EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Arsitektur
Posted by hassane at 12/01/2010 15:47:00  •  4794 Views


PENINGKATAN KAPASITAS PRODUKSI INSTALASI PENGOLAHAN AIR BABAT PDAM KABUPATEN LAMONGAN

Author :
SANDY, ARIF PALUPI 




ABSTRAK

Pentingya pemenuhan kebutuhan air bersih menjadikan agenda Pemerintah Indonesia untuk meningkatkan pelayanan dari separuh prosen penduduk yang belum terlayani akses air minum saat ini sebagai sasaran pada tahun 2015 target MDG. Begitu juga Instalasi Pengolahan Air Minum IPA Babat yang memproduksi air bersih dari salah satu sumber air baku milik PDAM Kabupaten Lamongan yaitu sungai Bengawan Solo. Dengan dua instalasi yang ada IPA Babat telah melayani 1378 penduduk wilayah pelayanannya. Sasaran akan tercapai dengan peningkatan prosen pelayanan hingga 5689. Peningkatan prosen pelayanan diupayakan dengan peningkatan kapasitas produksi sebesar 450 Ltdt. Kapasitas produksi ditingkatkan dengan pengoperasian kedua instalasi yang ada pada kapasitas perencanaan sebesar 120 Ltdt setiap instalasi danperencanaan bang unan pengolahan air minum untuk instalasi baru berkapasitas 210 Ltdt. Instalasi baru direncanakan dalam 2 tahap yang membutuhkan 4 pra sedimentasi 1 pengaduk cepat 1 pengaduk lambat 4 sedimentasi 4 filter dan 1 reservoir untuk tiap tahap sebagai unit utama. Perencanaan instalasi baru juga dilengkapi intake pembubuh bahan kimia dan sludge drying bed. Perencanaan instalasi baru membutuhkan biaya program sebesar Rp. 4.570.014.12000 untuk setiap tahap.


ABSTRACT

The importance of clean water requirements fullfillment make Indonesia Government agenda8217s to increase services from a half of Indonesia society percentage that has not serviced clean water access as an objective in 2015 MDG target. Even so Babat water treatment plant that produce clean water from one of PDAM Lamongan regency water source properties that is Bengawan Solo river. With two existing installation this water treatment have serviced 1378 society on its service area. The objective will reach out with raising percentage of service until 5689. The increasing of services percentage effort with production capacities upgrading as big as 450 Lts. Production capacities upgrade with operating both existing installation on planning capacities at 120 Lts each installation and planning water treatment plant for new installation with 210 Lts capacities. New installation planned in two stages which need 4 Plain sedimentations 1 flash mixing 1 slow mixing 4 sedimentations 4 filters as main unit operation on each stages. New installation planning is completed too with intake facilities dosing reagen and sludge drying bed. Cost predicted for New installation planning require 4.570.014.12000 rupiahs programme budget on each stages.



KeywordsAir Bersih ; Bangunan Pengolahan Air Minum ; Peningkatan Kapasitas Produksi ; Instalasi Babat
 
Subject:  ...
Contributor
  1. Ir. HARI WIKO INDARYANTO, M.Eng
Date Create: 01/03/2007
Type: Text
Language: Indonesian
Identifier: ITS-Undergraduate-3100007029202
Collection ID: 3100007029202
Call Number: RSL 628.1 San p


Source
Undergraduate Theses of Architecture Engineering, RSL 628.1 San p , 2007

Rights
Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Undergraduate-7432-3300100008-kesimpulan.pdf - 32 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 3.80.4.76
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2019 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan