EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Lingkungan Ekstensi
Posted by yeni at 15/01/2010 12:23:40  •  4895 Views


PERENCANAAN MATERIAL RECOVERY FACILITY MRF DI TPA LAMONGAN

DESIGN OF MATERIAL RECOVERY FACILITY MRF IN LAMONGAN FINAL DISPOSAL SITE

Author :
NOVIATUN, LUKIS  




ABSTRAK

Meningkatnya jumlah penduduk dan semakin beragamnya aktivitas penduduk Kabupaten Lamongan berdampak pada meningkatnya laju timbulan sampah. Timbulan sampah yang semakin bertambah membutuhkan pengelolaan sampah yang baik dan tepat. Salah satu alternatif fasilitas pengelolaan sampah yaitu Material Recovery Facility MRF. MRF merupakan fasilitas untuk menggabungkan beberapa teknik pengolahan sampah seperti proses pemisahan komposting ataupun biokonversion. Penentuan komposisi sampah dilakukan selama 7 hari dan dilakukan sampling sebanyak 3xhari. Perencanaan MRF di TPA Lamongan meliputi metode dan peralatan yang digunakan luas lahan yang dibutuhkan kebutuhan SDM sistem penampung lindi dan analisa ekonomi. Timbulan sampah di TPA lamongan sebesar 1148675 m3hari atau setara 2296 Tonhari. Pemilahan yang digunakan dalam perencanaan ini adalah secara manual dengan recovery factor untuk plastik sebesar 90 kertas 85 kain 000 kayu 45 kacabotol 100 karet 000 besi 100. Pemanfaatan sampah basah dilakukan dengan pengomposan sebesar 75. Lahan yang tersedia untuk TPA 37000 m2 sedangkan lahan yang dibutuhkan sebesar 29474 m2. Produksi kompos yang dihasilkan sebesar 607788 kghari. Barang lapak yang dihasilkan sebesar 18645 tonhari dan residu yang dihasilkan 6924 tonhari. Rencana anggaran biaya yang diperlukan untuk pembangunan TPA sebesar Rp 4.207.872.375 dengan akumulasi biaya sebesar Rp.32.767.775 dengan periode pengembalian modal pada 76 tahun.


ABSTRACT

The increasing of resident amounts and increasingly having immeasurable it resident activity Kabupaten Lamongan affects at the increasing of speed of arising solid waste. Arises solid waste that is increasingly increases requires management of good solid waste and precise. One of alternative of management facility of solid waste that is Material Recovery Facility MRF. MRF is facility to merge some solid waste processing engineerings like separation process composting and or biokonversion. Determination of composition of solid waste was done during 7 day and was done sampling counted 3xday. Planning of MRF in Lamongan final disposal site covers method and equipments applied land wide required requirement of SDM liquor receiver system and economics analysis. Arises solid waste in Lamongan final disposal site 1148675 m3day or equivalent 2296 Tonday. Sorting applied in this planning is in manual with recovery factor for plastics equal to 90 paper 85 textiles 000 wood 45 glass 100 gum 000 iron 100. Exploiting of organics solid waste was done with composting equal to 75. Land which available to Lamongan final disposal site 37000 m2 while land required 29474 m2. Produce of compost yielded 607788 kgday. Goods recycle materials yielded 18645 tonday and residue yielded 6924 tonday. Cost cost estimate needed to by development of Lamongan final disposal site equal to Rp 4.207.872.375 with accumulation of expense of equal to Rp 32.767.775 with pay-back period of modal in 76 years.



KeywordsSolid waste; MRF; Lamongan final disposal site
 
Subject:  Pembuangan sampah
Contributor
  1. Ipung Fitri P., ST. MT.
Date Create: 15/01/2010
Type: Text
Format: Pdf.
Language: Indonesian
Identifier: ITS-Undergraduate-3100008031838
Collection ID: 3100008031838
Call Number: RSL 628.445 Nov p


Source
Undergraduate Theses, Environmental Engineering, RSL 628.445 Nov p, 2007

Coverage
ITS Community Only

Rights
Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Undergraduate-7957-3303109005-kesimpulan.pdf - 8 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 18.207.240.35
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2020 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan