EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Dewi Eka Agustina


Ansi Aflacha Putri


Tondo Indra Nyata


Aprillia Tri Wulansari


Moh. Fandika Aqsa




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Undergraduate Theses » Teknik Kes &Keselaman Kerja - D4
Posted by dewi@its.ac.id at 08/03/2010 16:39:29  •  3768 Views


PERANCANGAN EMERGENCY RESPONSE PLAN (PROSEDUR TANGGAP DARURAT) PADA PT. DUTA CIPTA PAKARPERKASA

EMERGENCY RESPONSE PLAN DESIGN AT PT. DUTA CIPTA PAKARPERKASA

Created by :
WAHYUNINGTYAS, IKA AGUSTINA ( 6505040030 )



Subjectmanajemen darurat
Alt. Subject Emergency management
KeywordKeadaan Darurat
Jarak Evakuasi

Description:

Pengembangan area perusahaan PT. Duta Cipta Pakarperkasa pada tahun 2008 menimbulkan pemasalahan baru yaitu perubahan struktur kepegawaian dan ruangan pada bangunan baru dimana menyebabkan ERP (Emergency Response Plan) menjadi kurang. Prosedur tanggap darurat yang lama belum mencakup areal yang baru dan dianggap belum mencukupi, karena hanya melingkupi kejadian kebakaran dan kebocoran, maka perlu dibuat prosedur tanggap darurat yang baru. Berdasar pada denah ruangan (layout) perusahaan, data arah angin, kecepatan angin, jumlah pekerja, intensitas gempa, volume bahan bakar, volume total HCl. Maka dapat dihitung kebutuhan pintu exit, exit route, serta jarak evakuasi aman. Organisasi tanggap darurat baru disusun berdasarkan job description tiap-tiap pekerja, dicantumkan pula nomor kontak yang dapat dihubungi. Perancangan mengacu pada standart Peraturan Daerah DKI Jakarta No.3 Tahun 1992 untuk penentuan density factor, SNI 03-1746-2000 sebagai acuan perancangan mean of escape dan beberapa referensi yang digunakan dalam pengerjaan. Dari hasil perancangan diperoleh bahwa untuk jumlah Emergency exit yang dibutuhkan untuk stage A adalah 8 pintu, stage B adalah 13 pintu, stage C adalah 4 pintu, stage D adalah 4 pintu dan stage E adalah 3 pintu. Ditentukan juga 5 area assembly point yaitu 3 area di dalam kawasan pabrik dan 2 area diluar pabrik. Untuk jarak evakuasi pada kejadian kebocoran bahan kimia (HCl) adalah 60 m dan untuk kejadian ledakan bahan bakar (acetylene) adalah 12.5 cm.


Alt. Description

Expanding area on PT. Duta Cipta Pakarperkasa on 2008 create a new problem, changes of employee structure organization would be considerable to give impact changes manual of emergency response, its cause insufficient and unproperly within emergency response manual application. Previous edittion of ERP just provide instruction that cover fire incident and hazardous material spill, feedback as a reason that emergency response plan must be modificated and change into the new one. According to company layout, wind direction, wind velocity, number of employee, earthquake intencity scale, fuel’s volume, HCl total mass. Thats needs of exit, exit route, protective action distance can be clearly determined. New Emergency Response Team arranges based job description each employee, contact number would be additional information to perform communicative action. Those is highly considerable through standarts application which is Peraturan Daerah DKI Jakarta No.3 Tahun 1992 used as parameter to estimate designs mean of escape facility and another referencies that correlated to this activity. Its resulted, number of emergency exit : 8 exit on stage A, 13 exit on stage B, 4 exit on stage C, 4 exit on stage D and 3 exit on stage E. There is five assembly point area which is three area inside of factory area and two outside of factory area. For evacuation distance had estimated 60 meter on Hazardous chemical leakage (HCl) incident and 12.5 centimeter on Fuel leakage (explotion).

Contributor:
  1. Indri Santiasih, S.KM
  2. Mirna Apriani, ST
Date Create:08/03/2010
Type:Text
Format:pdf.
Language:Indonesian
Identifier:ITS-Undergraduate-3100010037284
Collection ID:3100010037284
Call Number:RSPP 658.477 Wah p


Source :
Undergraduate Theses of Health and Safety Engineering, RSPP 658.477 Wah p, 2009

Coverage :
ITS Community Only

Rights :
Copyright @2009 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/perancangan-emergency-response-planprosedur-tanggap-darurat-pada-pt-dutacipta-pakarperkasa-8735.html




[ Free Download - Free for All ]

  1.  ITS-Undergraduate-8735-6505040030-Cover_id.pdf - 18 KB
  2.  ITS-Undergraduate-8735-6505040030-Cover_en.pdf - 98 KB
  3.  ITS-Undergraduate-8735-6505040030-Approval_Sheet.pdf - 158 KB
  4.  ITS-Undergraduate-8735-6505040030-Abstrak_id.pdf - 159 KB
  5.  ITS-Undergraduate-8735-6505040030-Abstract_en.pdf - 159 KB
  6.  ITS-Undergraduate-8735-6505040030-Preface.pdf - 160 KB
  7.  ITS-Undergraduate-8735-6505040030-Table of Content.pdf - 164 KB
  8.  ITS-Undergraduate-8735-6505040030-Ilustration.pdf - 158 KB
  9.  ITS-Undergraduate-8735-6505040030-Tables.pdf - 158 KB
  10.  ITS-Undergraduate-8735-6505040030-Enclosures.pdf - 158 KB
  11.  ITS-Undergraduate-8735-6505040030-Chapter1.pdf - 176 KB
  12.  ITS-Undergraduate-8735-6505040030-Conclusion.pdf - 161 KB
  13.  ITS-Undergraduate-8735-6505040030-Bibliography.pdf - 161 KB

[ FullText Content - Please, register first ]

  1. ITS-Undergraduate-8735-6505040030-Chapter2.pdf - 378 KB
  2. ITS-Undergraduate-8735-6505040030-Chapter3.pdf - 190 KB
  3. ITS-Undergraduate-8735-6505040030-Chapter4.pdf - 326 KB
  4. ITS-Undergraduate-8735-6505040030-Enclosure1.pdf - 361 KB
  5. ITS-Undergraduate-8735-6505040030-Enclosure2.pdf - 1623 KB



Give your Comment here...


 10 Similar Document...



 10 Related Document...

     No related subject found !




HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

Darurat , Evakuasi , Jarak , Jarak Evakuasi , Keadaan , Keadaan Darurat



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




52304778


Visitors Today : 1
Total Visitor : 2515769

Hits Today : 26387
Total Hits : 52304777

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 10.199.13.5
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2014 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan