EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » Manajemen Asset - S2
Posted by aprill@is.its.ac.id at 28/08/2015 22:03:41  •  703 Views


ANALISA RISIKO KONTRAK BERBASIS KINERJA KBK PADA PENINGKATAN JALAN NASIONAL STUDI KASUS JALAN NASIONAL DI WILAYAH BBPJN V SURABAYA

RISK ANALYSIS OF PERFORMANCE BASED CONTRACT PBC ON NATIONAL ROAD IMPROVEMENT PROJECT Case Study National Roads in the Region of BBPJN V Surabaya

Author :
SUJATSI, RAHMANITA ( 3111 207 828 )




ABSTRAK

Sistem kontrak tradisional untuk pemeliharaan jalan nasional memiliki beberapa kendala terutama kualitas pekerjaan konstruksi dan pemeliharaannya. Salah satu cara yang dilakukan pemerintah adalah merubah sistem pengadaan tradisional menjadi sistem Kontrak Berbasis Kinerja KBK. Penelitian ini bertujuan menganalisa risiko pada proyek peningkatan jalan yang menggunakan Kontrak Berbasis Kinerja KBK. Metode survei dan penyebaran kuesioner kepada responden digunakan untuk mendapatkan variabel risiko terpenting. Responden dalam penelitian ini adalah pengguna jasa dan penyedia jasa pada proyek peningkatan jalan dengan KBK. Obyek penelitian ini adalah proyek peningkatan jalan dengan KBK di wilayah BBPJN V Surabaya. Variabel risiko yang diperoleh dianalisa dengan analisa statistik deskriptif kemudian untuk mendapatkan nilai risiko dengan Probability Impact Grid. Risiko-risiko yang terpenting pada pelaksanaan peningkatan jalan nasional dengan Kontrak Berbasis Kinerja KBK yaitu pada tahap perencanaan adalah tidak jelasnya kebutuhan pemilik proyek pada tahap pengadaan adalah keterlibatan pemerintah daerah pada tahap konstruksi adalah biaya yang tersedia tidak cukup dan pada tahap pemeliharaan adalah beban berlebih kendaraan.


ABSTRACT

Traditional contract system for the maintenance of national roads has several problems especially on its quality of construction and maintenance. One solution used by the government to overcome the problems is by shifting from the traditional procurement system to Performance Based Contract PBC system. The objective of the study was to analyze the risk on the road improvement project using Performance Based Contracting. Survey and questionnaires to the respondents were used to obtain the most important risk variables. Respondents in this study were the service users and the service providers on PBC road improvement project. Object of this research was the PBC road improvement projects in the region of BBPJN V Surabaya. Risk variables are analyzed with descriptive statistical analysis and then to get the level of risk was determined using the Probability Impact Grid. The most important risks in the implementation of PBC on national road improvement in the planning stages was unclear project owners in the procurement stage was the involvement of local authorities in the construction phase was the inadequate budget and in the maintenance phase was the vehicles excess load.



KeywordsKontrak Berbasis Kinerja (KBK); peningkatan jalan; risiko; wilayah BBPJN V Surabaya
 
Subject:  Manajemen risiko
Contributor
  1. Ir. I Putu Artama Wiguna, PhD.
Date Create: 28/08/2015
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-paper-31121150007231
Collection ID: 31121150007231
Call Number: RTS 658 155 Suj a


Source
Paper and Presentations, Civil Engineering, RTS 658 155 Suj a, 2015

Coverage
ITS Community

Rights
Copyright @2015 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-paper-31121150007231-38645.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.198.52.8
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan