ITS » Undergraduate Theses » Teknik Industri Posted by aseri at 15/01/2010 16:53:53 • 3718 Views
PENINGKATAN EFISIENSI PENGELOLAAN LEMBARAN
PLAT SEBAGAI BAHAN BAKU KAPAL DENGAN METODE
LEAN SIX SIGMA STUDI KASUS PT. PAL INDONESIA
IMPROVEMENT OF EFFICIENCY MANAGEMENT SHEET OF STEEL PLATE AS SHIP RAW MATERIAL WITH LEAN SIX SIGMA METHOD CASE STUDY PT. PAL INDONESIA
Author : Farisi, M. Ilham
ABSTRAK
PT. PAL Indonesia merupakan salah satu perusahaan negara terkemuka di Indonesia yang bergerak di sektor industri maritim dan produksinya bersifat job order. Dalam mengoptimalkan proses produksi dan potensi sumber daya yang dimiliki maka dilakukan suatu perbaikan proses yang salah satunya adalah mereduksi waste. Fokus pengamatan
pada penelitian ini pada pembangunan kapal Chemical Tanker M259 dengan batasan sampai proses pemotongan. Dalam penelitian ini diterapkan metode Lean Six Sigma dengan menggabungkan metode Lean Thinking dan Six Sigma yang
bertujuan dapat mengelola proses menjadi efektif dan effisien. Dengan integrasi ini dimungkinkan dapat mengeliminasi waste yang muncul dan
menurunkan variasi proses. Dari hasil penelitian waste kritis yang dijadikan fokus penelitian yaitu waste waiting dimana waste waiting ini memiliki sub
waste berupa loss time pada proses persiapan fabrikasi per block shop blasting dan shop primer marking serta loss time pada proses cutting.
Dari hasil RCA dan FMEA didapat usulan perbaikan yaitu membuat interval waktu yang optimum untuk preventive maintenance pada mesin Overhead Crane 5T x 27M dan mesin NC Plasma Cutting. Waktu preventive maintenance yang optimum untuk 5T x 27M Overhead Crane adalah 36 hari sekali sedangkan untuk mesin NC Plasma Cutting setiap
17 hari sekali.Usulan perbaikan yang kedua adalah pembuatan design label untuk memudahkan operator mengidentifikasi plat setelah proses
shop primer
ABSTRACT
PT.PAL Indonesia is one of the famous local governmental company specialized in maritime industry sector with job order production type. To optimize the production process and main resource
potencies held in their company PT.PAL work on some process improvement such as waste reduction. The main topic in this research is to analyse and reduce waste on Chemical Tanker M259 ship building
with cutting process limitation. Lean Six Sigma implemented on this research with combining
the Lean Thinking Method and Six Sigma to managing the process to be more effective and efficient. With this integrated method it is possible to eliminate wastes that decrease the process variation. The result from this research is the critical waste attribute from main research topic is the waiting time waste where this waste has a
sub waste such as loss time on fabrication preparation process on each block shop blasting and shop primer marking and also on cutting
process. Improvement suggestion gained from the result of RCA and FMEA such as creating the optimum time preventive maintenance interval on Overhead Crane 5T x 27M and NC plasma Cutting machine. The optimum preventive maintenance time for Overhead Crane 5T x 27M machine is once per 36 days and for NC plasma Cutting machine is
once per 17 days. The second suggestion is to create design label for operator to make the identification of plates more easier after the shop
primer process.
Keywords:
Lean Six Sigma ; Maintenance
Subject
: Standart kontrol kualitas
Contributor
Nani Kurniati, ST, MT.
Date Create
: 15/01/2010
Type
: Text
Format
: pdf
Language
: Indonesian
Identifier
: ITS-Undergraduate-3100009036645
Collection ID
: 3100009036645
Call Number
: RSI 658.562 Far p
Source Undergraduate Theses, Industrial Engineering, RSI 658.562 Far p, 2009