EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Proceeding » Fakultas Teknologi Kelautan
Posted by rudiwp@oe.its.ac.id at 23/09/2015 18:03:28  •  1311 Views


STATUS PENGEMBANGAN PEMBANGKIT LISTRIK TENAGA GELOMBANG LAUT SISTEM BANDULAN PLTGL-SB 20 KW

Author :
MUKHTASOR ( 196904201994031003 )
ZAMRISYAF   ARIF, IRFAN SYARIF ; PRASTIANTO, RUDI WALUJO




ABSTRAK

The development of sea wave power plant technology in Indonesia is do needed due to huge practical potential of wave energy in Indonesia as which has been ratified by the Indonesian Ocean Energy Association INOCEANASELI as large as 1200 MW. Also according to UU No.172007 the utilization of ocean energy in Indonesia has been targeted to be realized in the period of 2009-2014. Development of wave power plant technology could be used to solve especially the problem of electricity deficit in most small group of islands in Indonesia. Hopefully this effort could improve Indonesia to be an independent and advance largest archipelago country. This paper presents the development of Wave Power Plant Technology with Pendulum System PLTGL-SB of 20 kW in Indonesia. The sustainable cooperation research has been conducting among ITS Institutions of Research and Development and industry to produce a pontoon with optimal design with eight square-shaped for PLTGL-SB with installed capacity of 1000 Watts. Further through a cooperation scheme of ITS-LIPI-PLN the development of PLTGL-SB has been done to increase the capacity to be 3500 W which is based on existing generators that had been produced by LIPI. Currently by financial support from the Ministry of Research and Technology a scaling-up process of the turbine up to 20 kW is being performed using a tripod pontoon. This PLTGL-SB 20 kW is expected to be a solution to the area of small islands with limited access of electricity. Furthermore this effort inline with and contributive the a road map for the wave energy sector in the Buku Putih Energi 2005 - 2025 which states that during 2011-2015 in Indonesia could be generated wave energy conversion system up to 320 kW.



KeywordsThe development of sea wave power plant technology in Indonesia is do needed due to huge practical potential of wave energy in Indonesia as which has been ratified by the Indonesian Ocean Energy Association (INOCEAN/ASELI) as large as 1200 MW. Also, accor
 
Subject:  Gelombang laut
Date Create: 30/11/2015
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-Proceeding-40114150000132
Collection ID: 40114150000132
Call Number: 627.32 Muk s


Source
Article of Proceedings

Coverage
ITS Community

Rights
Seminar Teori dan Aplikasi Teknologi Kelautan SENTA Inovasi Teknologi Kelautan 2013




[ Download - Summary ]

ITS-Proceeding-40114150000132-38984.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 3.81.73.233
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2019 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan