EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » Kimpraswil Kons.Bang. Gedung D3
Posted by fandikaaqsa@its.ac.id at 29/03/2016 10:17:00  •  716 Views


TIME AND COSTS CALCULATION OF DEVELOPMENT PROJECTS RUSUNAWA UNIVERITAS MUHAMMADIYAH SIDOARJO BUILDING USING PRECAST HALF SLAB AT FLOOR PLATE STRUCTURES

PERHITUNGAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN RUSUNAWA UNIVERSITAS MUHAMMADIYAH SIDOARJO DENGAN MENGGUNAKAN PRECAST HALF SLAB PADA PLAT LANTAI

Author :
UTOMO, PANDU PRASETYO ( 3111030092 )
READY, ERWIN




ABSTRAK

Pada pelaksanaan pekerjaan konstruksi proyek pembangunan Rusunawa Universitas Sidoarjo terdiri dari 3 lantai dengan panjang 614 m lebar 136 m tinggi 109 m dan luas bangunan 83504 m diperlukan perencanaan metode pelaksanaan. Dengan membagi 2 segmen untuk memaksimalkan kinerja dari peralatan konstruksi tersebut agar dicapai suatu proyek dengan biaya dan waktu pelaksanaan yang optimal. Pada pengerjaan proyek akhir ini kami merubah metode pelaksanaan pada pengerjaan pelat dengan menggunakan precast half slab. Penggunaan plat precast half slab ini diharapkan dapat mempercepat waktu pelaksanaan dan mengurangi biaya. Berdasarkan dari hasil analisa proyek akhir ini pengerjaan plat pada Rusunawa Universitas Sidoarjo dapat diselesaikan selama 10 hari untuk lantai 2 10 hari untuk lantai 3 dan 7 hari untuk lantai dak dengan total biaya sebesar Rp. 873609031.40. Sedangkan perhitungan biaya awal dari proyek ini adalah sebesar Rp. 635.107.212 dengan rincian pelaksanaan pengerjaan plat untuk lantai 2 selama 25 hari 25 hari untuk lantai dan 23 hari untuk lantai dak. Hal ini menunujukkan bahwa penggunaan precast half slab sebagai alternatif pergantian metode pelaksanaan dapat mempercepat pekerjaan struktur proyek.


ABSTRACT

On the implementation of construction works construction projects Rusunawa Sidoarjo University consists of 3 floors with a length of 61.4 m width 13.6 m 10.9 m high and 835.04 m building area required planning implementation methods. By dividing the two segments to maximize the performance of the construction equipment in order to achieve a project with cost and time optimal implementation. At the end of the construction project we changed the method of execution at the plate craftsmanship by using half precast slab. The use of precast plate half slab is expected to accelerate implementation time and reduce costs. Based on the analysis of the results of this final project working on Rusunawa University Sidoarjo plate can be completed for 10 days to floor 2 floor 3 to 10 days and 7 days for DAK floors with a total cost of Rp. 873609031.40. While the calculation of the initial cost of the project is Rp. 635 107 212 with details of implementation to the 2nd floor plate workmanship for 25 days 25 days and 23 days for the floor to floor no. This menunujukkan that the use of precast half slab as an alternative method of implementation of the change can speed things up a project structure.



KeywordsPerhitungan waktu dan biaya menggunakan precast half slab
 
Subject:  Bangunan, struktur dan desain
Contributor
  1. Ir. Kusumastuti, MT
Date Create: 29/03/2016
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-paper-31121150008715
Collection ID: 31121150008715
Call Number: RSS 690.831 Uto p


Source
Paper and presentation of Civil Engineering, RSS 690.831 Uto p, 2014

Coverage
ITS Community

Rights
Copyright @2016 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-paper-40959-3111030092-3111030096-presentation.pdf - 571 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.225.57.120
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan