EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Sipil D4
Posted by system at 24/05/2010 13:00:34  •  2733 Views


TIME AND COST CALCULATION ANALYSIS TCTO IN THE BUILDING OF SEMARANG UNIVERSITY STUDENTS APARTEMENT IN 50-100 BUILDING PROGRESS

Author :
ILALA, SONNI AGATHA RIDHO  ( 3108 040 601 )




ABSTRAK

Pelaksanaan Proyek Pembangunan rumah susun mahasiswa universitas negeri semarang mengalami keterlambatan. Hal ini dapat dilihat berdasarkan analisa earned value pada minggu pertama bulan April 2008 atau pada saat durasi proyek mencapai 109 hari progress rencana yang seharusnya mencapai 60 ternyata realita di lapangan baru mencapai 4810 atau 88 hari sehingga dapat diambil kesimpulan bahwa proyek tersebut mengalami keterlambatan. Dari progress di atas diperkirakan proyek baru akan selesai pada pertengahan agustus 2008 namun pihak pemilik menginginkan proyek tersebut dapat selesai sesuai jadwal gedung tersebut sudah dapat digunakan. Percepatan waktu ini dapat dilakukan dengan alternative kompresi penambahan tenaga kerja jam kerja lembur.Dalam tugas akhir ini alternative kompresi yang digunakan yaitu penambahan jam kerja lembur dan penambahan tenaga kerja karena aktivitas sisa yang ada merupakan pekerjaan finishing sehingga tidak memerlukan alat berat dalam pelaksanaannya. Sedangkan dari hasil analisa TCTO durasi optimum 201 hari dengan total biaya Rp 9.712.741.93167 masih terdapat denda 19 hari yaitu sebesar Rp 185.821.29200Dan dengan durasi percepatan hasil analisa yaitu 182 hari dan biaya sebesar Rp 9.217.761.07788 ternyata keterlambatan proyek sudah dapat terkejar dan dan lebih menguntungkan dari segi waktu dan biaya.


ABSTRACT

Implementation of the building project of Semarang University stydents apartement had been delayed. This could be seen based on Earnold value analysis in the first week in April 2008 or when the project reached 109 days project plan that should reach 60 in fact in the reality it reached only 4810 or 88 days so it could be concluded that this project had been delayed. From that progress it could be estimated the new project will be finished in the mid August 2008 but the owner wanted project to be finished on schedule and that building is ready to use. This acceleration time could be done with alternative compression of adding manpower working time or over time work. In this final assignmentthe alternative used was adding over time work and manpower because the remaining activities was finishing work so there was no need for heavy equipment in the implementation. Whereas from the TCTO analysis result optimum duration is 201 days with total cost Rp. 9.715.262.76344. There is still 9 days fine about Rp.185.821.29200. And with acceleration duration of analysis result is 182 days and the cost is about Rp. 9.217.761.07788. In fact the delayed project can be competed and more beneficially based on the time and cost aspect.



KeywordsTCTO; Durasi optimum; kompresi
 
Subject:  Pembangunan Rumah Susun
Contributor
  1. Ir Imam Prayogo
Date Create: 05/02/2010
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Undergraduate-3100010039055
Collection ID: 3100010039055
Call Number: RSS 692.5 Ila a


Source
Undergraduate Thesis, Civil Engineering, RSS 692.5 Ila a, 2010

Coverage
ITS Community

Rights
Copyright @2010 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-Undergraduate-3100010039055-10054.pdf




 Similar Document...

     No similar subject found !


! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan