDegree-17139-3108030155-Illustrations.pdf - 180 KB
  9.  ITS-NonDegree-17139-3108030155-Tables.pdf - 206 KB
  10.  ITS-NonDegree-17139-3108030155-Chapter1.pdf - 454 KB
  11.  ITS-NonDegree-17139-3108030155-Conclusion.pdf - 216 KB
  12.  ITS-NonDegree-17139-3108030155-Biography1.pdf - 133 KB
  13.  ITS-NonDegree-17139-3108030155-Biography2.pdf - 97 KB
  14.  ITS-NonDegree-17139-3108030155-Presentation.pdf - 971 KB

[ FullText Content - Please, register first ]

  1. ITS-NonDegree-17139-3108030155-Chapter2.pdf - 1018 KB
  2. ITS-NonDegree-17139-3108030155-Chapter3.pdf - 218 KB
  3. ITS-NonDegree-17139-3108030155-Chapter4.pdf - 1024 KB
  4. ITS-NonDegree-17139-3108030155-Chapter5.pdf - 1428 KB



Give your Comment here...


 10 Similar Document...

     No similar subject found !

 10 Related Document...

     No related subject found !




HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

Overlay , Pelebaran , Saluran , Saluran tepi jalan , Widang-Gresik-Surabaya , jalan , tepi



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




45458760


Visitors Today : 3145
Total Visitor : 2449541

Hits Today : 55198
Total Hits : 45458760

Visitors Online: 49


Calculated since
16 May 2012

You are connected from 107.22.120.91
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2014 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan