EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » MMT - Pasca Sarjana ITS
Posted by tondoindra@gmail.com at 30/03/2016 14:12:37  •  690 Views


MATURE OIL FIELD NON-PRODUCING CLUSTER MANAGEMENT DECISION USING ANALYTIC NETWORK PROCESS ANP

PENGAMBILAN KEPUTUSAN TERHADAP MANAJEMEN KLUSTER NON-PRODUCING DI LAPANGAN MINYAK TUA MENGGUNAKAN ANALYTIC NETWORK PROCESS ANP

Author :
NENNY ( 9111201808 )




ABSTRAK

Lapangan X yang berlokasi di Delta Mahakam Kalimantan Timur telah berproduksi selama lebih dari 40 tahun di bawah pengoperasian TEXPI. Lapangan tersebut saat ini dalam fase penurunan dengan hanya 25 sumur berproduksi dan beberapa kluster produksi tidak lagi digunakan. Ada dua opsi manajemen kluster nonproducing yaitu preservasi dan abandonmen. Keputusan untuk manajemen kluster nonproducing ini memerlukan diskusi yang lama karena melibatkan kepentingan yang bertentangan antara Divisi Field Operation yang memilih abandonmen untuk tujuan pengurangan biaya operasional dan Divisi Geoscience serta Pengembangan yang memilih preservasi untuk mengantisipasi pengembangan kembali lapangan di masa yang akan datang dengan mengaplikasikan teknologi baru. Kluster X-I salah satu dari kluster nonproducing di Lapangan X diambil sebagai studi kasus. Metodologi yang digunakan dalan menentukan kriteria adalah review literatur dan diskusi dengan ahli. Hubungan antar kriteria diverifikasi dengan metode Decision Making Trial and Evaluation Laboratory DEMATEL dan pengambilan keputusan dilakukan dengan metode Analytic Network Process ANP. Data untuk DEMATEL dan ANP didapatkan dari kuesioner yang diberikan pada para ahli di TEXPI yaitu Manajer Operasi Manajer Geoscience dan Manajer Pengembangan serta Manajer Distrik sebagai perwakilan Top Management. Ada lima kriteria untuk pengambilan keputusan dan mereka saling berhubungan yaitu Economic Performance Operational Safety Public Relation Organization Technology and Security. Dari masukan manajemen Divisi Geoscience dianggap sebagai kontributor kunci pada pengambilan keputusan dengan prioritas sebesar 71.7. Berdasarkan hasil simulasi ANP opsi terpilih untuk manajemen kluster non-producing X-I adalah Preservasi dengan bobot sebesar 62.3.


ABSTRACT

The Field of X located in Mahakam Delta East Kalimantan has been producing for more than 40 years under TEXPI operatorship. It is currently in declining phase with only 25 drilled wells producing and several production clusters are no longer in use. There are two options for managing the non-producing cluster i.e. preservation and abandonment. The decision for non-producing cluster management takes long discussion as it involves conflicting interests between Field Operation Division which prefer abandonment for cost saving purpose and Geoscience and Development Divisions which prefer preservation to anticipate future field revival by applying new technology. Cluster X-I one of Field X non-producing cluster is taken as case study. The methodology used for criteria definition is literature review and expert discussion. The criteria interrelation is verified by Decision Making Trial and Evaluation Laboratory DEMATEL and the decision making is performed by Analytic Network Process ANP method. The input for DEMATEL and ANP is obtained by questionnaires distribution to TEXPIs experts which are Operation Manager Geoscience Manager and Development Manager and one District Manager as Top Management representative. There are five criteria for decision making that are confirmed interrelated namely Economic Performance Operational Safety Public Relation Organization Technology and Security. From management feedback Geoscience Division is considered as key contributor to the decision making with priority of 71.7. Based on the ANP simulation result the selected option for non-producing Cluster X-I is Preservation with the weight of 62.3



Keywordsmature oil field, multiple criteria decision making, ANP, DEMATEL, Delta Mahakam
 
Subject:  Pengambilan Keputusan
Contributor
  1. Christiono Utomo, ST, MT, PhD
Date Create: 30/03/2016
Type: Text
Format: PDF
Language: Indonesian
Identifier: ITS-paper-91121150008729
Collection ID: 91121150008729
Call Number: RTMT 658.403 Kri m


Source
Paper And Presentation Of Magister Management Technology RTMT 658.403 Kri m, 2016

Coverage
ITS Community

Rights
Copyright @2016 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Summary ]

ITS-paper-91121150008729-40988.pdf




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.198.54.142
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan