EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » S1 Teknik Sipil - Lintas Jalur
Posted by fandikaaqsa@its.ac.id at 25/02/2016 09:10:24  •  701 Views


ANALISA DAN PENGUKURAN POTENSI RISIKO KECELAKAAN KERJA DENGAN MENGGUNAKAN METODE APMM ACCIDENT POTENTIAL MEASUREMENT METHOD PADA PROYEK PEMBANGUNAN DORMITORY 5 LANTAI AKADEMI TEKNIK KESELAMATAN DAN PENERBANGAN SURABAYA

ANALYSIS AND MEASUREMENT OF POTENTIAL RISKS OF A WORK ACCIDENT BY USING THE APMM METHOD ACCIDENT POTENTIAL MEASUREMENT METHOD ON THE 5 FLOORS DORMITORY BUILDING IN AKADEMI TEKNIK KESELAMATAN DAN PENERBANGAN SURABAYA

Author :
JUNAEDI, TAUFIQ ( 3111106024 )




ABSTRAK

Banyaknya ketidakpastian dalam suatu proyek konstruksi dapat mengakibatkan munculnya berbagai macam risikotermasuk di dalamnya kecelakaan kerja.Risiko merupakan efek kumulasi peluang dari kejadian yang tidak pasti yang dapat mempengaruhi tujuan dan sasaran proyek. Pada penelitian ini bertujuan untuk mengkuantifikasi risiko kecelakaan kerja menggunakan metode APMM Accident Potential Measurement Method. APMM Accident Potential Measurement Method merupakan gabungan dari metode Failure Tree Analysis FTA dan Task Demand Assessment TDA. Identifikasi dengan menggunakan metode Failure Tree Analysis FTA dimulai studi literatur dan survey pendahuluan. Responden penelitian ini adalah Project Manager Site Engineeering Site Manager dan Staff lapangan yang menangani Proyek Pembangunan Gedung Dormitory 5 Lantai. Dari FTA akan diketahui faktor faktor dan juga kombinasi penyebab yang dapat menyebabkan terjadinya potensi kecelakaan yang berasal dari perilaku para pekerja berdasarkan karakteristik kegiatan proyek dan faktor ergonomiperilaku kerja. Dengan mengunakan Task Demand Assessment TDA akan diidentifikasi faktor faktor yang menyebabkan terjadinya potensi risiko kecelakaan yang diidentifikasi dan ditinjau berdasarkan karakteristik kegiatan proyekdan faktor ergonomiperilaku dari para pekerja dengan menggunakan metode FTA Fault Tree Analysis. Untuk studi kasus digunakan proyek pembangunan dormitory 5 lantai akademi teknik keselamatan dan penerbangan ATKP Surabaya. Berdasarkan dari penelitian hasil yang didapat adalah nilai dari potensi risiko yang dominan yang mungkin terjadi pada proyek pembangunan dormitory 5 lantai akademi teknik keselamatan dan penerbangan ATKP Surabaya yaitu terluka saat bekisting ambruk pada pekerjaan bekisting sebesar 2180 terjatuh pada saat pengecoran pada pekerjaan pengecoran sebesar 2180terjatuh dari ketinggian pada pekerjaan pemasangan dinding batu bata dan plesteran sebesar 1800terjatuhterpeleset dari ketinggian pada pekerjaan pengecatan eksterior sebesar 1860dan terjatuh karena kehilangan keseimbangan pada pekerjaan atap polycarbonate sebesar 1700. Risiko kecelakaan kerja berpotensi tinggi dapat diperkirakan terjadi pada saat durasi pekerjaan mencapai 70 - 100 pada pelaksanaan proyek pembangunan dormitory 5 lantai akademi teknik keselamatan dan penerbangan ATKP Surabaya.


ABSTRACT

Many uncertainties in a construction project may result in the emergence of a wide range of risk included work accident within it. The risk is the effect the accumulation of chances of these events were uncertain that could affect the purpose and objective of the project. This research aims to quantify the risk of work accidents APMM method Accident Potential Measurement Method. APMM Accident Potential Measurement Method is a combination of Failure Tree Analysis FTA methodand Task Demand Assessment TDAmethod. Risk identification by using Failure Tree Analysis FTA method.Beginning with the study of literature and preliminarysurvey. The respondents of the research is Project Manager Site Engineeering Site Manager andfield staff who worked on the project construction of dormitory 5 floors. Of the FTA will be known the factors and the combination that can causes occurrence of the accident potential derived from the behavior of workers based on the characteristics of the activities of the project factors and ergonomicswork behavior of workers. By using Task Demand Assessment TDA methodwill be indentifying the factors which causethe occurrence of risk potential andWill be reviewed based on characteristic of the projects activitiesandergonomic factors behavior of the workers by using FTA Fault Tree Analysis method. Cases used to study the project dormitory 5 floors atakademi teknik keselamatan dan penerbangan ATKP Surabaya. Based on the results obtained from the study was the value of the potential risks of which may happen to the dormitory building project 5 floorsat akademi teknik keselamatan dan penerbangan ATKP Surabaya the wounded when the formwork collapsed on the job of formworkas much as 2180 fall at the time of concrete casting on the job of concrete casting as much as 2180Fall down from a height upon the work of the installation of bricks and plastering of a wall as much as 1800Fell slipped from a height upon the exterior of the job of painting as much as 1860Losing his balance and fell on the job for apolycarbonate roof as much as 1700.The risk of potentially higher work accident can be expected to occur during the duration of the work achieved 70 - 100 on the Construction project in the dormitory 5th floorat akademi teknik keselamatan dan penerbangan ATKP Surabaya.



KeywordsRisiko; kecelakaan kerja; APMM
 
Subject:  Manajemen resiko; Manajemen proyek
Contributor
  1. Trijoko Wahyu Adi, ST., MT., PhD
  2. Cahyono Bintang Nurcahyo, ST., MT
Date Create: 25/02/2016
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-paper-31121150008515
Collection ID: 31121150008515
Call Number: RSS 658.155 Jun a


Source
Paper and presentation of Civil Engineering, RSS 658.155 Jun a, 2014

Coverage
ITS Community

Rights
Copyright @2016 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-paper-40353-3111106024-paper.pdf - 535 KB
  2.  ITS-paper-40353-3111106024-presentation.pdf - 3600 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.196.47.128
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan