EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » S1 Teknik Elektro
Posted by anisw@its.ac.id at 13/05/2016 15:14:50  •  918 Views


STUDY OF COORDINATION ELECTRICAL SYSTEM PROTECTION AT PT. SEMEN TONASA

STUDI KOORDINASI PROTEKSI PADA SISTEM KELISTRIKAN PT. SEMEN TONASA

Author :
MUHAMMAD, NADIR ( 2210100062 )




ABSTRAK

PT. Semen Tonasa sebagai salah satu pabrik semen terbesar di kawasan Indonesia Timur melakukan rencana penambahan pabrik baru Tonasa V dan generator baru 2 x 35 MW untuk menunjang proses produksi. Dengan penambahan beban dan pembangkit muncul permasalahan pada sistem kelistrikannya yaitu sering terjadi padam total blackout pada saat terjadi gangguan sehingga kontinuitas daya terganggu. Melalui tugas akhir ini dilaksanakan studi koordinasi proteksi pada PT. Semen Tonasa yang tepat dalam mendeteksi dan mengisolir gangguan sehingga tidak mengganggu sistem yang berjalan dan mencegah kerusakan peralatan listrik. Dari hasil plot koordinasi kurva arus waktu kondisi existing dapat diketahui bahwa terdapat misscoordination dan overlaping. Melalui hasil analisis dan perhitungan manual direkomendasikan penyetelan pick up rele arus lebih dan penyetelan grading time rele. Rele yang perlu disetel ulang adalah rele arus lebih gangguan fasa overcurrent relay dan rele arus lebih gangguan tanah ground fault relay. Setting rele gangguan tanah untuk trafo distribusi 6.3kV dengan sistem pentahanan NGR 400A mengaktfikan setting 50G dan 51G oleh karena itu untuk rele arus lebih gangguan tanah direkomendasikan penggunaan setting rele 51G dengan kurva definite karena besar gangguan satu fasa ke tanah merupakan gangguan hubung singkat dan nilainya sesuai dengan NGR.


ABSTRACT

PT. Semen Tonasa as one of the largest cement plant in the eastern of Indonesia is planning to add new plants Tonasa V and new generator 2 x 35 MW to support the production process. With the addition of load and generation problems occur in the electrical system the blackout often occur during a fault so the continuity of power is being interrupted. Through this final project carried out the correct studies on the coordination of electrical system protection in order to detecting and isolating the fault so the running system is not disturbed and prevent damage to electrical equipment. The results of time current curve in exisiting conditions can be seen that there are misscoordination and overlapping. Through the analysis and manual calculation result give the recommendation to reset pick up setting and grading time of overcurrent relays. Relays that need to be reset are phase fault overcurrent relays and ground fault relay. Ground fault relay setting for distribution transformators 6.3 kV with grounding system NGR 400A activate 50G and 51G setting so that setting of ground fault relays is recommended to use 51G with definite curve because the single line to ground fault current is a short circuit fault and matching to the NGR value.



KeywordsGangguan; koordinasi proteksi; rele arus lebih gangguan fasa; rele arus lebih gangguan tanah; Fault; coordination of protection; overcurrent relay; ground fault relay
 
Subject:  None
Contributor
  1. Dr. Ir. Margo Pujiantara, MT.
  2. Dr. Eng. I Made Yulistya Negara, ST., M.Sc.
Date Create: 19/01/2015
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-paper-22121160008955
Collection ID: 22121160008955
Call Number: RSE 621.317 Muh s


Source
Paper and Presentations, Electrical Engineering, RSE 621.317 Muh s, 2014

Coverage
ITS Community

Rights
Copyright @2016 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-paper-41498-2210100062-Paper.pdf - 659 KB
  2.  ITS-paper-41498-2210100062-Presentation.pdf - 1871 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.167.253.186
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan