EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Undergraduate Theses » Teknik Informatika Ekstensi - S1
Posted by taujack@its.ac.id at 17/07/2012 08:24:53  •  2498 Views


ANALISA PERBANDINGAN HAMMER PADA PERHITUNGAN PROSES PEMANCANGAN TIANG PANCANG PADA ANJUNGAN LEPAS PANTAI ZORA JACKET PLATFORM

COMPARATIVE STUDY OF HAMMER ON PILE DRIVABILITY ANALYSIS APPLIED TO OFFSHORE FIXED STRUCTURE ZORA JACKET PLATFORM

Author :
YAKIN, MOCH. KHUSNUL  ( 4307100066 )




ABSTRAK

Desain tiang pancang yang modern adalah sebuah proses interaktif yang melibatkan pertimbangan struktural geoteknik dan constructability. Pile Drivability mengacu pada kemampuan dari tiang pancang yang aman tanpa kerusakan dan ekonomis menggunakan alat-alat konstruksi yang tepat pemilihan hammer yang tepat untuk mencapai kedalaman penetrasi sesuai design dan blowcount yang tidak berlebihan sehingga dapat mendukung bearing capacity yang dibutuhkan. Tugas Akhir ini bertujuan untuk menngetahui daya dukung tanah statis dan saat pemancangan selain itu untuk menemukan jenis peralatan yang tepat agar saat pemancangan tidak terjadi overstress dan pile refusal. Dalam Tugas Akhir ini dilakukan analisa pile drivability menggunakan GRLWEAP2005 terhadap 4 jenis hammer yaitu MENCK MRBS 1502 MENCK MRBS 3000 MENCK MRBS 4600 dan MENCK MRBS 6000 pada kondisi plugged dan coring dengan faktor shaft 1 09 08 dan 07. Dari hasil analisa diketahui nilai daya dukung tanah statis untuk kedalaman penetrasi 58 m dengan faktor shaft 1 pada kondisi plugged adalah 9477.2 kN sedangkan pada kondisi coring adalah 9297.1 kN. Untuk nilai daya dukung saat pemancangan pada kedalaman penetrasi 58 m dengan faktor shaft 1 untuk kondisi plugged adalah 4652.899 kN sedangkan pada kondisi coring adalah 4500.578 kN. Hammer yang tidak menyebabkan tiang pancang mengalami keruskan ataupun tidak mengalami pile refusal yaitu hammer dengan tipe MENCK MRBS 3000 dan MENCK MRBS 4600. Peralatan yang efisien dipilih berdasarkan 2 parameter yaitu parameter biaya dan waktu. Untuk parameter waktu direkomendasikan mengunakan hammer dengan tipe MENCK MRBS 4600 dengan selisih 49 menit lebih cepat untuk setiap pemancangan satu tiang pancang. Dengan total waktu tunggu 900 menit dan akan dipasang empat tiang pancang maka diperkirakan total waktu yang dibutuhkan paling lama 3844 menit atau 64.067 jam. Sedangkan untuk parameter biaya direkomendasikan untuk menggunakan hammer dengan tipe MENCK MRBS 3000 dengan rated energy yang lebih rendah dengan asumsi biaya sewa hammer diasumsikan berbanding lurus dengan besarnya rated energy pada hammer dan dihitung setiap 24 jam.


ABSTRACT

Modern design of pile is an interactive process that involves consideration of structural geotechnical and constructability. Pile drivability refers to safety of pile no damage and economical using the proper construction equipment the selection of hammer to achieve the appropriate depth of penetration and blow count that is not excessive so that it can support the required bearing capacity. This Final Project objective is to get static soil capacity and during driving additionally to find the accurate equipment during driving so the pile would not experienced overstress and pile refusal in soil. In this final project pile drivability analysis was conducted using GRLWEAP2005 against 4 types of hammer MENCK MRBS 1502 MRBS MENCK 3000 MRBS MENCK 4600 and MENCK MRBS 6000 on the condition of plugged and coring by shaft factor 1 0.9 0.8 and 0.7. From the analysis of the static soil resistance at 58 m depth of penetration by shaft factor 1 in the plugged condition was 9477.2 kN while for the coring conditions is 9297.1 kN. For the soil resistance during driving at 58 m depth of penetration by shaft factor 1 for plugged condition is 4652899 kN while the coring condition is 4500578 kN. The pile would not experienced overstress or pile refusal by using hammer with type MRBS MENCK 3000 and MENCK MRBS 4600. Efficient equipment is selected based on two parameters the cost and time parameter. For the time parameter it is recommended using a hammer with type MENCK MRBS 4600 by a difference of 49 minutes early for every driving one pile. With total waiting time 900 minutes and will be installed four piles then estimation of maximum total driving time is 3844 minutes or 64.067 hours. As for the cost parameter it is recommended to use a hammer with type MRBS MENCK 3000 with lower rated energy by assuming that hammer rental costs are proportional to the magnitude of the hammer rated energy and counted every 24 hours.



KeywordsPile Drivability; Soil Resistance; Pile Refusal; Overstress
 
Subject:  FONDASI
Contributor
  1. Ir. Handayanu M.Sc., Ph.D.
  2. Dr. Eng. Kriyo Sambodho ST, M.Eng
Date Create: 31/01/2012
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-Undergraduate-43001120000124
Collection ID: 43001120000124
Call Number: RSKe 624.154 Yak a


Source
Undergraduate Theses of Offshore Engineering, RSKe 624.154 Yak a, 2012

Coverage
ITS Community

Rights
Copyright @2012 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-Undergraduate-20054-Abstract_id.pdf - 361 KB
  2.  ITS-Undergraduate-20054-Abstract_en.pdf - 360 KB
  3.  ITS-Undergraduate-20054-Conclusion-370340.pdf - 362 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.80.169.119
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan