EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id








Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Taufik Rachmanu


Moh. Fandika Aqsa


Tondo Indra Nyata


Ansi Aflacha Putri


Aprillia Tri Wulansari


Dewi Eka Agustina




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely
Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

Still Confuse?
Please read our User Guide

Keyword
Mode
Expanded Search (for Free text search only)
 
OR You May Search Our Knowledges Using Google Customize Search :

Custom Search

ITS » Undergraduate Theses » Teknik Perkapalan Ekstensi - S1
Posted by anis at 22/11/2008 14:38:02  •  14303 Views


ANALISA TEKNIS PEMBANGUNAN KAPAL PERINTIS 350 TON DWT DALAM HUBUNGANNYA DENGAN PEMBANGUNAN KAPAL-KAPAL TUG BOAT SECARA SERI (STUDI KASUS DI DOK DAN GALANGAN KAPAL PT BEN SANTOSA)

TECHNICAL ANLYSIS OF DEVELOPMENT OF PERINTIS COAST 350 TON DWT IN ITS RELATON WITH THE DEVLOPMENT OF TUG BOAT SHIP BREAK EVENLY (CASE STUDY IN DOCK AND SHIPYARD PT. BEN SANTOSA)

Created by :
Kurniawan, Andi 



SubjectGalangan kapal
KeywordMetode Semi Tendem
Perencanaan dan Penjadwalan

Description:

Ketepatan waktu penyelesaian atau delivery time pada pembangunan sebuah kapal tergantung dari sistem perencanaan dan penjadwalan yang dibuat oleh pihak galangan sebelum proses produksi pembangunan kapal baru dimulai. Dalam tugas akhir ini dilakukan pengaturan kembali sistem perencanaan dan penjadwalan dalam pembangunan 4 buah tug boat dan 2 buah kapal perintis 350 ton DWT yang telah dibuat dok dan galangan kapal PT Ben Santosa. Hasil dari tugas akhir ini menunjukkan bahwa dengan metode semi tendem maka pembangunan 4 buah kapal tug boat dan 2 buah kapal perintis dapat diselesaikan selama 46 minggu dan lebih cepat dari rencana awal yang dibuat oleh PT. Ben Santosa yaitu 64 minggu dengan penambahan 1407,6 JO di bengkel produksi dan 4936,8 JO di landasan peluncuran. Pengaturan areal building berth dilakukan dengan memindahkan areal penimbunan pelat dan profil sementara. Dan peralatan produksi yang dimiliki galangan PT. Ben Santosa masih mencukupi.


Alt. Description

Delivery time of new ship building depend on planning and scheduling system made by ship yard before production process of building ship newly started. In this final duty conducted by restructuring of planning and scheduling system in development 4 of tug boat and 2 of perintis coaster 350 ton DWT which have been made by dock and dockyard of PT Ben Santosa. Result from this final duty indicate that with the semi tendem method hence development 4 of tug boat and 2 of perintis coaster can be finished by during 46 week and is quicker than plan of early which is made by PT. Ben Santosa that is 64 week with the addition 1407,6 JO in workshop produce and 4936,8 JO in building berth. arrangement of building berth area done by removing areal conglomeration lisp and profile of whereas. And production equipments owned by the yard PT. Ben Santosa still answer the demand.

Contributor:
  1. Ir. Soejitno.
Date Create:22/11/2008
Type:Text
Format:pdf.
Language:Indonesian
Identifier:ITS-Undergraduate-3100008031558
Collection ID:3100008031558
Call Number:RSPe 623.83 Kur a


Source :
Undergraduate theses, DEPARTMENT OF NAVAL ARCHITECT RSPe 623.83 Kur a, 2007

Coverage :
ITS Community Only

Rights :
Copyright @2007 by ITS Library. This publication is protected by copyright and permission should be obtained from the ITS Library prior to any prohibited reproduction, storage in a retrievel system, or transmission in any form or by any means, electronic, mechanical, photocopying, recording, or likewise. For information regarding permission(s), write to ITS Library


Publication URL :
http://digilib.its.ac.id/analisa-teknis-pembangunan-kapal-perintis-350-ton-dwt-dalam-hubungannya-dengan-pembangunan-kapalkapal-tug-boat-secara-seri-studi-kasus-di-dok-dan-galangan-kapal-pt-ben-santosa-2342.html




[ Free Download - Free for All ]

...No Files...

[ FullText Content - Please, register first ]

  1. ITS-Undergraduate-2342-4101109008-judul.pdf - 63 KB
  2. ITS-Undergraduate-2342-4101109008-bab1.pdf - 23 KB
  3. ITS-Undergraduate-2342-4101109008-bab2.pdf - 67 KB
  4. ITS-Undergraduate-2342-4101109008-bab3.pdf - 41 KB
  5. ITS-Undergraduate-2342-4101109008-bab4.pdf - 291 KB
  6. ITS-Undergraduate-2342-4101109008-kesimpulan.pdf - 16 KB
  7. ITS-Undergraduate-2342-4101109008-lampiran.pdf - 165 KB



Give your Comment here...


 10 Similar Document...



 10 Related Document...






HELP US !
You can help us to define the exact keyword for this document by clicking the link below :

Metode , Metode Semi Tendem , Penjadwalan , Perencanaan , Perencanaan dan Penjadwalan , Semi , Tendem , dan



POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan




53555246


Visitors Today : 1
Total Visitor : 2515801

Hits Today : 4857
Total Hits : 53555246

Visitors Online: 1


Calculated since
16 May 2012

You are connected from 10.199.13.5
using CCBot/2.0 (http://commoncrawl.org/faq/)


ITS Digital Repository Feeds



Copyright © ITS Library 2006 - 2014 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan