 |
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya
Kampus ITS Sukolilo - Surabaya 60111
|
|
Phone |
: |
031-5921733 , 5923623 |
|
Fax |
: |
031-5937774 |
|
E-mail |
: |
libits@its.ac.id |
|
Website |
: |
http://library.its.ac.id
|
Support (Customer Service) :
|
|
timit_perpus@its.ac.id |
|
|
Welcome..guys!
|
Have a problem with your access?
Please, contact our technical support below:
|
LIVE SUPPORT
 Taufik Rachmanu  Dewi Eka Agustina  Ansi Aflacha Putri  Tondo Indra Nyata  Aprillia Tri Wulansari
|
! ATTENTION !
To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently
Still Confuse?
Please read our User Guide
|
|
ITS » Undergraduate Theses » Teknik Perkapalan Ekstensi - S1 Posted by yeni at 12/12/2008 16:16:06 • 30752 Views
STUDI TENTANG LAMA PENYELESAIAN DAN BIAYA PRODUKSI PADA PEMBANGUNAN KAPAL FERRY KMP CAKALANG DI GALANGAN KAPAL PT.ADILUHUNG SARANA SEGARA INDONESIA BANGKALAN
STUDY ABOUT TIME TO FINISH AND COST PRODUCTION ON SHIP BUILDING OF FERRY KMP CAKALANG IN DOCK PT ADILUHUNG SARANA SEGARA INDONESIA BANGKALAN
Created by :
Cahyadi, Farid
| Subject: | Arsitektur kapal Galangan kapal
| | Keyword: | Jam Orang dan Biaya Produksi
|
Description:
Banyak faktor yang berpengaruh terhadap proses pembuatan sebuah kapal. Apabila faktor tersebut mengalami masalah maka proses pembuatan kapal akan mengalami kemunduran dalam hal waktu dan juga akan mengalami penambahan biaya. Hal ini jelas tidak diharapkan oleh galangan pembuat kapal. Untuk mengatasi hal tersebut diatas perlu diadakan penelitian dengan cara melihat sejauh mana pelaksanaan pembuatan kapal tersebut sesuai dengan rencana semula yang telah dibuat. Dalam hal ini adalah tentang masalah jam orang dan waktu pembuatan kapal.
Alt. Description
There are many factor are caused the ship building process. If there is any problem, so the building process will be late and it cost will be increased too. This matter isn’t expected by shipyard. This problem could be done by researching the ship building process that same with work plan. In this case about the manhours and building time
| Contributor | : |
- Ir. Soejitno
| | Date Create | : | 12/12/2008 | | Type | : | Text | | Format | : | pdf. | | Language | : | Indonesian | | Identifier | : | ITS-Undergraduate-4101 109 019 | | Collection ID | : | 3100007029328 | | Call Number | : | RSPe 623.83 Cah s |
Source : Undergraduate Theses,Naval Architec Engineering,RSPe 623.83 Cah s ,2007
Coverage : ITS Community Only
Rights : Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library
Publication URL : http://digilib.its.ac.id/studi-tentang-lama-penyelesaian-dan-biaya-produksi-pada-pembangunan-kapal-ferry-kmp-cakalang-di-galangan-kapal-ptadiluhung-sarana-segara-indonesia-bangkalan-2957.html
[ Free Download - Free for All ]
...No Files...
[ FullText Content - Please, register first ]
1. ITS-Undergraduate-2957-4101109019-judul.pdf - 471 KB 2. ITS-Undergraduate-2957-4101109019-bab1.pdf - 382 KB 3. ITS-Undergraduate-2957-4101109019-bab2.pdf - 405 KB 4. ITS-Undergraduate-2957-4101109019-bab3.pdf - 543 KB 5. ITS-Undergraduate-2957-4101109019-bab4.pdf - 353 KB 6. ITS-Undergraduate-2957-4101109019-kesimpulan.pdf - 346 KB 7. ITS-Undergraduate-2957-4101109019-lampiran.pdf - 577 KB
Give your Comment here...
10 Similar Document...
No similar subject found !
10 Related Document...
|
POLLINGBagaimana pendapat Anda tentang layanan repository kami ?

      
Visitors Today : 2308
Total Visitor : 1433605
Hits Today : 48443
Total Hits : 24086219
Visitors Online: 70
Calculated since 16 May 2012
You are connected from 107.20.129.212 using CCBot/2.0
|