EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Sipil Ekstensi S1
Posted by dewi007 at 11/11/2008 15:36:21  •  6484 Views


ECONOMY-TECHNO ANALYSIS AT APARTMENT METROPOLIS

Author :
Kurniawati, Danny 




ABSTRAK

Cepatnya pergerakan ekonomi-bisnis di Surabaya diikuti oleh tumbuhnya sektor properti. Salah satu apartemen yang di bangun awal 2006 adalah Apartemen Metropolis. Fasilitas yang terdapat pada Apartemen Metropolis-pun terbilang lengkap. Mulai dari lift AC hingga areal parkir sampai 3 lantai. Penyediaan fasilitas berpengaruh pada kebutuhan listrik dan biaya operasional proyek tersebut. Perencanaan parkir sampai dengan 3 lantai-pun turut menentukan pendapatan dari Apartemen Metropolis. Maka perencanaan teknis dari suatu bangunan akan mempengaruhi aspek finansial dari suatu proyek. Ditinjau dari aspek teknis KDB Apartemen Metropolis sebesar 60 KLB sebesar 477 dan tinggi bangunan untuk tower AB adalah 46 m dan untuk tower C adalah 55 m sesuai dengan peratutran yang dikeluarkan oleh Dinas Tata Kota Pemerintah Kota Surabaya. Penggunaan utulitas bangunan menghasilkan kebutuhan listrik sebesar 220.85910 Kwhbln yang menyebabkan biaya operasional untuk listrik bulan sebesar Rp.231.038.55883. Ditinjau dari aspek finansialnya NPV-nya yaitu Rp.46.546.543.33609. IRR-nya 1547 lebih besar dari MARR yang ditetapkan yaitu 1279. Payback Period-nya menunjukkan investasi kembali pada tahun ke-12. Titik impas Apartemen Metropolis dicapai jika harga jual diturunkan sebesar 52 dari harga awal atau unit terjual mencapai 72.


ABSTRACT

The fast movement of the economic business in Surabaya has been followed by growing of property sector. One of apartment was builded by early 2006 is Metropolis Apartment. Facilities which can be found on Metropolis Apartment are complete. Start from lift AC till areal park until 3 floor. The complete facilities have influenced requirment of electrics and operating expense of the project. Planning park up to 3 floor has determined the earnings from Metropolis Apartment. There fore the technical planning from a building will influences the financial aspect from the project. The evaluation from technical aspect shows that KDB of Metropolis Apartment is 60 KLB of Metropolis Apartment is 477 and high of building for the tower of AB is 46 m and for the tower of C is 55 m as according to regulation by on duty Govermental Urban Planning of town Surabaya. Use of utilitas building yield the electrics requirement of equal to 220.85910 Kwhmonth causing operating expense for the electrics of month of equal to Rp.231.038.55883. The evaluation from financial aspect shows that NPV of Metropolis Apartment is Rp.46.546.543.33609. IRR of Metropolis Apartment is 1547 bigger than MARR specified which is 1279. Payback Period shows the investment will return in the year to 12. Brek even point of Metropolis Apartment reached by if price sell degraded by equal to 52 from price of early or until sold to reach 72.



KeywordsAnalisa Tekno Ekonomi; Apartemen Metropolis
 
Subject:  Apartemen
Contributor
  1. Ir.I Putu Artama Wiguna, MT.PhD
Date Create: 11/11/2008
Type: Text
Format: pdf.
Language: Indonesian
Identifier: ITS-Undergraduate-3100007030273
Collection ID: 3100007030273
Call Number: RSSP 647.92 Kur a


Source
Civil Engineering, RSSP 647.92 Kur a, 2007

Coverage
ITS Community Only

Rights
Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Undergraduate-3100007030273-2162.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan