EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Industri
Posted by budi_hrt@its.ac.id at 28/01/2010 15:11:08  •  3755 Views


EVALUASI IMPLEMENTASI PENGUKURAN K-3 PADA AREA KERJA BOILER 20 STUDI KASUS PROYEK PEMBANGUNAN PLTU X JAWA TENGAH

EVALUATION OF IMPLEMENTATION MEASUREMENT K-3 SAFETY AND WORK HEALTH IN WORK AREA OF BOILER 20 Case Study in Development Project of PLTU X Central Java

Author :
PUTRA, R. HANDA BAGUS ( 2505100097 )




ABSTRAK

Kecelakaan kerja merupakan suatu kejadian yang tidak terduga munculnya dan tidak dapat dihindari namun dapat dicegah melalui usaha preventif. Permasalahan kecelakaan kerja saat ini tidak hanya terjadi pada industri saja namun terjadi pada setiap sektor termasuk pembangunan proyek konstruksi. Pada pembangunan proyek konstruksi dalam skala besar evaluasi berkala terhadap penerapan K-3 melalui suatu pengukuran measurement yang dilakukan dalam empat tahapan. Tahapan pertama pembuatan root cause analysis dari tiap kecelakaan kerja yang terbagi dalam tiga kategori yaitu ringan sedang dan berat. Tahapan kedua adalah pembuatan kuisioner berdasarkan tiga kategori yaitu kebijakan manajemen dan prosedur bangunan fasilitas dan perlindungan pekerja serta pengolahan kuisioner untuk mendapatkan nilai prosentase. Tahapan ketiga adalah pembuatan score for ergonomic dan K-3 dari hasil prosentase ke tiga kategori tersebut dan didapatkan hasil sebesar 56.42. Dan keempat adalah pendesainan nilai score for ergonomic K-3 melalui radar chart dan tabel Tingkat Implementasi Kecelakaan TIK dimana dari hasil pengolahan masuk pada level enam yang dikategorikan dalam kondisi kritis dan dengan segera membutuhkan perbaikan.


ABSTRACT

Work accident is unprecedented event and couldnt be avoided but could be prevented through periodic preventive actions. Work accident problem nowadays not only occurred on the industry but also on the entire sector including construction project site. On the large scale construction project building continueted evaluation of K-3 Safety and Work Health implementation by measurement used four steps. First step of work accident wash using Root Cause Analysis RCA which included three categories minimum medium and maximum. Second step wash giving quisioner based on three categories management policy and procedure facilities building and labor protection and also quisioner for procentage value achievement. Third step wash creating score for ergonomic from the procentage result of its categories were given 56.42 in result. In the end step this study used value designed of score for ergonomic K-3 by radar chart and table work implementation state TIK which its results has categories on level six in critical situation and needed correction of performance immediately.



KeywordsRoot Cause Analysis; Kuisioner; Radar Chart; Tabel Tingkat Implementasi Kecelakaan
 
Subject:  Keselamatan industri
Contributor
  1. Dr. Ir. Sri Gunani Partiwi, MT
  2. Adhitya Sudiarno, ST., MT
Date Create: 28/01/2010
Type: Text
Format: Pdf
Language: Indonesian
Identifier: ITS-Undergraduate-3100009035727
Collection ID: 3100009035727
Call Number: RSI 363.11 Put i


Source
Undergraduate Theses, Industrial Engineering, RSI 363.11 Put i,2009

Coverage
ITS Community Only

Rights
Copyright @2009 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Undergraduate-8399-2505100097-Abstract.pdf - 11 KB
  2.  ITS-Undergraduate-8399-2505100097-Kesimpulan.pdf - 58 KB
  3.  ITS-Undergraduate-8399-2505100097-Paper.pdf - 342 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





Visitors Today : 1575
Total Visitor : 2974331

Hits Today : 142645
Total Hits : 104405346


Calculated since
16 May 2012

You are connected from 54.196.7.61
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2016 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan