EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » Pendidikan Profesi Arsitek
Posted by tondoindra@gmail.com at 14/10/2014 21:28:18  •  1081 Views


PERENCANAAN MALL DI KAWASAN KEDUNG BARUK SURABAYA

SHOPPING MALL PLANNING IN KEDUNG BARUK DISTRICT OF SURABAYA

Author :
PUTRI, ANISA IMANIAR EKA ( 3211111004 )




ABSTRAK

Surabaya Timur menjadi kawasan pengembangan kota yang patut diperhitungkan. Pembangunan jalan MERR di kawasan Kedung Baruk tentunya akan menjadi potensi yang menguntungkan dan memberikan peluang-peluang baru bagi investor. Saat ini shopping mall sangat diminati oleh masyarakat dan berkembang sangat pesat dalam beberapa tahun terakhir. Sayangnya pembangunan shopping mall belum merata dan cenderung jauh dari permukiman penduduk dan sebagian besar berada di pusat kota dan CBD Central Business District. Alasan tersebut melatar belakangi perancangan shopping mall yang diharapkan dapat memacu perkembangan kawasan memudahkan masyarakat sekitar dalam memenuhi kebutuhannya sekaligus dapat menjadi investasi yang menguntungkan. Permasalahan global warming yang diderita oleh bumi saat ini haruslah dapat disikapi dengan bijaksana. Karena itulah konsep perancangan shopping mall ini berbeda dari konsep shopping mall yang telah ada. Penekanan terhadap bangunan hemat energi dan ruang luar merupakan beberapa fokus utama yang diharapkan mampu menjadi center of vocal point dan green living style. Konsep perancangan mall yang hemat energi diantaranya teraplikasi pada sistem pengadaan air bersih dengan proses daur ulang pemilihan material fasade yang dapat meminimalisir radiasi panas optimalisasi ruang hijau pada tapak dan sebagainya.


ABSTRACT

East Surabaya will be the urban development that should be taken into account. MERR road construction in the Kedung Baruk district certainly will be potential benefits and provide new opportunities for investor. Currently the shopping mall is very sought after by the community and growing very rapidly in recent years. Unfortunately development of the shopping mall not evenly and inclined away from the residential and mostly located in city center and CBD Central Business District. That reason drive design shopping mall expected to spur that regional development facilitate the public about in fulfilling their needs at the same time can become a profitable investment. Global warming problems that suffered by Earth today must be able to be handled wisely. Because of that Concept design of the shopping mall is different from the concept of the shopping mall that has existed. Energy efficient buildings and landscaping is one of the main focuses that expected to become the center of vocal point and green living style. Concept design of the mall including energy saving applied on the system of procurement of the clean water by the process of recycling faade material that can minimize heat radiation optimization of green space on the site and so on.



Keywordsmall; shopping mall; perancangan; hemat energi; green living style; energy efficient building; design; planning
 
Subject:  Pusat pertokoan
Contributor
  1. Ir. Erwin Sudarma, MT.
  2. Ir. Muhammad Faqih, MSA., PhD
Date Create: 19/07/2012
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-paper-32021140005408
Collection ID: 32021140005408
Call Number: RPA 725.21 Put p


Source
Paper And Presentation of Architecture RPA 725.21 Put p, 2014

Coverage
ITS Community

Rights
Copyright @2012 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-paper-32021140005408-32459.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 23.20.223.212
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2018 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan