EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha



Custom Search

ITS » Undergraduate Theses » S1 Teknik Elektro
Posted by aseri at 25/04/2009 09:34:51  •  9093 Views


STUDI PERENCANAAN SALURAN TRANSMISI 150 KV ANTARA PLTU JATIM I GI PACITAN

PLANNING STUDY OF 150 KV TRANSMISSION LINE BETWEEN PLTU JATIM I GI PACITAN

Author :
Nasrulloh, Nizar  




ABSTRAK

Energi listrik sangat penting peranannya dalam kehidupan manusia. Pertumbuhan penduduk yang pesat mengakibatkan meningkatnya kebutuhan energi listrik di Indonesia. Oleh karena itu PLN sebagai penyedia energi listrik semaksimal mungkin untuk memenuhi kebutuhan tersebut. Salah satu langkah yang dilakukan yaitu dengan merencanakan membangun Pembangkit Listrik Tenaga Uap (PLTU) Jatim I. Dengan adanya rencana pembangunan PLTU tersebut, perlu juga dilakukan perencanaan penyaluran energi listrik yang dihasilkan oleh pembangkit yaitu melalui saluran transmisi (SUTT) 150 KV. Dalam Tugas Akhir ini akan dibahas tentang perencanaan saluran transmisi 150 kV antara PLTU Jatim I sampai Gardu Induk (GI) Pacitan sepanjang ± 45 km yang melalui 5 kecamatan dan 14 desa. Dengan pembahasan tersebut diharapkan dapat diperoleh dasar peralatan penyaluran energi listrik melalui jaringan transmisi tegangan tinggi 150 kV yang tepat. Sehingga dapat dilakukan penyaluran energi listrik yang sesuai secara teknis dan ekonomis. Saluran transmisi 150 kV antara PLTU Jatim I sampai GI Pacitan ini diharapkan dapat memenuhi sistem kelistrikan di Jawa Bali


ABSTRACT

Electrical Energy has importance role in human life. Fast resident growth result the increasing requirement of electrical energy in Indonesia. Therefore PLN as willer of electrical energy maximally to fulfill requirement. One of the step is by planning to develop build steam power plan ( PLTU) Jatim I. With existence of plan development of PLTU, require to planning of transmiss ion of electrical energy that produce by power plan that is passing 150 kV overhead transmission circuit. In this Final Project will be studied about planning of 150 kV transmission circuit between PLTU Jatim I until Pacitan substation with distance ± 45 km which passing 5 districts and 14 villages. With the solution expected can be to obtained base equipments of electrical energy transmission through 150 kV high voltage transmission circuit. So that can be conducted of appropriate electrical energy technically and economic. This 150 kV transmission circuit between PLTU Jatim I until pacitan substation is expected can fulfill electricity system of Java - Bali.

KeywordsSUTT 150 kV ; Dasar peralatan.
 
Subject:  Transmisi energi
Contributor
  1. Ir. Soedibyo, MMT
    Ir. Syariffuddin Mahmudsyah, M.Eng
Date Create: 25/04/2009
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Undergraduate-3100007030369
Collection ID: 3100007030369
Call Number: RSE 621.319 Nas s


Source
Under graduade thesis, Electrical Departement, RSE 621.319 Nas s

Coverage
ITS Community only

Rights
Copyright @2005 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/studi-perencanaan-saluran-transmisi-150-kvantara-pltu-jatim-i-gi-pacitan-3911.html




[ Free Download - Free for All ]

...No Files...




 Similar Document...



 Related Document...

     No related subject found !




HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

150 , Dasar , Dasar peralatan. , SUTT , SUTT 150 kV , kV , peralatan.




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




100230435


Visitors Today : 2058
Total Visitor : 2925656

Hits Today : 111230
Total Hits : 100230435

Visitors Online: 43


Calculated since
16 May 2012

You are connected from 54.81.191.202
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2016 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan