EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Non Degree » Teknik Sipil - Kimpraswil D3
Posted by dee@its.ac.id at 17/05/2013 09:11:43  •  2199 Views


CONSOLIDATION DAM PLANNING OF SYPHON LEMURUNG VILLAGE BRUMBUNG SUB-DISTRICT KEPUNG DISTRICT KEDIRI

Author :
SUTARDI ( 3109038005 )
HERWANDI, HERU




ABSTRAK

Syphon Lemurung terletak di desa Brumbung Kecamatan Kepung Kabupaten kediri berfungsi untuk menyuplai irigasi di Kab. Jombang . Untuk mengamankan bangunan syphon tersebut terhadap aliran air dan bahaya penggerusan dasar sungai maka pada bagian hilir syphon dibangun Konsolidasi Dam. Konsolidasi Dam yang sudah ada sudah mulai terjadi kerusakan-kerusakan yang cukup parah. Menanggapi kerusakan dam yang ada maka dipandang perlu untuk membangun konsolidasi dam yang baru supaya bangunan syphon yang sudah ada tetap aman terhadap bahaya aliran sungai Konto. Dalam perencanaan Konsolidasi Dam Syphon Lemurung diperlukan perhitungan yang tepat seperti analisis hidrologianalisis hidrolika dan kontrol stabilitas terutama terhadap bahaya guling dan geser. Hal tersebut disebabkan Konsolidasi Dam Lemurung berada pada aliran material Gunung Kelud yang masih aktif.


ABSTRACT

Syphon of Lemurung situated in the Village Brumbung Subdistrict Kepung District Kediri serves to supply irrigation at District Jombang. To secure that syphon towards waterflow and river scouring so consolidation dams were built at syphon downstream. The consolidation dams which already built had been damaged in serious condition. To cope with that damaged so it is necessary to build a new consolidation damin order that syphon still secure from riverflow threat. During the planning of Consolidation Dam of Syphon Lemurung a precise calculation is needed such like hydrology analysis hydraulic analysis and stability control especially from roll and shear threat. Those analysises are needed because Consolidation Dam of Syphon Lemurung located on Mount Keluds material flow which still active.



KeywordsKonsolidasi DAM; Perencanaan; Kontrol Stabilitas
 
Subject:  Jembatan -- Desain dan konstruksi
Contributor
  1. Ir. FX. Didik Harijanto, CES
Date Create: 16/07/2012
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-NonDegree-31002130000447
Collection ID: 31002130000447
Call Number: RSS 627.8 Sut p


Source
Non Degree of Civil Engineering, RSS 627.8 Sut p, 2013

Coverage
ITS Community

Rights
Copyright @2013 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-NonDegree-25150-3109038017-3109038005-Abstract_id.pdf - 207 KB
  2.  ITS-NonDegree-25150-3109038017-3109038005-Abstract_en.pdf - 207 KB
  3.  ITS-NonDegree-25150-3109038017-3109038005-Conclusion.pdf - 224 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan