UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
|
Phone |
: |
031-5921733 , 5923623 |
|
Fax |
: |
031-5937774 |
|
E-mail |
: |
libits@its.ac.id |
|
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
|
timit_perpus@its.ac.id |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Taufik Rachmanu  Dewi Eka Agustina  Ansi Aflacha Putri  Tondo Indra Nyata  Aprillia Tri Wulansari
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
ITS » Undergraduate Theses » Teknik Perkapalan Ekstensi - S1 Posted by anis at 22/11/2008 14:38:02 • 13851 Views
ANALISA TEKNIS PEMBANGUNAN KAPAL PERINTIS 350 TON DWT DALAM HUBUNGANNYA DENGAN PEMBANGUNAN KAPAL-KAPAL TUG BOAT SECARA SERI (STUDI KASUS DI DOK DAN GALANGAN KAPAL PT BEN SANTOSA)
TECHNICAL ANLYSIS OF DEVELOPMENT OF PERINTIS COAST 350 TON DWT IN ITS RELATON WITH THE DEVLOPMENT OF TUG BOAT SHIP BREAK EVENLY (CASE STUDY IN DOCK AND SHIPYARD PT. BEN SANTOSA)Created by :
Kurniawan, Andi
| Subject: | Galangan kapal | | Keyword: | Metode Semi Tendem Perencanaan dan Penjadwalan |
Description:
Ketepatan waktu penyelesaian atau delivery time pada pembangunan sebuah kapal
tergantung dari sistem perencanaan dan penjadwalan yang dibuat oleh pihak galangan
sebelum proses produksi pembangunan kapal baru dimulai. Dalam tugas akhir ini dilakukan pengaturan kembali sistem perencanaan dan penjadwalan dalam pembangunan 4 buah tug boat dan 2 buah kapal perintis 350 ton DWT yang telah dibuat dok dan galangan kapal PT Ben Santosa.
Hasil dari tugas akhir ini menunjukkan bahwa dengan metode semi tendem maka pembangunan 4 buah kapal tug boat dan 2 buah kapal perintis dapat diselesaikan selama 46 minggu dan lebih cepat dari rencana awal yang dibuat oleh PT. Ben Santosa yaitu 64 minggu dengan penambahan 1407,6 JO di bengkel produksi dan 4936,8 JO di landasan peluncuran. Pengaturan areal building berth dilakukan dengan memindahkan areal penimbunan pelat dan profil sementara. Dan peralatan produksi yang dimiliki galangan PT. Ben Santosa masih mencukupi.
Alt. Description
Delivery time of new ship building depend on planning and scheduling system made by ship yard before production process of building ship newly started. In this final duty conducted by restructuring of planning and scheduling system in development 4 of tug boat and 2 of perintis coaster 350 ton DWT which have been made by dock and dockyard of PT Ben Santosa. Result from this final duty indicate that with the semi tendem method hence development 4 of tug boat and 2 of perintis coaster can be finished by during 46 week and is quicker than plan of early which is made by PT. Ben Santosa that is 64 week with the addition 1407,6 JO in workshop produce and 4936,8 JO in building berth. arrangement of building berth area done by removing areal conglomeration lisp and profile of whereas. And production equipments owned by the yard PT. Ben Santosa still answer the demand.
| Contributor | : |
- Ir. Soejitno.
| | Date Create | : | 22/11/2008 | | Type | : | Text | | Format | : | pdf. | | Language | : | Indonesian | | Identifier | : | ITS-Undergraduate-3100008031558 | | Collection ID | : | 3100008031558 | | Call Number | : | RSPe 623.83 Kur a |
Source : Undergraduate theses, DEPARTMENT OF NAVAL ARCHITECT RSPe 623.83 Kur a, 2007
Coverage : ITS Community Only
Rights : Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library
Publication URL : http://digilib.its.ac.id/analisa-teknis-pembangunan-kapal-perintis-350-ton-dwt-dalam-hubungannya-dengan-pembangunan-kapalkapal-tug-boat-secara-seri-studi-kasus-di-dok-dan-galangan-kapal-pt-ben-santosa-2342.html
[ Free Download - Free for All ]
...No Files...
[ FullText Content - Please, register first ]
1. ITS-Undergraduate-2342-4101109008-judul.pdf - 63 KB 2. ITS-Undergraduate-2342-4101109008-bab1.pdf - 23 KB 3. ITS-Undergraduate-2342-4101109008-bab2.pdf - 67 KB 4. ITS-Undergraduate-2342-4101109008-bab3.pdf - 41 KB 5. ITS-Undergraduate-2342-4101109008-bab4.pdf - 291 KB 6. ITS-Undergraduate-2342-4101109008-kesimpulan.pdf - 16 KB 7. ITS-Undergraduate-2342-4101109008-lampiran.pdf - 165 KB
Give your Comment here...
10 Similar Document...
10 Related Document...
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?

      
Visitors Today : 288
Total Visitor : 1416901
Hits Today : 3094
Total Hits : 23772180
Visitors Online: 79
Calculated since 16 May 2012
You are connected from 23.22.252.150 using CCBot/2.0
|