EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Industri - Ekstensi
Posted by dee@its.ac.id at 08/12/2011 08:49:58  •  2719 Views


ANALISA PERBAIKAN PROSES PRODUKSI PADA PROSES PEMBUATAN GUITAR AKUSTIK DENGAN PENDEKATAN LEAN SIX- SIGMA MENGGUNAKAN METODE FMEA. FAILURE MODE AND EFFECTS ANALYSIS DI UKM. SENTANA ART SOLO

PRODUCTION PROCESS IMPROVEMENT ANALYSIS OF ACCOUSTIC GUITAR WITH LEAN SIX SIGMA APPROACH USING FMEA FAILURE MODE AND EFFECTS ANALYSIS METHOD AT UKM. SENTANA ART Solo

Author :
RIANDIANI, RIMA  ( 2503109021 )




ABSTRAK

Sentana Art merupakan home industri instrument Alat musik yang memproduksi produk dengan sistem make to order. Dimana sebuah instrumen diproduksi sesuai dengan keinginan dan kemauan pelanggan dan sesuai pesanan pelanggan. Sementara ini Sentana Art produknya bisa dikatakan kerajinan hand made. Oleh karena itu ketelitian dan tingkat human error harus dapat diminimalisir. Saat ini proses produksi yang ada masih mengalami beberapa proses yang tidak efisien dan efektif. Berdasarkan fakta tersebut diatas dilakukan penelitian dengan tahapan DFMA Define Measure Analyze dan Improve . Tahap Define dilakukan dengan pengumpulan data untuk mengetahui waste apa saja yang terjadi menggunakan pendekatan Lean six sigma. Pada tahap Measure dilakukan perhitungan bobot waste yang paling berpengaruh terhadap proses produksi. Dilanjutkan pada tahap Analyze untuk dapat diketahui dimana akar permasalahan menggunakan Root cause analysis RCA dan dapat ditemukan sistem perbaikan improve yang berkelanjutan pada proses produksi dengan menggunakan metode FMEA.


ABSTRACT

Sentana Art is home industry instrument that produces a product with the make to order system. Instrument manufactured according to customers wants and wishes and in an accordance with customer orders. In the meantime the product of Sentana Art can be said a handicraft. Therefore the reduce of the accuracy and a level of human error must be needed. Currently the production process existing have some processes that are not efficient and effective. Based above the facts research conducted by DFMA phases Define Measure Analyze and Improve. Define phase is done by collecting data to determine what waste is happen use Lean six sigma approach. The Measure phase weighting calculations of the most influential waste of production process. Analyze phase continued to be known where the root of the problem using Root cause analysis RCA and can be found in the system of continuous improvement to improve the production process using the FMEA method.



KeywordsKualitas produk; Waste; Lean Six Sigma; Root cause analysis
 
Subject:  Pengawasan produksi;Kualitas pengawasan
Contributor
  1. Ir. Hari Supriyanto, MSIE
Date Create: 08/02/2011
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Undergraduate-3100011042512
Collection ID: 3100011042512
Call Number: RSI 658.562 Ria a


Source
Undergraduate Thesis of Industrial Engineering, RSI 658.562 Ria a, 2011

Coverage
ITS Community

Rights
Copyright @2011 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Undergraduate-16629-2503109021-Abstract_id.pdf - 82 KB
  2.  ITS-Undergraduate-16629-2503109021-Abstract_en.pdf - 95 KB
  3.  ITS-Undergraduate-16629-2503109021-Conclusion.pdf - 135 KB
  4.  ITS-Undergraduate-16629-2503109021-Paper1.pdf - 739 KB
  5.  ITS-Undergraduate-16629-2503109021-Paper2.pdf - 718 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.81.59.211
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan