EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » TEKNIK SIPIL - D3
Posted by aprill@is.its.ac.id at 22/08/2014 17:46:30  •  955 Views


THE COST CALCULATION AND PLANNING OF CONTROLLER INSTRUMENTS OF TIME COST AND QUALITY AT FACULTY OF MEDICINE HANG TUAH UNIVERSITY SURABAYAS PROJECT USING STEEL DECK

Author :
TARMIDZI, NIZAR ( 3110030010 )
ERLANGGA, TUBAGUS MOCH SATRIA




ABSTRAK

Proyek Fakultas Kedokteran Umum Universitas Hang Tuah Surabaya terdiri dari tiga blok blok satu dan tiga terdiri dari bangunan 4 lantai sementara blok dua terdiri dari bangunan 5 lantai. Proyek ini dibangun untuk gedung perkuliahan. Pada proyek akhir ini dilakukan perhitungan anggaran biaya dan merencanakan instrumen pengendali waktu biaya dan mutu dengan menggunakan steel deck. Berdasarkan perhitungan dan analisa pembangunan struktur gedung Fakultas Kedokteran Umum Universitas Hang Tuah Surabaya ini dapat diselesaikan selama 366 hari atau sama dengan 61 minggu dan membutuhkan biaya sebesar Rp. 17.477.064.599- Penggunaan metode earned value untuk menganalisis progres kinerja biaya dan waktu proyek menampilan informasi yang lebih progresif dibanding kurva S konvensional yang berguna untuk memonitor dan mengevaluasi proyek pada baseline tertentu dan masa mendatang. Metode ini memprediksi kerugian biaya dan waktu karena irama kerja yang cendrung lambat sehingga tambahan durasi proyek dan biaya akhirnya dapat dihitung dengan pendekatan matematis yang selanjutnya dapat digunakan untuk menentukan tindakan koreksi yang akan dilakukan.


ABSTRACT

The project of Faculty of Medicine Hang Tuah University Surabaya is composed by three block buildings. The first and third block are composed by four stories and the second block is composed by five stories. This project is built for college building. In this project the cost calculation and planning of controller instruments of time cost and quality using steel deck are made. Based on analysis and calculation the buildings structure of Faculty of Medicine Hang Tuah University Surabaya are finished in 366 days or 61 weeks. The cost of buildings structure are needeed costs as big as Rp. 17.477.064.599- The using of earned value methode for analyzing costs and time progress of project show more progressive information than those of conventional S curve it is useful to control and evaluate the project at the spesific baseline and future of project. This methode predict the loss of costs and time that caused by slow moving of project then the addition of costs and time can be counted mathematically and it can be used to make a decision.



KeywordsSteel deck; Perhitungan biaya; Perencanaan instrumen pengendali; Waktu; Biaya; Mutu
 
Subject:  Bangunan - Perkiraan
Contributor
  1. Ir. Akhmad Yusuf Zuhdy, PG.Dip.Plg.
Date Create: 22/08/2014
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-paper-31021140004117
Collection ID: 31021140004117
Call Number: RSS 692.5 Tar p


Source
Presentations, Civil Engineering, RSS 692.5 Tar p, 2014

Coverage
ITS Community

Rights
Copyright @2014 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-paper-30749-3110030010,3110030094-Presentation-1.pdf - 552 KB
  2.  ITS-paper-30749-3110030010,3110030094-Presentation-2.pdf - 485 KB
  3.  ITS-paper-30749-3110030010,3110030094-Presentation-3.pdf - 1023 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 10.199.6.2
using CCBot/2.0 (https://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2021 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan