EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Non Degree » Teknik Sipil - Kimpraswil D3
Posted by ansi@its.ac.id at 03/07/2013 09:52:20  •  1095 Views


MOJOAGUNG RING ROAD DESIGN STA 2050 to STA 5266 JOMBANG DISTRICT

Author :
PUTRA, FAJAR ARIES ( 3109038004 )
NUGROHO, RACHMAD




ABSTRAK

Jalan atau jalan raya merupakan sarana dan prasarana transportasi yang sangat penting keberadaannya untuk menghubungkan daerah satu dengan daerah yang lain atau suatu tempat dengan tempat lain untuk aktivitas dan dinamika masyarakat serta untuk memperlancar suatu kegiatan. Keberadaan Jalan Lingkar Mojoagung Kabupaten Jombang sebagai salah satu upaya untuk mengatasi permasalahan lalu lintas di pusat kecamatan tersebut. Hal ini dikarenakan meningkatnya aktifitas perekonomian sehingga berdampak meningkatnya volume kendaraan yang melintasi Kota Kecamatan Mojoagung - Jombang. Kondisi ruas jalan yang tidak sebanding dengan perkembangan jumlah kendaraan yang melalui Kota Kecamatan Mojoagung - Jombang mengakibatkan kemacetan yang tidak dapat dihindari sehingga kenyamanan dan keamanan pengguna jalan berkurang. Peningkatan dan pelebaran jalan arteri pada tengah Kota Kecamatan Mojoagung tidaklah mungkin dapat dilaksanakan dikarenakan kondisi tepi jalan arteri merupakan pusat perdagangan masyarakat Mojoagung. Perencanaan Jalan Lingkar Mojoagung ini meliputi perencaan geometrik jalan raya berdasarkan Standart Untuk Perencanaan Geometrik Jalan Antar Kota Direktorat Jenderal Bina Marga 1990 Analisa kapisatas jalan dengan menggunakan Manual Kapasitas Jalan Indonesia MKJI 1997 Perencanaan tebal perkerasan dengan metode analisa komponen 1987 serta Perencanaan drainase dengan SNI-03-3432-1994. Dari perhitungan dan analisa perencanaan diperoleh hasil untuk geometrik jalan pada alinyemen horisontal didapatkan hasil 6 enam tikungan yang terdiri dari full circel dan spiral circle spiral dengan kecepatan rencana Vr 60kmjam sedangkan alinyemen vertikal didapat kelandaian maksimal 2. Pada perencanaan lebar jalan berdasarkan analisa kapasitas jalan diperoleh hasil yang menetapkan tipe jalan yang digunakan untuk Jalan Lingkar mojoagung adalah Tipe Empat Lajur Dua Arah Tak Terbagi 42 UD dengan Lebar Per-lajur adalah 350 meter dan lebar bahu jalan 200 meter. Pada tahap perencanaan tebal perkerasan lentur perhitungan dilaksanakan dengan metode bertahap dengan tahapan 6 tahun pada tahap pertama 9 tahun pada tahap kedua dan 5 tahun pada tahap terakhir dilaksanakan dengan overlay. Didapatkan susunan perkerasan surface course Laston MS 744 tebal total 185 cm 7556 cm sub base course Batu Pecah Kelas B CBR 80 tebal 22 cm dan base course Sirtu Kelas A CBR 70 tebal 23 cm. Untuk drainase menggunakan dimensi segi empat dengan dimensi maksimal tinggi 189 m dan lebar 100 m. Total anggaran untuk Jalan Lingkar Mojoagung sebesar Rp. 36.839.635.00000 Tiga Puluh Enam Milyar Delapan Ratus Tiga Puluh Sembilan Juta Enam Ratus Tiga Puluh Lima Ribu Rupiah.


ABSTRACT

Street or highway is the transportation infrastructure of great importance to connect the one with the other area or a place to another place for the activities and dynamics of the community and to facilitate an activity. The existence of Jombang District Mojoagung Ring Road as part of efforts to address traffic problems in the central districts. This is due to increased economic activity that affects the increasing volume of vehicles that traverse the City District Mojoagung - Jombang. Road conditions are not comparable with the development of the number of vehicles through the City District Mojoagung - Jombang cause congestion that can not be avoided so that the comfort and safety of road users is reduced. Improvement and widening of arterial roads in the center of the City District Mojoagung could not have been implemented due to the condition of the road is an artery of trade center Mojoagung community. Mojoagung Ring Road planning involves planning based on geometric highway Geometric Standards for Planning Inter-City Road Directorate General of Highways 1990 Analysis kapisatas road capacity by using Jalan Indonesia Manual MKJI 1997 Planning pavement thickness by the method of component analysis and planning of drainage by 1987 SNI-03-3432-1994. The calculation and analysis of the results obtained planning to the geometric path in the horizontal alignment results obtained 6 six curve consisting of the full circel and spiral - circle - a spiral with velocity Vr 60kmjam plan while the vertical alignment obtained a maximum 2 slope. Width of the path planning based on analysis of road capacity obtained results that specifies the type of roads used for Mojoagung Ring Road is a Type Four Row Two-Way Undivided 42 UD by Per-lane width is 3.50 meters and width of the shoulder of the road 200 yards. At the planning stage flexible pavement thickness the calculation carried out by the method of stages with stages in the first 6 years 9 years old at the second stage and 5 years on the last stage implemented with overlay. Obtained the composition of pavement surface course LASTON MS 744 total thickness 18.5 cm 7.5 5 6 cm sub-base course Class B Broken Stone CBR 80 of 22 cm thick and the base course Class A Sirtu CBR 70 23 cm thick. For drainage using rectangular dimensions with maximum dimensions of 1.89 m high and 1.00 m wide. Total budget for the Ring Road Mojoagung Rp. 36.839.635.00000 Thirty Six Billion Eight Hundred Thirty Nine Million Six Hundred Thirty Five Thousand Rupiah



Keywordsjalan baru
 
Subject:  jalan
Contributor
  1. Ir. Dunat Indratmo, MT
Date Create: 16/07/2012
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-NonDegree-31002130000366
Collection ID: 31002130000366
Call Number: RSS 625.7 Put p


Source
Non Degree Thesis of Civil Engineering, RSS 625.7 Put p, 2013

Coverage
ITS Community

Rights
Copyright @2013 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-NonDegree-25930-3109038004-007-abstract-id_putra_nugroho.pdf - 205 KB
  2.  ITS-NonDegree-25930-3109038004-007-abstract-en_putra_nugroho.pdf - 205 KB
  3.  ITS-NonDegree-25930-3109038004-007-conclusion_putra_nugroho.pdf - 158 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan