EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » T.Sipil Konsentrasi Bang.Gedung D3
Posted by tondoindra@gmail.com at 10/01/2013 08:44:24  •  1356 Views


PERBANDINGAN ANTARA WAKTU DAN BIAYA LIFT MATERIAL DENGAN MOBILE CRANE PADA GEDUNG TRAINING CENTER IAIN SURABAYA

TIME AND COST COMPARISON BETWEEN THE IMPLEMENTATION OF LIFT MATERIAL AND MOBILE CRANE AT BUILDING TRAINING CENTER IAIN SURABAYA

Author :
OKTAVIANTO, MOCHAMAD IRFAN ( 3109030020 )
TOVANI, RIVAN




ABSTRAK

Gedung Training Center IAIN Surabaya adalah gedung yang kami jadikan bahan pada proyek akhir kami. Pada pelaksanaan pekerjaan konstruksi pembangunan gedung ini faktor waktu dan biaya sangat diperhatikan mengingat permasalahan yang kami bahas mengenai perbandingan waktu dan biaya antara pelaksanaan dengan lift material dan mobile crane. Pada pengerjaan tugas proyek akhir kami menggunakan alat berat mobile crane untuk mempercepat waktu pelaksanaan proyek. Dan setelah kami analisis antara waktu dan biaya pelaksanaan didapatkan hasil bahwa waktu yang diperlukan dalam sistem pelaksanaan menggunakan lift material 26 minggu secara keseluruhan pekerjaan sedangkan pelaksanaan dengan sistem pelaksanaan dengan mobile crane membutuhkan waktu lebih cepat yaitu 21 minggu secara keseluruhan pekerjaan. Dalam perbandingan biaya sistem pelaksanaan dengan lift material untuk biaya langsung dikeluarkan sebesar Rp 4.652.610.471 dan untuk biaya tidak langsung dikeluarkan sebesar Rp 105.700.000sedangkan sistem pelaksanaan dengan mobile crane untuk biaya langsung dikeluarkan sebesar Rp 4.710.198.017 dan untuk biaya tidak langsung dikeluarkan sebesar Rp 63.100.000.


ABSTRACT

Building of Training Center IAIN Surabaya is a building that we made as a source for our final project. In the implementation of construction works from this building time and cost factors are concerned considering that the problems we discuss are about the comparison between time and cost of the implementation lift material by using mobile crane.For doing this final project we use heavy equipment mobile crane to quicken the projects implementation period.And implementation analyzing the time and cost the result shows that the time for implementation lift material is 26 weeks of overall works while the time for implementation mobile crane is faster than cast in-situ plate its 21 weeks of overall works. In a cost comparison the implementation with lift material for the direct cost is Rp 4.652.610.471 and for the indirect cost is Rp 105.700.000 while the implementation with mobile crane for the direct cost is Rp 4.710.198.017 and for the indirect cost is Rp 63.100.000.



KeywordsBiaya;waktu
 
Subject:  Gedung - perkiraan
Contributor
  1. Ir. Kusumastuti, MT
Date Create: 10/01/2013
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-paper-31021120001723
Collection ID: 31021120001723
Call Number: RSS 692.5 Okt p


Source
Paper and presentation of Civil Engineering, RSS 692.5 Okt p, 2013

Coverage
ITS COMMUNITY

Rights
Copyright @2012 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-paper-31021120001723-23184.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.80.26.116
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan