 |
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
|
Phone |
: |
031-5921733 , 5923623 |
|
Fax |
: |
031-5937774 |
|
E-mail |
: |
libits@its.ac.id |
|
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
|
timit_perpus@its.ac.id |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Taufik Rachmanu  Dewi Eka Agustina  Ansi Aflacha Putri  Tondo Indra Nyata  Aprillia Tri Wulansari
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
ITS » Undergraduate Theses » Teknik Sipil Posted by anis at 22/12/2008 17:24:24 • 6422 Views
STUDI KELAYAKAN FLYOVER DI JALAN DEMAK SURABAYA DILIHAT DARI SEGI LALU LINTAS DAN EKONOMI JALAN RAYAFEASIBILITY STUDY OF DEMAK FLYOVER, SURABAYA BASED ON TRAFFIC ENGINEERING AND HIGHWAY ECONOMIC POINT OF VIEWCreated by :
Rahmat
| Subject: | Jalan
| | Keyword: | Flyover Kemacetan Studi kelayakan |
Description:
Kemacetan merupakan masalah lalu lintas yang sering terjadi di Surabaya. Salah satu diantaranya adalah karena adanya perlintasan sebidang antara jalan raya dengan rel kereta api. Ditinjau dari sisi ekonomi, tundaan yang dialami kendaraan jalan raya itu merupakan biaya (cost) lebih yang harus dibayar pengguna kendaraan akibat mengalami tundaan (macet). Salah satu contohnya berada di jalan Demak. Mengingat adanya undang - undang yang mengatur tentang perlintasan sebidang, yaitu UU No 13 tahun 1992, maka perlu untuk mencari alternatif pemecahan masalah ini. Salah satu alternatifnya yaitu dengan membangun flyover (jalan layang). Dari hasil analisa biaya operasi kendaraan diperoleh penghematan BOK sebesar Rp. 91.375.637.563,00 dan penghematan nilai waktu akibat tundaan kereta api Rp. 187.582.782.739,00. Dari hasil analisa ekonomi diperoleh nilai BCR (Benefit Cost Ratio) sebesar 1,11 dan nilai NPV Rp. 8.002.621.273,00. Dari hasil di atas, dapat dikatakan bahwa pembangunan flyover tersebut dianggap layak untuk dibangun.
Alt. Description
Traffic jam is a major problem which alway happens in Surabaya. It is cause by an intersection between highway and railway. Based on economic side, delay is overcost that paid by user because of the traffic jam. The example is in Demak street. Because of road rights, UU No 13 - 1992, so we need a solution to solve this problem. One of this solution is bulding a flyover. From BOK analyze, BOK saving is Rp. 91.375.637.563,00 and time value saving is Rp. 187.582.782.739,00. From economic analyze, Benefit Cost Ratio (BCR) is 1,11 and NPV value is Rp. 8.002.621.273,00. So, the conlusion is that flyover feasible to build.
| Contributor | : |
- IR. Dudung Purwadi, M.Sc
| | Date Create | : | 22/12/2008 | | Type | : | Text | | Format | : | pdf. | | Language | : | Indonesian | | Identifier | : | ITS-Undergraduate-3100008031255 | | Collection ID | : | 3100008031255 | | Call Number | : | RSS 625.7 Rah s |
Source : Undergraduate Theses, DEPARTMENT OF CIVIL ENGINEERING RSS 625.7 Rah s, 2008
Coverage : ITS Community Only
Rights : Copyright @2008 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library
Publication URL : http://digilib.its.ac.id/studi-kelayakan-flyover-di-jalan-demak-surabaya-dilihat-dari-segi-lalu-lintas-dan-ekonomi-jalan-raya-3155.html
[ Free Download - Free for All ]
...No Files...
[ FullText Content - Please, register first ]
1. ITS-Undergraduate-3155-3102100069-judul.pdf - 179 KB 2. ITS-Undergraduate-3155-3102100069-bab1.pdf - 294 KB 3. ITS-Undergraduate-3155-3102100069-bab2.pdf - 861 KB 4. ITS-Undergraduate-3155-3102100069-bab3.pdf - 133 KB 5. ITS-Undergraduate-3155-3102100069-bab4.pdf - 149 KB 6. ITS-Undergraduate-3155-3102100069-bab5.pdf - 189 KB 7. ITS-Undergraduate-3155-3102100069-kesimpulan.pdf - 63 KB 8. ITS-Undergraduate-3155-3102100069-lampiran.pdf - 1147 KB
Give your Comment here...
10 Similar Document...
10 Related Document...
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?

      
Visitors Today : 3602
Total Visitor : 1430899
Hits Today : 72482
Total Hits : 24026518
Visitors Online: 63
Calculated since 16 May 2012
You are connected from 23.20.196.179 using CCBot/2.0
|