EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Dewi Eka Agustina


Ansi Aflacha Putri


Tondo Indra Nyata


Aprillia Tri Wulansari


Moh. Fandika Aqsa




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Undergraduate Theses » Teknik Sipil
Posted by sarwono@its.ac.id at 30/03/2010 15:17:26  •  2285 Views


PERENCANAAN INSTALASI PEMADAM KEBAKARAN RSUD GAMBIRAN KEDIRI GEDUNG B

INSTALLATION PLANNING FIRE EXTINGUISHER RSUD GAMBIRAN KEDIRI BUILDING B

Created by :
Syaftiningrum, Baiq Mubinda ( 3105040741 )



SubjectPemadam kebakaran
Alt. Subject Fire prevention
KeywordRSUD Gambiran Kediri
Kebakaran
Gedung B
Hidran halaman
Hidran gedung
Sprinkler

Description:

RSUD Gambiran Kediri merupakan rumah sakit Pemerintah Daerah Kota Kediri, termasuk dalam klasifikasi rumah sakit type B. Terdapat 5 gedung unit utama, 1 gedung existing, pos keamanan, IPAL, depo sampah dan unit servis. Pada Proyek Akhir ini hanya merencanakan Instalasi Pemadam Kebakaran Gedung B dan menggunakan sistem pencegahan aktif, berupa Hidran dan Sprinkler. Kapasitas aliran hidran halaman sebesar 2400 liter/menit dengan tekanan 3,5 bar dan waktu menyala selama 45 menit. Jumlah hidran halaman yang direncanakan 6 buah, tetapi 2 hidran halaman saja yang menyala saat terjadinya kebakaran. Hidran pertama dengan debit 38 liter/detik dan hidran kedua debitnya 19 liter/detik. RSUD Gambiran Kediri, termasuk dalam klasifikasi hunian dengan bahaya kebakaran ringan. Kapasitas aliran sprinkler untuk bahaya kebakaran ringan sebesar 225 liter/menit dengan tekanan 2,2 kg/cm (2,2 bar), jumlah sprinkler yang direncanakan pada RSUD Gambiran Kediri Gedung B sebanyak 423 buah dan waktu menyala yang direncanakan selama 45 menit. Sedangkan untuk hidran gedung, kapasitas aliran 400 liter/menit selama 45 menit dengan tekanan 3,5 bar. Jumlah hidran gedung yang direncanakan sebanyak 15 buah, diperkirakan yang menyala saat terjadinya kebakaran 2 buah hidran gedung (box) pada satu lantai. Jumlah lantai pada gedung b sebanyak 5 lantai. Hidran gedung dan sprinkler menggunakan pipa tegak kombinasi.. Pasokan air total untuk pemadam kebakaran 230 m3 . Debit yang digunakan dalam perencanaan pompa pemadam kebakaran untuk hidran halaman 205,2 m/jam, hidran gedung dan sprinkler 61,524 m/jam.


Alt. Description

RSUD Gambiran Kediri represent hospital Local Government Of Town of Kediri, included in hospital classification of type B. There are 5 especial unit building, 1 building of existing, security post, IPAL, garbage depo and service unit At this Final Project only planning Installation Fire Company Of Building of B and use active preventive system, in the form of Hydrant and of Sprinkler. Capacities Stream page yard hydrant equal to 2400 litter / minute with pressure 3,5 aflame time and bar during 45 minute. Amount of planned page yard hydrant 6, but 2 aflame just page yard hydrant of moment the happening of fire. First hydrant with debit 38 litter / hydrant and second both of its debit 19 litter / second. RSUD Gambiran Kediri, included in dwelling classification with light fire danger. Stream capacities of sprinkler for the danger of light fire/burning equal to 225 litter / minute with pressure 2,2 singk / cm ( 2,2 bar), amount of planned sprinkler [at] RSUD Gambiran Kediri Building of B counted 423 aflame time and which planned by during 45 minute. While for the hydrant of building, stream capacities 400 litter / minute during 45 minute with pressure 3,5 bar. Amount of planned building hydrant counted 15, estimated aflame of moment the happening of fire 2 building hydrant (box) at one floor. Amount of floor at building of b counted 5 floor. Building hydrant and of sprinkler use pipe straighten combination.. total Water flow for fire company 230 m3 . used flow in the plan pump fire company for the hydrant of page yard 205,2 m / hour, building hydrant and of sprinkler 61,524 m / hour.

Contributor:
  1. SANTOSO AHMAD, ST, MT
Date Create:30/03/2010
Type:Text
Format:pdf
Language:Indonesian
Identifier:ITS-Undergraduate-3100010038246
Collection ID:3100010038246
Call Number:RSS 628.925 Sya p


Source :
Undergraduate Theses, Civil Engineering RSS 628.925 Sya p, 2009

Coverage :
ITS Community Only

Rights :
Copyright @2009 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/perencanaan-instalasi-pemadam-kebakaranrsud-gambiran-kediri-gedung-b-9106.html




[ Free Download - Free for All ]

  1.  ITS-Undergraduate-9106-3105040741-PERENCANAAN INSTALASI PEMADAM KEBAKARAN RSUD GAMBIRAN KEDIRI GEDUNG B.pdf - 21 KB
  2.  ITS-Undergraduate-9106-3105040741-INSTALLATION PLANNING FIRE EXTINGUISHER RSUD GAMBIRAN KEDIRI BUILDING B.pdf - 24 KB
  3.  ITS-Undergraduate-9106-3105040741-Approval_Sheet.pdf - 4 KB
  4.  ITS-Undergraduate-9106-3105040741-Abstract_in.pdf - 11 KB
  5.  ITS-Undergraduate-9106-3105040741-Abstract_en.pdf - 11 KB
  6.  ITS-Undergraduate-9106-3105040741-Table_of_Content.pdf - 23 KB
  7.  ITS-Undergraduate-9106-3105040741-Tables.pdf - 12 KB
  8.  ITS-Undergraduate-9106-3105040741-Illustrations.pdf - 12 KB
  9.  ITS-Undergraduate-9106-3105040741-Graphycs.pdf - 6 KB
  10.  ITS-Undergraduate-9106-3105040741-Bibliography.pdf - 6 KB
  11.  ITS-Undergraduate-9106-3105040741-Biography.pdf - 76 KB
  12.  ITS-Undergraduate-9106-3105040741-Chapter1a.pdf - 6 KB
  13.  ITS-Undergraduate-9106-3105040741-Chapter1b.pdf - 1158 KB
  14.  ITS-Undergraduate-9106-3105040741-Conclusion.pdf - 9 KB

[ FullText Content - Please, register first ]

  1. ITS-Undergraduate-9106-3105040741-Chapter2a.pdf - 12 KB
  2. ITS-Undergraduate-9106-3105040741-Chapter2b.pdf - 573 KB
  3. ITS-Undergraduate-9106-3105040741-Chapter3a.pdf - 9 KB
  4. ITS-Undergraduate-9106-3105040741-Chapter3b.pdf - 200 KB
  5. ITS-Undergraduate-9106-3105040741-Chapter4a.pdf - 7 KB
  6. ITS-Undergraduate-9106-3105040741-Chapter4b.pdf - 31 KB
  7. ITS-Undergraduate-9106-3105040741-Chapter5a.pdf - 6 KB
  8. ITS-Undergraduate-9106-3105040741-Chapter5b.pdf - 1009 KB
  9. ITS-Undergraduate-9106-3105040741-Presentations.pdf - 712 KB



Give your Comment here...


 10 Similar Document...



 10 Related Document...

     No related subject found !




HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

B , Gambiran , Gedung , Gedung B , Hidran , Hidran gedung , Hidran halaman , Kebakaran , Kediri , RSUD , RSUD Gambiran Kediri , Sprinkler , gedung , halaman



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




49028823


Visitors Today : 1
Total Visitor : 2515705

Hits Today : 28328
Total Hits : 49028822

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 10.199.13.5
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2014 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan