EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Dewi Eka Agustina


Ansi Aflacha Putri


Tondo Indra Nyata


Aprillia Tri Wulansari




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Non Degree » Teknik Sipil - Kimpraswil D3
Posted by dee@its.ac.id at 10/01/2012 08:40:00  •  293 Views


PERENCANAAN REHABILITASI BENDUNG BLIMBING KABUPATEN PONOROGO

REHABILITATION PLANNING WEIR BLIMBING PONOROGO DISTRICT

Created by :
PURNOMO ( 3108038712 )
GUNANTO, SIDIK



SubjectBendungan
Irigasi
Alt. Subject Dams
KeywordBendung blimbing
Analisa hidrologi
Stabilitas

Description:

Air merupakan karunia Tuhan Yang Maha Esa yang diperlukan oleh manusia, hewan, dan tumbuh – tumbuhan. Apalagi air yang ada di sungai sangat besar manfaatnya untuk keperluan air irigasi persawahan, maka dari itu perlu adanya suatu bangunan untuk penangkap air tersebut berupa bendung. Bendung Blimbing terletak di Desa Prayungan Kecamatan Sawoo Kabupaten Ponorogo. Bendung ini mengairi sawah seluas 139 Ha. Bendung Blimbing mengambil air dari kali Sawoo yang masuk daerah Irigasi Keyang atas. Bendung ini di kelola oleh Dinas Pekerjaan Umum Kabupaten Ponorogo Bidang Sumber Daya Air. Dengan dibangunnya bendung Blimbing diharapkan mampu mengairi areal sawah tersebut. Analisa hidrologi untuk menentukan debit banjir pada periode ulang 100 tahun, menentukan hujan rata – rata dengan menggunakan metode Theisen Polygon. Perhitungan tinggi hujan rencana dengan menggunakan metode Log-Persson tipe III dan distribusi Normal. Uji kecocokan distribusi frekwensi dengan menggunakan metode Uji Chi-Kuadrat dan Uji Smirnov- Kolmogorov. Perhitungan banjir rencana dengan menggunakan metode Nakayasu. Lebar total bendung (B) sesuai dengan bangunan lama yaitu 38 meter. Elevasi mercu bendung +151,22, dihitung berdasarkan elevasi Intake bangunan lama, yaitu elevasi +150.80 lebar pintu 0,80 m tinggi bukaan pintu 0,28 m elevasi muka air down stream +150.93. Mercu bendung direncanakan tipe bulat, kolam olak direncanakan tipe bak tenggelam. Tubuh bendung direncanakan stabil terhadap geser, guling, erosi bawah tanah (piping), dan bangunan tidak turun.


Alt. Description

Water is a gift of God Almighty which is required by humans, animals, and grow - plants. Moreover, the water in the river is very beneficial for rice irrigation water, therefore there is need for a building to catch water in the form of the weir. Blimbing weir is located in the Village District Prayungan Sawoo Ponorogo. This weir to irrigate rice fields covering an area of 139 Ha. Weir Blimbing time fetching water from entering the area Sawoo Irrigation Keyang above. This dam is managed by the Public Works Department Ponorogo Water Resources Sector. With the construction of weirs Blimbing expected to irrigate the rice acreage. Hydrological analysis to determine the flood discharge at the 100-year return period, determine the average rainfall - average using Polygon Theisen. Calculation of the high rain plan using the log-Persson type III and Normal distribution. Test fit the frequency distribution using the Chi-Square and Kolmogorov-Smirnov Test. Calculation of flood plan by using the method Nakayasu. Total width of the weir (B) in accordance with the old building is 38 meters. Summit elevation +151.22 weir, intake was calculated based on the elevation of the old building, the elevation +150.80 0.80 m wide door 0.28 m high door openings down stream water level elevation of +150.93. Crow\\\\\\\'s planned weir type round, the pool is planned megrim tub type sink. Planned dam body is stable against sliding, rolling, underground erosion (piping), and the building does not go down.

Contributor:
  1. Ir. Sismanto
Date Create:22/07/2011
Type:Text
Format:pdf
Language:Indonesian
Identifier:ITS-NonDegree-3100011044900
Collection ID:3100011044900
Call Number:RSS 627.8 Pur p


Source :
Non Degree of Civil Engineering, RSS 627.8 Pur p, 2011

Coverage :
ITS Community

Rights :
Copyright @2011 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/perencanaan-rehabilitasi-bendung-blimbing-kabupaten-ponorogo-17141.html




[ Free Download - Free for All ]

  1.  ITS-NonDegree-17141-3108038721-Cover_id.pdf - 46 KB
  2.  ITS-NonDegree-17141-3108038721-Cover_en.pdf - 48 KB
  3.  ITS-NonDegree-17141-3108038721-Approval_Sheet.pdf - 244 KB
  4.  ITS-NonDegree-17141-3108038721-Abstract_id.pdf - 175 KB
  5.  ITS-NonDegree-17141-3108038721-Abstract_en.pdf - 81 KB
  6.  ITS-NonDegree-17141-3108038721-Preface.pdf - 175 KB
  7.  ITS-NonDegree-17141-3108038721-Table_of_Content.pdf - 180 KB
  8.  ITS-NonDegree-17141-3108038721-Illustrations.pdf - 174 KB
  9.  ITS-NonDegree-17141-3108038721-Tables.pdf - 177 KB
  10.  ITS-NonDegree-17141-3108038721-Chapter1.pdf - 279 KB
  11.  ITS-NonDegree-17141-3108038721-Conclusion.pdf - 175 KB
  12.  ITS-NonDegree-17141-3108038721-Bibliography.pdf - 173 KB
  13.  ITS-NonDegree-17141-3108038721-Biography.pdf - 519 KB
  14.  ITS-NonDegree-17141-3108038721-Presentation1.pdf - 1586 KB
  15.  ITS-NonDegree-17141-3108038721-Presentation2.pdf - 1519 KB

[ FullText Content - Please, register first ]

  1. ITS-NonDegree-17141-3108038721-Chapter2.pdf - 404 KB
  2. ITS-NonDegree-17141-3108038721-Chapter3.pdf - 190 KB
  3. ITS-NonDegree-17141-3108038721-Chapter4.pdf - 560 KB
  4. ITS-NonDegree-17141-3108038721-Chapter5.pdf - 303 KB
  5. ITS-NonDegree-17141-3108038721-Chapter6.pdf - 1069 KB
  6. ITS-NonDegree-17141-3108038721-Chapter7.pdf - 248 KB
  7. ITS-NonDegree-17141-3108038721-Enclosure.pdf - 634 KB



Give your Comment here...


 10 Similar Document...

     No similar subject found !

 10 Related Document...






HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

Analisa , Analisa hidrologi , Bendung , Bendung blimbing , Stabilitas , blimbing , hidrologi



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




24014875


Visitors Today : 2990
Total Visitor : 1430286

Hits Today : 60839
Total Hits : 24014875

Visitors Online: 80


Calculated since
16 May 2012

You are connected from 54.234.231.49
using CCBot/2.0


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2013 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan