EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Dewi Eka Agustina


Ansi Aflacha Putri


Tondo Indra Nyata


Aprillia Tri Wulansari


Moh. Fandika Aqsa




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Undergraduate Theses » Teknik Mesin Ekstensi - S1
Posted by ida at 22/08/2008 11:45:21  •  21148 Views


PERENCANAAN SISTEM TATA UDARA KERETA KERETA PENUMPANG PADA RANGKAIAN KERETA API EKSEKUTIF

PASSENGGER COACH AIR CONDITIONING SYSTEM DESIGN OF EXECUTIVE RAILWAY TRAIN

Created by :
Ardiyanto, Taufiq Haryo 



SubjectMesin pendingin udara
KeywordAir Conditioning
Cooling load
Mesin Pendingin
Kereta Penumpang KA Eksekutif

Description:

Sistem penyegar udara hadir untuk memberikan kenyamanan secara termal. Penggunaan sistem penyegaran udara (air Conditioning) ini telah banyak digunakan pada berbagai bidang antara lain di gedung perkantoran, industri, tempat tinggal bahkan alat transportasi. Kereta Api sebagai alat transportasi menyediakan sistem ini sebagai salah satu bentuk pelayanan terhadap para penumpangnya. Untuk dapat menentukan kapasitas mesin penyegar udara yang sesuai untuk kebutuhan dalam kereta Penumpang maupun Restorasi, maka perlu dilakukan perhitungan beban-beban kalor yang harus dikeluarkan dan perancangan sistem dari ruangan yang ingin dikondisikan. Perhitungan beban pendinginan (Cooling Load) ini meliputi beban sensibel dan laten, antara lain beban dari udara luar yang melewati dinding, atap dan lantai, beban dari penumpang, beban dari peralatan elektrik, ventilasi dan infiltrasi. Selain perhitungan beban pendinginan, juga perlu dilakukan perencanaan distribusi udara agar seluruh ruang dapat dikondisikan sesuai kebutuhannya. Dari perhitungan yang dilakukan, dengan asumsi kondisi lingkungan bertemperatur 34 °C (93.2 °F) dengan RH 70 %, dan kondisi rancangan dalam gerbong bertemperatur 23.5 °C (74.3 °F) dengan RH 50 % didapatkan kondisi puncak beban pendinginan terjadi yang pada pukul 14.00 dengan beban total pendinginan (Grand total Heat) untuk Kereta Penumpang sebesar 87919 Btu/hr dan beban total pendinginan untuk Kereta Restorasi sebesar 59719 Btu/hr. Untuk menangani beban-beban pendinginan tersebut maka untuk Kereta Penumpang dipilihlah mesin penyegar udara (Air Coditioning) jenis paket roof mounted unit merk SEMKO type RSK 502 MR dengan kapasitas pendinginan 55000 Btu/hr. Sedang kan untuk Kereta restorasi merk AIR INTERNATIONAL TRANSIT Model RPR17LA5 berkapasitas (60000 Btu/h). Pada Kereta Penumpang digunakan 2 unit mesin pendingin sedangkan pada Kereta Restorasi digunakan 1 unit mesin pendingin.


Alt. Description

Air conditioning system appeared to provide a thermal convenience. Air conditioning has used in many site such as office building, industry, residencial, and even for transportation. As a transportation mode railway train provide air conditioning system as a service for their consumer To determine the capacity of the air conditioning machine that appropriate for the passenger coach and restoration, heat load analysis from desirable room as the output is needed. The cooling load analysis including sensible load and latent load, for examples a load which is come from the utside that get through the wall, roof, and floor. The Load that came from the passenger it self, electricity equipment load, ventilation, infiltration. Despite of cooling load analysis, we need to design the air distribution system so all of the room included. As the result, we have the cooling load peak hour in 14.00 WIB, grand total heat is 87919 Btu/hr and grand total heat for restoration coach is 52103 Btu/hr. And the assumption, enviroment temperature 34 °C (93.2 °F), RH 70% and the temperature inside of the coach is 23.5 °C (74.3 °F) , RH 50 %. To provide all of this load, we choose roof mounted unit type air conditiong from SEMKO (type : RSK 502 MR ), cooling capacity of this type 55000 Btu/hr. Restoration coach, we use AIR INTERNATIONAL TRANSIT Model RPR17LA5 with capacity 6000 Btu/h. We use two unit of this conditioning machine and one unit in restoration coach.

Contributor:
  1. Ir. Sudjud Darsopuspito, MT
Date Create:22/08/2008
Type:Text
Format:pdf
Language:Indonesian
Identifier:ITS-Undergraduate-3100008031807
Collection ID:3100008031807
Call Number:RSM 629.040 289 Ard p


Source :
Undergraduate Theses,DEPARTEMENT OF MECHANICAL ENGINEERING, RSM 629.040 289 Ard p

Coverage :
ITS Community Only

Rights :
Copyright @2008 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/perencanaan-sistem-tata-udara-keretakereta-penumpang-pada-rangkaiankereta-api-eksekutif-2006.html




[ Free Download - Free for All ]

...No Files...

[ FullText Content - Please, register first ]

  1. ITS-Undergraduate-2006-2104 109 623-judul.pdf - 144 KB
  2. ITS-Undergraduate-2006-2104 109 623-bab1.pdf - 56 KB
  3. ITS-Undergraduate-2006-2104 109 623-bab2.pdf - 1808 KB
  4. ITS-Undergraduate-2006-2104 109 623-bab3.pdf - 227 KB
  5. ITS-Undergraduate-2006-2104 109 623-bab4.pdf - 466 KB
  6. ITS-Undergraduate-2006-2104 109 623-bab5.pdf - 152 KB
  7. ITS-Undergraduate-2006-2104 109 623-kesimpulan.pdf - 3389 KB
  8. ITS-Undergraduate-2006-2104 109 623-lamp.pdf - 0 KB



Give your Comment here...


 10 Similar Document...



 10 Related Document...






HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

Air , Air Conditioning , Conditioning , Cooling , Cooling load , Eksekutif , KA , Kereta , Kereta Penumpang KA Eksekutif , Mesin Pendingin , Penumpang , load



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




52290711


Visitors Today : 1
Total Visitor : 2515769

Hits Today : 12320
Total Hits : 52290710

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 10.199.13.5
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2014 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan