EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Lingkungan Ekstensi
Posted by hassane at 13/01/2010 13:28:37  •  4725 Views


PERENCANAAN PENGEMBANGAN SISTEM DISTRIBUSI AIR BERSIH KOTA KENDARI PROPINSI SULAWESI TENGGARA INTAKE POHARA

PLANNING OF THE DEVELOPMENT WATER DISTRIBUTION SYSTEM AT KENDARI CITY INTAKE POHARA SOUTH EAST

Author :
YULIASRIE, POPPY AMBARTIQA 




ABSTRAK

Pengembangan Kota Kendari dan peningkatan jumlah penduduk menuntut PDAM sebagai satu-satunya jasa penyedia air bersih untuk mampu meningkatkan pelayanannya. Namun demikian kendala topografi wilayah distribusi mengakibatkan kurangnya tekanan pada saat jam puncak. Disamping tingginya tingkat kebocoran yang terjadi 40. Sampai dengan tahun 2005 PDAM Kota Kendari Intake Pohara baru dapat menjangkau 4142 pelanggan dari 36.315 KK yang tinggal di wilayah pelayanan. Perencanaan pengembangan ini meliputi evaluasi teknis dan peningkatan target pelayanan yang direncanakan mengikuti standar Millenium Development Goals MDGs dan Standar Nasional Indonesia bidang air bersih. Untuk evaluasi sistem jaringan distribusi air bersih dilakukan menggunakan program Epanet Versi 2.0 Perencanaan dilakukan dalam 2 tahap yaitu tahap I melalui penambahan kapasitas sebesar 60 ldtk dan meningkatkan target pelayanan menjadi 5606 serta menurunkan tingkat kebocoran sampai menjadi 38 dengan total investasi sebesar Rp.1.730.615.333- Untuk tahap II melalui penambahan kapasitas sebesar 67 ldtk dan meningkatkan target pelayanan menjadi 7071 serta menurunkan tingkat kebocoran sampai menjadi 355 dengan total investasi sebesar Rp. 1.933.004.033-


ABSTRACT

Kendari city development and the total citizen increasement demand PDAM as the only clean water suplier service to able increasing it8217s service. But the problem with topography distribution area result lack pressure at peak hour. Beside the height of leakage level that exist 40. Until 2005 PDAM Kendari city Intake Pohara able to reach 4142 customers from 36.315 KK that lives in service area. The development plan is including technics evaluation and the increasement service target that is plan to follow Millenium Development Goals standard and clen water field Standard Nasional Indonesia. To evaluate clean water distribution net is done by using Epanet Programme Version 2.0 Planning is done in to stage the first stage by 5606 adding 60 ls capacity and increasing service target to 5606 and decrease leakage level to 38 with total investment Rp. 1.730.615.333- In second stage by adding 67 ls capacity and increasing service target to 7071 and decrease leakage level to 355 with total investment Rp. 1.933.004.033-



KeywordsDISTRIBUSI AIR BERSIH ; PDAM
 
Subject:  ...
Contributor
  1. Ir. Bowo Djoko Marsono, M.Eng
Date Create: 01/03/2007
Type: Text
Language: Indonesian
Identifier: ITS-Undergraduate-3100007028625
Collection ID: 3100007028625
Call Number: RSL 628.144 Yul p


Source
Undergraduate Theses of Environmental Engineering, RSL 628.144 Yul p , 2006

Rights
Copyright @2006 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Undergraduate-7555-3301109010-kesimpulan.pdf - 24 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 3.237.66.86
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2020 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan