EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Non Degree » Teknik Sipil - Kimpraswil D3
Posted by tondoindra@gmail.com at 26/11/2014 17:50:55  •  1221 Views


ANALYSIS OF OPTIMUM SPEED AND MINIMUM COST OF CONSTRUCTING 1 UNITS OF HOUSE TYPE 45 LOCATED AT DRIYOREJO PERUM PERUMNAS GRESIK BRANCH

Author :
KURNIANTO, ARY  ( 3110038003 )
SETIAWAN, DENNY




ABSTRAK

Dalam perencanaan suatu proyek disamping waktu dan sumber daya faktor biaya cost mempunyai peranan yang sangat penting. Dimana biaya harus dikendalikan dan diatur seminimum mungkin penggunaannya. Pengendalian waktu proyek harus memperhatikan faktor biaya karena terdapat hubungan yang erat antara waktu penyelesaian proyek dengan biaya-biaya proyek yang bersangkutan. Terdapat beberapa metode pelaksanaan pembangunan rumah sederhana guna mendapatkan biaya yang minimal dan waktu penyelesaian yang optimal. Metode yang digunakan adalah TCTO Time Cost Trade Off yaitu dengan melakukan pemampatan waktu Kompresi terhadap jaringan kerja yang ada. Pada Proyek Akhir ini ada dua Alternatif yang digunakan Pertama menambah jam kerja Lembur dan yang kedua adalah menambah jumlah tenaga kerja ii 61607 Percepatan waktu dengan Alternatif 1 jam kerja dengan penambahan 3 jam per hari pada pekerjaan struktur dan rangka dan penutup atap menyebabkan waktu pelaksanaan berkurang dari waktu normal 61 hari menjadi 55 hari sehingga menyebabkan penambahan biaya langsung dari Rp. 52.979.87160 menjadi Rp.53.344.69854 sedangkan biaya tidak langsung berkurang dari Rp.5.297.98716 menjadi Rp.4.828.77038 yang mengakibabkan biaya total normal berubah dari Rp.58.277.00000 menjadi Rp.58.173.46892 61607 Percepatan waktu dengan menggunakan Alternatif 2 tenaga kerja pada pekerjaan struktur dan rangka dan penutup atap menyebabkan waktu pelaksanaan mengalami perubahan dari durasi normal 61 hari menjadi 52 hari dan biaya total Rp.58.277.00000


ABSTRACT

In a project planning beside time and resource cost is also important. Cost must be controlled and managed as minimum as possible. Operation and usage of time must pay attention cost because there is relation between finishing time with costs of project There are many kinds of method development of house construction to get cost minimum and optimal finishing time. The method which used is TCTO Time Cost Trade Off that is time compression to network. In this project there are two alternatives that be used first work done outside of normal working hours overtime work and adding the amount of worker. 61607 Acceleration of time with first alternative office hours with increasing of office hours 3 hours in a day in work of building structure and roof truss and roof coverings cause reduction realization time become 55 days from normal time 61 days with the result that addition direct cost from Rp. ii 52.979.87160 becoming Rp.53.101.48070 while indirect cost decrease from Rp.5.297.98716 becoming Rp.4.828.77038 cause total cost change from Rp.58.277.00000 becoming Rp.58.173.46892 61607 Acceleration of time with second Alternative 2 worker in work of building structure and roof truss and roof coverings cause reduction realization time become 52 days from normal time 61 days and total cost Rp.58.277.00000



KeywordsTime Cost Trade Off ( TCTO )Rumah Sederhana Type 45Dilokasi Driyorejo
 
Subject:  Manajemen proyek;Bahan bangunan
Contributor
  1. Ir.IMAM PRAYOGO, M.MT
Date Create: 16/07/2013
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-NonDegree-31002140000944
Collection ID: 31002140000944
Call Number: RSS 692.5 Kur a


Source
Non Degree of Civil Engineering RSS 692.5 Kur a, 2014

Coverage
ITS Community

Rights
Copyright @2013 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-NonDegree-34098-3110038003-3110038011-Conclusion.pdf - 187 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan