 |
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
|
Phone |
: |
031-5921733 , 5923623 |
|
Fax |
: |
031-5937774 |
|
E-mail |
: |
libits@its.ac.id |
|
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
|
timit_perpus@its.ac.id |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Taufik Rachmanu  Dewi Eka Agustina  Ansi Aflacha Putri  Tondo Indra Nyata  Aprillia Tri Wulansari
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
ITS » Undergraduate Theses » Teknik Perkapalan Ekstensi - S1 Posted by anis at 22/11/2008 15:21:40 • 12429 Views
PENINGKATAN PRODUKTIVITAS GALANGAN KAPAL MENGGUNAKAN MODEL OMAX (STUDI KASUS : DI PT. BEN SANTOSA SURABAYA)SHIPYARD PRODUCTIVITY MEASUREMENT USING OMAX METHOD (Case Study : PT. BEN SANTOSA Surabaya)Created by :
Mahendra, Much. Khairuddin
| Subject: | Galangan kapal | | Keyword: | Tingkat produktivitas Metode OMAX |
Description:
Produktivitas merupakan tolak ukur keberhasilan proses produksi di dok dan galangan kapal baik untuk pekerjaan reparasi maupun galangan baru. Dalam tugas akhir ini dilakukan pengukuran tingkat produktivitas dan cara – cara peningkatan produktivitas dengan menggunakan metode OMAX yang merupakan suatu metode unjuk kerja yang menggunakan indikator – indikator produksi dan suatu prosedur pembobotan untuk memperoleh suatu indikator pencapaian total. Hasil dari tugas akhir menunjukkan bahwa faktor yang berpengaruh terhadap produktivitas adalah material, man hour, penggunaan mesin, pemakaian tenaga kerja atau jam orang (JO), jam kerja efektif, jam kerja aktual dan ketidakhadiran karyawan. Tingkat prestasi galangan bangunan kapal baru yang tertinggi dicapai pada periode fabrikasi dan sub-assembly dengan harga indikator pencapaian 300, sedangkan prestasi yang terburuk pada periode erection dengan indikator pencapaian 278. Dok reparasi mencapai prestasi tertinggi pada tahun 2005 dengan harga indikator pencapaian 564,963 sedangkan yang terburuk pada tahun 2002 dengan harga indikator pencapaian 297. Usaha untuk meningkatkan produktivitas dilakukan dengan cara memperhatikan prioritas utama faktor produktivitas dalam melakukan perbaikan, dimana prioritas didasarkan pada bobot tiap faktor produktivitas. Perbaikan faktor - faktor produktivitas dilakukan dengan pembenahan pada pembentuk rasio – rasio faktor produktivitas.
Alt. Description
Productivity is a milestone to measure the success rate of production process in dock and shopyard, either in ship reparation or new shipbuilding . In this final project productivity measuring method called OMAX will be used to measure the productivity rate. OMAX is a performance measuring method which employs production indicators and weighing prosedure to show the total achievement indicator of certain process. The final project, a measuring method called OMAX will be used to measure the productivity rate. OMAX is a method to show certain performance level using production indicator and weighing prochedure to obtain a total achievement indicator.
The result of this final project show that factors that effect the productivity are material , man haour, machine usage, workforce usage, effective work-hour, actual work-hour, and employee absence rate. The best achievement rate for new shipbuilding task was achieved at fabrication process and sub assembly process with achievement indicator value of 300, while the worst rate happenend in erection process with achievement indicator value of 278. Reparation dock achieved the highest rate at 2005 with achievement indicator value of 563.963, while the worst rate happened in 2002 with achiecement indicator value of 297. Effort to increase the productivity can be done by fixing productivity factor that has high priority, where each priority is based on the weigh of each productivity factors. Productivity fixing is done by arranging the productivity factors ratio.
| Contributor | : |
- Ir. Soejitno
| | Date Create | : | 22/11/2008 | | Type | : | Text | | Format | : | pdf. | | Language | : | Indonesian | | Identifier | : | ITS-Undergraduate-3100007030165 | | Collection ID | : | 3100007030165 | | Call Number | : | RSPe 623.83 Mah p |
Source : Undergraduate theses, DEPARTMENT OF NAVAL ARCHITECT RSPe 623.83 Mah p, 2007
Coverage : ITS Community Only
Rights : Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library
Publication URL : http://digilib.its.ac.id/peningkatan-produktivitas-galangan-kapal-menggunakan-model-omax-studi-kasus--di-pt-ben-santosa-surabaya-2347.html
[ Free Download - Free for All ]
...No Files...
[ FullText Content - Please, register first ]
1. ITS-Undergraduate-2347-4102109010-judul.pdf - 196 KB 2. ITS-Undergraduate-2347-4102109010-bab1.pdf - 34 KB 3. ITS-Undergraduate-2347-4102109010-bab2.pdf - 281 KB 4. ITS-Undergraduate-2347-4102109010-bab3.pdf - 48 KB 5. ITS-Undergraduate-2347-4102109010-bab4.pdf - 177 KB 6. ITS-Undergraduate-2347-4102109010-bab5.pdf - 287 KB 7. ITS-Undergraduate-2347-4102109010-kesimpulan.pdf - 50 KB 8. ITS-Undergraduate-2347-4102109010-lampiran.pdf - 187 KB
Give your Comment here...
10 Similar Document...
10 Related Document...
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?

      
Visitors Today : 487
Total Visitor : 1427777
Hits Today : 15310
Total Hits : 23969346
Visitors Online: 16
Calculated since 16 May 2012
You are connected from 184.73.74.47 using CCBot/2.0
|