EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Paper and Presentation » Manajemen Proyek-S2 MMT
Posted by anisw@its.ac.id at 17/05/2016 09:12:30  •  494 Views


EVALUATION OF COST OVERRUN ON THE IMPLEMENTATION OF THE NATIONAL ROAD PROJECT IN THE PROVINCE OF EAST JAVA USING STATISTICAL PROCESS CONTROL SPC

EVALUASI COST OVERRUN PADA PELAKSANAAN PROYEK JALAN NASIONAL DI PROVINSI JAWA TIMUR DENGAN METODE STATISTICAL PROCESS CONTROL SPC

Author :
ANNAS, ACHIRUL APRISAL ( 9112202810 )




ABSTRAK

Kompleksitas pada pelaksanaan Proyek Jalan Nasional di Provinsi Jawa Timur seringkali menyebabkan perbedaan pada apa yang telah direncanakan dengan pelaksanaan dilapangan sehingga selalu menghadapi masalah yang sama seperti terjadinya keterlambatan pekerjaan dan pembengkakan biaya cost overrun. Berdasarkan fakta dilapangan menunjukkan bahwa sekitar 20 dari total pelaksanaan proyek jalan nasional yang ada di Kementerian Pekerjaan Umum mengalami pembengkakan biaya httpemonitoring.pu.go.id oleh karena itu perlu dilakukan evaluasi cost overrun pada pelaksanaan proyek jalan nasional di Provinsi Jawa Timur. Penelitian ini dilakukan dengan tujuan untuk mengetahui faktor penyebab terjadinya cost overrun dengan mengidentifikasi peristiwa resiko yang terjadi pada pelaksanaan proyek jalan nasional di Provinsi Jawa Timur dalam periode tahun 2011 sd tahun 2013. Selanjutnya hasil identifikasi tersebut akan dilakukan evaluasi besaran cost overrun dengan menggunakan metode Statistical Process Control SPC yaitu melakukan pemetaan faktor penyebab cost overrun dengan pareto diagram melakukan analisis akar permasalahan yang terjadi dengan fishbone diagram serta melakukan analisa besaran cost overrun dengan control chart dan selanjutnya dilakukan tindakan atas penanganan resiko dari akar permasalahan yang didapat dengan melakukan wawancara kepada expert serta kajian literatur di lingkungan kementerian Pekerjaan Umum Provinsi Jawa Timur. Hasil evaluasi cost overrun dari peristiwa resiko yang sudah terjadi pada pelaksanaan proyek jalan nasional Provinsi Jawa Timur didapatkan 29 peristiwa resiko yang dikelompokkan dalam 5 faktor penyebab terjadinya cost overrun yaitu Faktor Perubahan Desain 4211 Faktor Koordinasi Komunikasi yang buruk dalam organisasi 2105 Faktor Kesalahan dalam Pengambilan Keputusan 1754 Faktor Keterlambatan dalam Penyerahan Penggunaan Lahan 1404 dan Faktor Keterlambatan dalam Pembayaran Termin 526.


ABSTRACT

The complexity of the implementation of the National Road project in East Java province often causes differences in what has been planned with the real implementation so it always faced the same problems such as the occurrence of the delay in the work and swelling costs cost overrun. Based on the facts the situation shows that around 20 of the total implementation of the existing national road projects in the public works Ministry is experiencing swelling costs httpemonitoring.pu.go.id hence the need for an evaluation of cost overrun on the implementation of the national road project in East Java province. This research was conducted with the aim to find out the cause of the occurrence factor of cost overrun by identifying the risk event occurring on the implementation of the national road project in East Java province in the period of 2011 sd by 2013. Furthermore the results of the evaluation will be carried out identification of quantity cost overrun by using the method of Statistical Process Control SPC which is doing the mapping of factors cause cost overrun with pareto diagram perform analysis of the roots of the problems occurred with the fishbone diagram as well as the analysis of quantity cost overrun with control chart and subsequently carried out action over the handling of the risk of root problems which is obtained by conducting interviews to expert as well as a review of the literature on the environment of the Ministry of public works of East Java province. Results of the evaluation of the cost overrun risk events that have occurred on national road projects in East Java province found 29 events are grouped in 5 risk factors cause the occurrence of cost overrun Factors namely Factor Design Change 4211 Coordinating and Communication Factor poor in organizations 2105 Factors mistakes in decision making 1754 Factor of delay in Delivery land use 1404 and Factor delay in Payment Terms 526.



KeywordsCost Overrun; Pelaksanaan Proyek Jalan nasional; Metode SPC
 
Subject:  NONE
Contributor
  1. Tri Joko Wahyu Adi, ST, MT, PhD
Date Create: 20/01/2015
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-paper-91121160008961
Collection ID: 91121160008961
Call Number: RTMT 658.404 Ann e


Source
Paper and Presentations, Magister Management Techonology, RTMT 658.404 Ann e, 2015

Coverage
ITS Community

Rights
Copyright @2016 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-paper-41524-9112202810-Paper.pdf - 361 KB
  2.  ITS-paper-41524-9112202810-Presentation.pdf - 2658 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.162.181.75
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2017 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan