EMAIL: PASSWORD:
Front Office
UPT. PERPUSTAKAAN
Institut Teknologi Sepuluh Nopember Surabaya


Kampus ITS Sukolilo - Surabaya 60111

Phone : 031-5921733 , 5923623
Fax : 031-5937774
E-mail : libits@its.ac.id
Website : http://library.its.ac.id

Support (Customer Service) :
timit_perpus@its.ac.id




Welcome..guys!

Have a problem with your access?
Please, contact our technical support below:
LIVE SUPPORT


Moh. Fandika Aqsa


Davi Wahyuni


Tondo Indra Nyata


Anis Wulandari


Ansi Aflacha




ITS » Non Degree » TEKNIK SIPIL - D3
Posted by dee@its.ac.id at 29/12/2011 12:52:34  •  3939 Views


METODE PELAKSANAAN PEMBANGUNAN INTAKE DAN JARINGAN TRANSMISINYA DI KECAMATAN BALONGBENDO KABUPATEN SIDOARJO - JAWA TIMUR

IMPLEMENTATION METHODS FOR INTAKE BUILDING AND ITS TRANSMISSION PIPELINE AT SUB DISTRICT BALONGBENDO SIDOARJO EAST JAVA

Author :
YUVITA, ESTI  ( 3108030001 )
CANDRAWITADI, RENDI




ABSTRAK

Pembangunan intake dan jaringan pipa transmisinya dibangun untuk memenuhi kebutuhan air bagi penduduk Kecamatan Balongbendo dan sekitarnya. Untuk menambah cadangan kebutuhan air tersebut maka dibangun bangunan intake yang akan mengambil pasokan dari Kali Pelayaran yang merupakan salah satu pecahan dari Sungai Brantas yang kualitas dan kuantitas airnya layak untuk dikonsumsi sebagai sumber air baku. Dalam rangka pembangunan bangunan intake ini diperlukan beberapa tahapan pekerjaan yaitu pekerjaan persiapan pekerjaan bangunan intake bak pengumpul yang meliputi pekerjaan tanah beton dan pelengkap pekerjaan jaringan pipa. Saat ini proyek sudah berjalan dan telah selesai dengan menggunakan beberapa alat berat dan lain-lain. Dalam proyek akhir ini dilakukan 3 perbandingan yaitu lapangan analisis menurut waktu dan menurut biaya. Metode yang digunakan adalah menganalisis ulang alat berat dan membandingan HSPK Surabaya dan Sidoarjo. Hasil akhir perbandingan dan analisis yang didapat diketahui sebagai berikut a. Lapangan dengan total biaya Rp 7.421.895.62600 selama 750 bulan. b. Menurut waktu dengan total biaya Rp 7.230.556.69700 selama 330 bulan. c. Menurut biaya dengan total biaya Rp 7.255.182.20400 selama 398 bulan. Dari ketiga analisis tersebut dapat diketahui bahwa analisis menurut waktu paling efisien dari segi biaya dan waktu.


ABSTRACT

The intake building and its transmission pipeline are built to fulfill requirement of water for residents in Balongbendo district and Krian. For increasing the water reserve requirement and then built the building intake that will take supply from Pelayaran river. The pelayaran river is one of the fraction from brantas river which has good quality and quantity of water suitable for consumption as a source of standard water. In order to intake this building development required several stages of assignmentwhich is the preparation of assignment assignment of the building intake and the tub of collection that includes the ground work the concrete and complementary and the assignment of pipeline. Currently the projects are already underway and was finished by using some heavy machinery and etc. In the end of the project is done three ratio namely the ground analyzes by time and cost. The method that uses is to analyze the re-heavy machinery and comparing HSPK Surabaya and Sidoarjo. The final result of ratio and analyzes that obtained is known as follows a. The field with a total cost of Rp 7.421.895.62600 for 750 months. b. According to time with the total cost of Rp 7.230.556.69700 for 330 months. c. According to cost a total cost of Rp 7.255.182.20400 for 398 months. From the third analysis can be seen that analyzes according to the time the most efficient in terms of cost and time.



KeywordsMetode pelaksanaan; Intake; Pipa transmisi
 
Subject:  Konsumsi air;Pipanisasi;Teknik perpipaan
Contributor
  1. Tatas, ST., MT.
Date Create: 19/07/2011
Type: Text
Format: pdf
Language: Indonesian
Identifier: ITS-NonDegree-3100011044608
Collection ID: 3100011044608
Call Number: RSS 628.1 Yuv m


Source
Non Degree of Civil Engineering, RSS 628.1 Yuv m, 2011

Coverage
ITS Community

Rights
Copyright @2011 by ITS Library. This publication is protected by copyright and per obtained from the ITS Library prior to any prohibited reproduction, storage in a re transmission in any form or by any means, electronic, mechanical, photocopying, reco For information regarding permission(s), write to ITS Library




[ Download - Open Access ]

  1.  ITS-NonDegree-16988-3108030099-Abstract_id.pdf - 167 KB
  2.  ITS-NonDegree-16988-3108030099-Abstract_en.pdf - 165 KB




 Similar Document...




! ATTENTION !

To facilitate the activation process, please fill out the member application form correctly and completely

Registration activation of our members will process up to max 24 hours (confirm by email). Please wait patiently

POLLING

Bagaimana pendapat Anda tentang layanan repository kami ?

Bagus Sekali
Baik
Biasa
Jelek
Mengecewakan





You are connected from 54.226.47.198
using CCBot/2.0 (http://commoncrawl.org/faq/)



Copyright © ITS Library 2006 - 2016 - All rights reserved.
Dublin Core Metadata Initiative and OpenArchives Compatible
Developed by Hassan